NEW

Operated by PETEX (P-5 659782) in the WEREWOLF (CADDO 5500) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 30223District 7BField 96391250OilCasinghead gasSaveExport
Value, all time
$1.5 M
Sep 2008 – May 2026
Value, last 12 filed months
$61 k
at the published price for each month
Months reported
213
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1982-07-31
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition22,133 bbl$1,526,575
Casinghead gasProduction555 Mcf$1,531
Total$1,528,106

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.0762, -99.9272. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.07622, -99.92724 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,010 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,010 ft.

Completions filed
Oct 2008
1 of 1 wells

1 well

42-2073254816,010 ftOct 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (213)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

213 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 2026180089.753.15$16,155
Feb 20260063.503.75$0
Jan 2026187059.138.00$11,057
Dec 20250056.664.41$0
Nov 2025178058.593.93$10,429
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 2025178063.933.01$11,380
Jul 20250066.743.32$0
Jun 2025180066.483.13$11,966
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 2025186067.704.27$12,592
Feb 20250070.884.34$0
Jan 2025192074.324.28$14,269
Dec 2024182068.993.12$12,556
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 2024184075.632.06$13,916
Jul 20240079.932.15$0
Jun 2024183078.082.63$14,289
May 20240078.812.20$0
Apr 2024178084.451.66$15,032
Mar 20240080.301.55$0
Feb 2024179076.091.78$13,620
Jan 20240073.023.30$0
Dec 2023180071.262.61$12,827
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 2023180089.042.74$16,027
Aug 20230080.522.67$0
Jul 2023180074.852.64$13,473
Jun 20230068.962.26$0
May 2023168070.622.23$11,864
Apr 20230078.122.24$0
Mar 2023183072.852.39$13,332
Feb 20230075.112.47$0
Jan 2023167076.533.39$12,781
Dec 20220076.415.73$0
Nov 2022181085.005.65$15,385
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 2022181094.529.13$17,108
Jul 202200101.587.54$0
Jun 20221710115.097.98$19,680
May 202200109.378.43$0
Apr 20221540104.226.84$16,050
Mar 202200108.885.08$0
Feb 2022174091.054.86$15,843
Jan 20220081.844.54$0
Dec 2021178071.323.90$12,695
Nov 20210077.435.24$0
Oct 2021175079.795.71$13,963
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 2021171070.783.98$12,103
Jun 2021182069.493.38$12,647
May 20210063.483.02$0
Apr 2021179060.362.76$10,804
Mar 20210061.302.72$0
Feb 2021175057.805.55$10,115
Jan 20210050.412.81$0
Dec 2020183044.642.68$8,169
Nov 2020182038.772.71$7,056
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 2020174039.982.39$6,957
Jul 2020179038.371.83$6,868
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 2020179014.751.80$2,640
Mar 20200030.341.86$0
Feb 2020182049.881.98$9,078
Jan 20200057.252.09$0
Dec 2019172059.012.30$10,150
Nov 20190055.302.75$0
Oct 2019180053.472.42$9,625
Sep 2019030555.052.66$810
Aug 2019179053.112.30$9,507
Jul 20190056.272.46$0
Jun 2019178052.782.49$9,395
May 20190058.482.74$0
Apr 2019182062.632.75$11,399
Mar 20190056.803.06$0
Feb 2019182050.852.79$9,255
Jan 20190046.033.23$0
Dec 2018181046.594.19$8,433
Nov 20180052.934.24$0
Oct 2018182061.443.40$11,182
Sep 2018179059.543.11$10,658
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 2018168060.183.08$10,110
May 2018176065.382.90$11,507
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 2018183061.782.77$11,306
Jan 20180062.874.01$0
Dec 2017185057.272.92$10,595
Nov 2017184055.423.12$10,197
Oct 20170049.292.98$0
Sep 2017169047.523.09$8,031
Aug 20170045.373.00$0
Jul 2017177043.873.09$7,765
Jun 20170042.493.09$0
May 2017179045.373.26$8,121
Apr 20170047.933.21$0
Mar 2017184046.772.98$8,606
Feb 20170050.452.95$0
Jan 2017182049.413.42$8,993
Dec 20160048.763.72$0
Nov 2016190042.492.64$8,073
Oct 2016176046.193.09$8,129
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 2016173041.622.92$7,200
Jun 2016184045.352.69$8,344
May 20160042.521.99$0
Apr 2016181036.561.99$6,617
Mar 20160033.011.79$0
Feb 2016182026.472.06$4,818
Jan 2016169027.352.36$4,622
Dec 2015193032.362.00$6,245
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 2015183042.992.76$7,867
Aug 20150040.162.87$0
Jul 2015183048.152.95$8,811
Jun 201518725056.152.88$11,221
May 2015184055.212.96$10,159
Apr 20150049.822.71$0
Mar 2015189042.892.93$8,106
Feb 20150044.662.98$0
Jan 2015188043.433.10$8,165
Dec 20140054.693.59$0
Nov 2014189070.464.25$13,317
Oct 2014186078.303.90$14,564
Sep 20140086.164.05$0
Aug 2014187089.394.04$16,716
Jul 20140096.564.18$0
Jun 2014186098.164.74$18,258
May 20140094.734.73$0
Apr 2014189095.944.81$18,133
Mar 2014188095.895.06$18,027
Feb 20140097.406.19$0
Jan 2014190090.404.86$17,176
Dec 20130091.824.35$0
Nov 2013192088.853.74$17,059
Oct 20130097.423.78$0
Sep 20131880104.113.72$19,573
Aug 20131870104.253.52$19,495
Jul 201300102.523.72$0
Jun 2013180094.403.93$16,992
May 2013179094.834.15$16,975
Apr 20130093.964.28$0
Mar 2013189093.623.91$17,694
Feb 20130091.233.42$0
Jan 2013182091.603.42$16,671
Dec 20120086.773.42$0
Nov 2012194086.953.62$16,868
Oct 2012190089.383.40$16,982
Sep 20120094.672.92$0
Aug 2012187092.662.91$17,327
Jul 2012344085.133.02$29,285
Jun 2012185079.822.52$14,767
May 20120091.612.49$0
Apr 20121760101.652.00$17,890
Mar 201200105.052.22$0
Feb 20121920101.102.57$19,411
Jan 2012188098.092.73$18,441
Dec 2011191096.873.24$18,502
Nov 20110095.723.31$0
Oct 2011190084.983.65$16,146
Sep 20110083.623.99$0
Aug 2011189083.404.15$15,763
Jul 20110094.144.52$0
Jun 2011190092.904.64$17,651
May 20110098.134.40$0
Apr 20111890105.964.33$20,026
Mar 2011191096.364.06$18,405
Feb 20110085.644.18$0
Jan 2011182086.504.59$15,743
Dec 2010190085.734.35$16,289
Nov 20100080.843.80$0
Oct 2010191078.103.51$14,917
Sep 2010190072.633.98$13,800
Aug 20100073.684.42$0
Jul 2010189072.554.74$13,712
Jun 2010188070.364.91$13,228
May 2010190071.124.24$13,513
Apr 20100081.694.12$0
Mar 2010192078.394.39$15,051
Feb 20100073.585.44$0
Jan 2010189074.365.96$14,054
Dec 20090071.445.48$0
Nov 2009183074.593.75$13,650
Oct 2009191072.544.11$13,855
Sep 2009190065.543.06$12,453
Aug 20090067.423.22$0
Jul 2009190061.133.46$11,615
Jun 2009188066.163.90$12,438
May 2009190054.743.93$10,401
Apr 2009191046.773.59$8,933
Mar 2009193042.144.06$8,133
Feb 20090032.814.63$0
Jan 2009193035.865.37$6,921
Dec 2008193037.105.98$7,160
Nov 2008376055.496.86$20,864
Oct 2008382075.246.92$28,742
Sep 20081550101.767.88$15,773

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Oil                  180 bbl  × $ 89.75 =    $16,155
Casinghead gas         0 Mcf  × $  3.15 =         $0

────────────────────────────────────────────────────
Month total                                  $16,155

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/30223 is the state's own key, not one this site invented.