RIDDEL HEIRS

Operated by D.J. & T. ENERGY (P-5 196227) in the STEPHENS COUNTY REGULAR field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 6963District 7BField 85948001Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$372 k
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,255 leases and 4,008 wells, and the rule below applies to all of them.

Discovered
1916-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: CLASS 4 W/DAILY 150 = 6000 TO 8000'

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition8,476 bbl$367,857
Casinghead gasProduction1,137 Mcf$4,239
Total$372,096

144 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (5)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
20.0%
1 of 5 wells
With a plug date
0.0%
0 of 5 wells
Median depth
no depth filed
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
120.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
480.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

5 wells

42-429813825Yes
42-429813781
42-429813792
42-429813803
42-429813814

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240369.612.36$7
Aug 20240375.632.06$6
Jul 20240379.932.15$6
Jun 20240378.082.63$8
May 20240378.812.20$7
Apr 20240384.451.66$5
Mar 20240080.301.55$0
Feb 20240376.091.78$5
Jan 20240373.023.30$10
Dec 20230371.262.61$8
Nov 20230377.892.81$8
Oct 20230385.443.09$9
Sep 20230389.042.74$8
Aug 20230380.522.67$8
Jul 20230374.852.64$8
Jun 20230368.962.26$7
May 20230370.622.23$7
Apr 20230378.122.24$7
Mar 20230372.852.39$7
Feb 20230075.112.47$0
Jan 20230376.533.39$10
Dec 20220376.415.73$17
Nov 20220385.005.65$17
Oct 20220387.185.86$18
Sep 20220384.888.16$24
Aug 20220394.529.13$27
Jul 202203101.587.54$23
Jun 202203115.097.98$24
May 202203109.378.43$25
Apr 202203104.226.84$21
Mar 202203108.885.08$15
Feb 20220391.054.86$15
Jan 20220381.844.54$14
Dec 20210371.323.90$12
Nov 20210377.435.24$16
Oct 20210379.795.71$17
Sep 20210369.865.35$16
Aug 20210366.024.22$13
Jul 20210370.783.98$12
Jun 2021165369.493.38$11,476
May 20210363.483.02$9
Apr 20210360.362.76$8
Mar 20210361.302.72$8
Feb 20210357.805.55$17
Jan 20210350.412.81$8
Dec 20200344.642.68$8
Nov 20200338.772.71$8
Oct 20200336.972.48$7
Sep 20200337.091.99$6
Aug 20200339.982.39$7
Jul 2020169338.371.83$6,490
Jun 20200334.901.69$5
May 20200316.921.81$5
Apr 20200314.751.80$5
Mar 20200330.341.86$6
Feb 20200349.881.98$6
Jan 20200357.252.09$6
Dec 20190359.012.30$7
Nov 20190355.302.75$8
Oct 20190353.472.42$7
Sep 20190355.052.66$8
Aug 20190353.112.30$7
Jul 20190356.272.46$7
Jun 20190352.782.49$7
May 20190358.482.74$8
Apr 2019170362.632.75$10,655
Mar 20190356.803.06$9
Feb 20190350.852.79$8
Jan 20190346.033.23$10
Dec 20180346.594.19$13
Nov 20180352.934.24$13
Oct 20180361.443.40$10
Sep 20180359.543.11$9
Aug 20180359.403.07$9
Jul 20180365.142.93$9
Jun 20180360.183.08$9
May 20180365.382.90$9
Apr 20180363.842.90$9
Mar 20180361.222.79$8
Feb 2018167361.782.77$10,326
Jan 20180362.874.01$12
Dec 20170357.272.92$9
Nov 20170355.423.12$9
Oct 20170349.292.98$9
Sep 20170347.523.09$9
Aug 20170345.373.00$9
Jul 2017165343.873.09$7,248
Jun 20170342.493.09$9
May 20170345.373.26$10
Apr 20170347.933.21$10
Mar 20170346.772.98$9
Feb 2017168350.452.95$8,484
Jan 20170349.413.42$10
Dec 20160348.763.72$11
Nov 20160342.492.64$8
Oct 20160346.193.09$9
Sep 2016168341.553.10$6,990
Aug 20160341.442.92$9
Jul 20160341.622.92$9
Jun 20160345.352.69$8
May 2016167342.521.99$7,107
Apr 20160336.561.99$6
Mar 20160333.011.79$5
Feb 20160326.472.06$6
Jan 20160327.352.36$7
Dec 2015165332.362.00$5,345
Nov 20150338.792.17$7
Oct 20150343.552.43$7
Sep 20150342.992.76$8
Aug 20150340.162.87$9
Jul 20150348.152.95$9
Jun 20150356.152.88$9
May 20150355.212.96$9
Apr 20150349.822.71$8
Mar 20150342.892.93$9
Feb 2015166344.662.98$7,422
Jan 20150343.433.10$9
Dec 20140354.693.59$11
Nov 20140370.464.25$13
Oct 20140378.303.90$12
Sep 20140386.164.05$12
Aug 20140389.394.04$12
Jul 20140396.564.18$13
Jun 2014166398.164.74$16,309
May 20140394.734.73$14
Apr 20140395.944.81$14
Mar 20140395.895.06$15
Feb 20140397.406.19$19
Jan 20140390.404.86$15
Dec 2013164391.824.35$15,072
Nov 20130388.853.74$11
Oct 20130397.423.78$11
Sep 201303104.113.72$11
Aug 201303104.253.52$11
Jul 201303102.523.72$11
Jun 20130394.403.93$12
May 20130394.834.15$12
Apr 2013170393.964.28$15,986
Mar 20130393.623.91$12
Feb 20130391.233.42$10
Jan 20130391.603.42$10
Dec 20120386.773.42$10
Nov 20120386.953.62$11
Oct 20120389.383.40$10
Sep 20120394.672.92$9
Aug 20120392.662.91$9
Jul 2012170385.133.02$14,481
Jun 20120379.822.52$8
May 20120391.612.49$7
Apr 201203101.652.00$6
Mar 201203105.052.22$7
Feb 201203101.102.57$8
Jan 20120398.092.73$8
Dec 20110396.873.24$10
Nov 20110395.723.31$10
Oct 20110384.983.65$11
Sep 20110383.623.99$12
Aug 2011174383.404.15$14,524
Jul 20110394.144.52$14
Jun 20110392.904.64$14
May 20110398.134.40$13
Apr 201103105.964.33$13
Mar 20110396.364.06$12
Feb 20110385.644.18$13
Jan 2011167386.504.59$14,459
Dec 20100385.734.35$13
Nov 20100380.843.80$11
Oct 20100178.103.51$4
Sep 20100372.633.98$12
Aug 20100373.684.42$13
Jul 20100372.554.74$14
Jun 20100370.364.91$15
May 20100371.124.24$13
Apr 20100381.694.12$12
Mar 20100378.394.39$13
Feb 20100373.585.44$16
Jan 2010175374.365.96$13,031
Dec 20090371.445.48$16
Nov 20090374.593.75$11
Oct 20090372.544.11$12
Sep 20090365.543.06$9
Aug 20090367.423.22$10
Jul 20090361.133.46$10
Jun 2009158366.163.90$10,465
May 20090354.743.93$12
Apr 20090346.773.59$11
Mar 20090342.144.06$12
Feb 20090332.814.63$14
Jan 20090335.865.37$16
Dec 20080337.105.98$18
Nov 20080355.496.86$21
Oct 20080375.246.92$21
Sep 20081773101.767.88$18,035
Aug 200803114.228.48$25
Jul 200803131.0811.39$34
Jun 200803131.3313.03$39
May 200803123.1711.57$35
Apr 200803110.3110.45$31
Mar 200803101.909.66$29
Feb 20080392.538.77$26
Jan 20080390.388.21$25
Dec 20070388.337.30$22
Nov 20070391.677.29$22
Oct 20070382.856.92$21
Sep 20070375.846.24$19
Aug 20070369.066.39$19
Jul 20070370.906.39$19
Jun 2007127362.007.55$7,897
May 20070358.747.85$24
Apr 20070359.617.81$23
Mar 20070356.927.30$22
Feb 20070355.108.22$25
Jan 20070350.306.73$20
Dec 20060356.656.92$21
Nov 200694354.207.62$5,118
Oct 20060354.906.01$18
Sep 20060360.085.04$15
Aug 20060368.717.34$22
Jul 2006126369.376.34$8,760
Jun 20060366.286.38$19
May 20060366.016.42$19
Apr 20060364.397.36$22
Mar 2006151356.707.08$8,583
Feb 20060357.597.75$23
Jan 20060360.598.93$27
Dec 20050354.9413.42$40
Nov 200584354.6910.59$4,626
Oct 20050358.3413.80$41
Sep 20050361.4512.08$36
Aug 20050361.519.80$29
Jul 20050355.697.84$24
Jun 20050352.337.38$22
May 2005126345.226.65$5,718
Apr 20050349.207.36$22
Mar 20050350.377.15$21
Feb 20050345.226.31$19
Jan 2005118343.166.32$5,112
Dec 20040339.866.75$20
Nov 20040345.286.33$19
Oct 20040349.706.52$20
Sep 2004128343.245.28$5,551
Aug 20040342.375.55$17
Jul 20040338.286.08$18
Jun 2004123336.106.43$4,460
May 20040337.486.49$19
Apr 2004176334.475.86$6,084
Mar 20040334.365.53$17
Feb 20040332.455.51$17
Jan 20040332.036.30$19
Dec 2003120330.266.30$3,650
Nov 20030328.804.60$14
Oct 20030328.174.76$14
Sep 2003178326.314.75$4,697
Aug 20030329.765.13$15
Jul 20030329.415.17$16
Jun 2003177328.565.98$5,073
May 20030326.595.97$18
Apr 20030326.675.41$16
Mar 2003126331.146.10$3,942
Feb 20030333.487.93$24
Jan 20030330.315.58$17
Dec 20020326.914.85$15
Nov 20020324.664.14$12
Oct 2002183326.464.23$4,855
Sep 20020327.443.64$11
Aug 20020325.963.16$9
Jul 20020324.583.06$9
Jun 2002114323.733.34$2,715
May 20020324.663.58$11
Apr 2002184323.653.51$4,362
Mar 20020322.003.10$9
Feb 20020318.222.38$7
Jan 20020317.172.38$7
Dec 2001188316.932.36$3,190
Nov 20010318.072.41$7
Oct 20010319.782.53$8
Sep 20010324.262.25$7
Aug 2001183324.873.05$4,560
Jul 20010323.933.20$10
Jun 20010324.563.82$11
May 20010325.524.31$13
Apr 2001181324.685.34$4,483
Mar 20010324.545.38$16
Feb 20010327.755.77$17
Jan 2001187327.478.40$5,162
Dec 20000326.889.12$27
Nov 20000332.215.66$17
Oct 20000331.235.15$15
Sep 2000173331.875.19$5,529
Aug 20000329.644.54$14
Jul 2000182328.534.09$5,205
Jun 2000178329.304.40$5,229
May 20000327.263.68$11
Apr 20000324.513.12$9
Mar 2000130328.422.86$3,703
Feb 20000327.622.73$8
Jan 20000325.272.48$7
Dec 19990324.282.42$7
Nov 1999172323.192.43$3,996
Oct 19990320.982.80$8
Sep 19990321.752.62$8
Aug 19990319.262.88$9
Jul 19990317.892.37$7
Jun 19990315.942.36$7
May 19990315.792.32$7
Apr 1999121315.102.21$1,834
Mar 19990312.471.84$6
Feb 1999039.981.82$5
Jan 1999124310.381.90$1,293
Dec 1998039.201.77$5
Nov 19980310.892.19$7
Oct 1998127312.421.97$1,583
Sep 19980312.592.08$6
Aug 19980311.301.91$6
Jul 19980311.742.24$7
Jun 19980311.242.24$7
May 19980312.622.21$7
Apr 19980313.042.51$8
Mar 19980312.802.31$7
Feb 19980313.952.30$7
Jan 199810314.702.15$153
Dec 1997128316.322.41$2,096
Nov 19970318.193.09$9
Oct 19970319.253.15$9
Sep 19970317.742.95$9
Aug 19970317.862.55$8
Jul 19970317.582.25$7
Jun 19970317.242.26$7
May 19970518.972.31$12
Apr 19970517.882.08$10
Mar 1997121218.951.94$2,297
Feb 19970320.492.21$7
Jan 19970223.483.54$7
Dec 19960323.32$0
Nov 19960321.97$0
Oct 19960323.31$0
Sep 1996117322.22$2,600
Aug 19960320.26$0
Jul 19960319.55$0
Jun 19960318.73$0
May 19960319.43$0
Apr 19960321.51$0
Mar 19960319.38$0
Feb 1996114316.98$1,936
Jan 19960317.07$0
Dec 19950317.19$0
Nov 19952316.00$32
Oct 19950315.43$0
Sep 19950316.18$0
Aug 19950315.92$0
Jul 19950315.24$0
Jun 19950316.41$0
May 19950317.56$0
Apr 19950317.73$0
Mar 19950316.44$0
Feb 1995129316.58$2,139
Jan 19950315.92$0
Dec 19940315.03$0
Nov 19940315.90$0
Oct 19940315.58$0
Sep 19940315.29$0
Aug 1994129316.13$2,081
Jul 19940317.56$0
Jun 19940317.09$0
May 19940315.88$0
Apr 19940314.14$0
Mar 19940312.46$0
Feb 19940312.50$0
Jan 19940312.66$0
Dec 19930312.33$0
Nov 19930314.49$0
Oct 1993125315.85$1,981
Sep 19930315.03$0
Aug 19930315.66$0
Jul 19930315.46$0
Jun 19930316.79$0
May 19930317.68$0
Apr 19930318.05$0
Mar 1993129318.14$2,340
Feb 19930317.90$0
Jan 19930316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2024 — as filed, then multipliedworked
Oil                    0 bbl  × $ 69.61 =         $0
Casinghead gas         3 Mcf  × $  2.36 =         $7

────────────────────────────────────────────────────
Month total                                       $7

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/6963 is the state's own key, not one this site invented.