UNIVERSITY-MACARTHUR

Operated by WTG EXPLORATION (P-5 945220) in the HOWARD DRAW (SHALLOW) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 106144District 7CField 42954666Hydrogen sulphide fieldGasSaveExport
Value, all time
$49 k
Jan 1993 – Jul 2022
Value, last 12 filed months
$0
at the published price for each month
Months reported
355
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 13 leases and 25 wells, and the rule below applies to all of them.

Discovered
1950-12-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 10/01/92.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction27,439 Mcf$49,221
Total$49,221

12,112 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7560, -101.4652. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.75602, -101.46520 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
1,392 ft
1 wells filed one
Completion to plug
39.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 1,392 ft.

Completions filed
Nov 1982
1 of 1 wells
Plug dates filed
Jul 2022
1 of 1 wells

Last completion to plug: a median of 39.7 years across the 1 well that filed both dates, with the middle half between 39.7 years and 39.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1053321631,392 ftNov 1982Jul 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (355)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

355 months

Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 20202114.751.80$38
Mar 2020330.341.86$6
Feb 20203549.881.98$69
Jan 20205357.252.09$111
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 20193055.052.66$80
Aug 2019353.112.30$7
Jul 2019356.272.46$7
Jun 2019952.782.49$22
May 2019958.482.74$25
Apr 201941762.632.75$1,147
Mar 20191256.803.06$37
Feb 2019050.852.79$0
Jan 20195646.033.23$181
Dec 20185046.594.19$209
Nov 20189652.934.24$407
Oct 20187161.443.40$241
Sep 2018059.543.11$0
Aug 20181659.403.07$49
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 20181161.782.77$30
Jan 20181662.874.01$64
Dec 20172857.272.92$82
Nov 20172455.423.12$75
Oct 201719849.292.98$591
Sep 20173947.523.09$120
Aug 20176645.373.00$198
Jul 20176943.873.09$213
Jun 20171942.493.09$59
May 20171845.373.26$59
Apr 20172347.933.21$74
Mar 20172746.772.98$81
Feb 2017850.452.95$24
Jan 2017049.413.42$0
Dec 2016148.763.72$4
Nov 20165042.492.64$132
Oct 20168746.193.09$269
Sep 20167541.553.10$233
Aug 20169841.442.92$287
Jul 20169641.622.92$281
Jun 20168445.352.69$226
May 20161542.521.99$30
Apr 20162536.561.99$50
Mar 2016233.011.79$4
Feb 20161126.472.06$23
Jan 2016527.352.36$12
Dec 20154032.362.00$80
Nov 20156338.792.17$137
Oct 201510743.552.43$260
Sep 2015342.992.76$8
Aug 2015240.162.87$6
Jul 2015248.152.95$6
Jun 2015156.152.88$3
May 2015355.212.96$9
Apr 20158549.822.71$230
Mar 20151542.892.93$44
Feb 20154744.662.98$140
Jan 2015043.433.10$0
Dec 20149654.693.59$345
Nov 20145470.464.25$230
Oct 20147378.303.90$285
Sep 20149286.164.05$372
Aug 201415789.394.04$634
Jul 201412396.564.18$514
Jun 20148598.164.74$403
May 20146794.734.73$317
Apr 2014495.944.81$19
Mar 2014895.895.06$40
Feb 2014597.406.19$31
Jan 201411690.404.86$564
Dec 201317091.824.35$740
Nov 20132988.853.74$108
Oct 20137197.423.78$268
Sep 201335104.113.72$130
Aug 20131104.253.52$4
Jul 20131102.523.72$4
Jun 2013194.403.93$4
May 2013394.834.15$12
Apr 20132093.964.28$86
Mar 20131593.623.91$59
Feb 2013391.233.42$10
Jan 2013291.603.42$7
Dec 2012386.773.42$10
Nov 2012386.953.62$11
Oct 20125789.383.40$194
Sep 20122694.672.92$76
Aug 20124192.662.91$119
Jul 20122585.133.02$76
Jun 2012279.822.52$5
May 2012391.612.49$7
Apr 20124101.652.00$8
Mar 201228105.052.22$62
Feb 201210101.102.57$26
Jan 20123798.092.73$101
Dec 2011996.873.24$29
Nov 2011495.723.31$13
Oct 20115184.983.65$186
Sep 2011383.623.99$12
Aug 20117383.404.15$303
Jul 2011394.144.52$14
Jun 2011392.904.64$14
May 2011498.134.40$18
Apr 20114105.964.33$17
Mar 2011496.364.06$16
Feb 2011485.644.18$17
Jan 20115986.504.59$271
Dec 20109985.734.35$430
Nov 2010780.843.80$27
Oct 2010878.103.51$28
Sep 201035072.633.98$1,393
Aug 2010973.684.42$40
Jul 2010772.554.74$33
Jun 2010770.364.91$34
May 2010771.124.24$30
Apr 2010781.694.12$29
Mar 2010778.394.39$31
Feb 2010773.585.44$38
Jan 2010774.365.96$42
Dec 2009771.445.48$38
Nov 2009974.593.75$34
Oct 2009772.544.11$29
Sep 2009765.543.06$21
Aug 20092067.423.22$64
Jul 2009661.133.46$21
Jun 2009566.163.90$19
May 2009554.743.93$20
Apr 2009146.773.59$4
Mar 2009542.144.06$20
Feb 2009332.814.63$14
Jan 2009735.865.37$38
Dec 2008037.105.98$0
Nov 20086055.496.86$412
Oct 2008075.246.92$0
Sep 20084101.767.88$32
Aug 20085114.228.48$42
Jul 20082131.0811.39$23
Jun 20084131.3313.03$52
May 20084123.1711.57$46
Apr 20087110.3110.45$73
Mar 20087101.909.66$68
Feb 2008792.538.77$61
Jan 2008790.388.21$57
Dec 2007788.337.30$51
Nov 2007791.677.29$51
Oct 2007782.856.92$48
Sep 2007775.846.24$44
Aug 2007769.066.39$45
Jul 2007770.906.39$45
Jun 2007762.007.55$53
May 2007758.747.85$55
Apr 2007759.617.81$55
Mar 2007756.927.30$51
Feb 2007755.108.22$58
Jan 2007550.306.73$34
Dec 2006556.656.92$35
Nov 2006554.207.62$38
Oct 20064654.906.01$277
Sep 2006460.085.04$20
Aug 2006068.717.34$0
Jul 2006769.376.34$44
Jun 2006766.286.38$45
May 2006766.016.42$45
Apr 2006764.397.36$52
Mar 2006756.707.08$50
Feb 2006757.597.75$54
Jan 2006760.598.93$63
Dec 2005754.9413.42$94
Nov 2005754.6910.59$74
Oct 2005758.3413.80$97
Sep 2005761.4512.08$85
Aug 2005761.519.80$69
Jul 2005755.697.84$55
Jun 2005752.337.38$52
May 2005745.226.65$47
Apr 2005749.207.36$52
Mar 2005750.377.15$50
Feb 2005745.226.31$44
Jan 2005743.166.32$44
Dec 2004739.866.75$47
Nov 2004745.286.33$44
Oct 2004749.706.52$46
Sep 2004743.245.28$37
Aug 2004742.375.55$39
Jul 2004738.286.08$43
Jun 2004736.106.43$45
May 2004337.486.49$19
Apr 2004734.475.86$41
Mar 2004734.365.53$39
Feb 2004132.455.51$6
Jan 2004732.036.30$44
Dec 2003730.266.30$44
Nov 2003728.804.60$32
Oct 2003728.174.76$33
Sep 2003026.314.75$0
Aug 2003429.765.13$21
Jul 2003429.415.17$21
Jun 2003128.565.98$6
May 2003726.595.97$42
Apr 20032026.675.41$108
Mar 2003931.146.10$55
Feb 2003333.487.93$24
Jan 2003730.315.58$39
Dec 2002426.914.85$19
Nov 20022024.664.14$83
Oct 2002726.464.23$30
Sep 2002427.443.64$15
Aug 2002725.963.16$22
Jul 2002724.583.06$21
Jun 2002323.733.34$10
May 2002124.663.58$4
Apr 2002723.653.51$25
Mar 2002522.003.10$16
Feb 2002118.222.38$2
Jan 20021317.172.38$31
Dec 20011516.932.36$35
Nov 2001318.072.41$7
Oct 2001319.782.53$8
Sep 2001324.262.25$7
Aug 2001324.873.05$9
Jul 2001323.933.20$10
Jun 20012524.563.82$96
May 2001725.524.31$30
Apr 2001424.685.34$21
Mar 20014724.545.38$253
Feb 20014227.755.77$242
Jan 20019327.478.40$781
Dec 200013726.889.12$1,250
Nov 200021332.215.66$1,205
Oct 200021531.235.15$1,106
Sep 200019331.875.19$1,001
Aug 200025029.644.54$1,135
Jul 200027328.534.09$1,117
Jun 20002629.304.40$114
May 200016227.263.68$596
Apr 200017924.513.12$558
Mar 200018628.422.86$532
Feb 200011927.622.73$324
Jan 200023725.272.48$588
Dec 199918624.282.42$451
Nov 199914823.192.43$360
Oct 199925420.982.80$712
Sep 199923321.752.62$610
Aug 199915419.262.88$443
Jul 19992617.892.37$62
Jun 19995115.942.36$120
May 199912315.792.32$285
Apr 199921515.102.21$475
Mar 1999312.471.84$6
Feb 19992729.981.82$494
Jan 199930910.381.90$587
Dec 19982899.201.77$512
Nov 199825510.892.19$557
Oct 199829312.421.97$577
Sep 199824312.592.08$506
Aug 199812911.301.91$246
Jul 199821311.742.24$477
Jun 199822611.242.24$506
May 199821912.622.21$483
Apr 199823513.042.51$589
Mar 199823312.802.31$538
Feb 199822313.952.30$513
Jan 199825014.702.15$539
Dec 199723516.322.41$567
Nov 199724018.193.09$741
Oct 199726919.253.15$847
Sep 199723017.742.95$680
Aug 199721917.862.55$559
Jul 199726117.582.25$586
Jun 199717817.242.26$402
May 199721918.972.31$506
Apr 199725817.882.08$537
Mar 199724118.951.94$467
Feb 199719320.492.21$426
Jan 199731123.483.54$1,101
Dec 199627323.32$0
Nov 199622221.97$0
Oct 199619823.31$0
Sep 199619422.22$0
Aug 199619120.26$0
Jul 199618119.55$0
Jun 199613918.73$0
May 199618319.43$0
Apr 199619721.51$0
Mar 199620619.38$0
Feb 199621816.98$0
Jan 199627217.07$0
Dec 199526417.19$0
Nov 199523716.00$0
Oct 199521415.43$0
Sep 199521516.18$0
Aug 199527015.92$0
Jul 199520815.24$0
Jun 199523016.41$0
May 199523517.56$0
Apr 199524317.73$0
Mar 199525816.44$0
Feb 199525016.58$0
Jan 199537015.92$0
Dec 199434315.03$0
Nov 199433015.90$0
Oct 199414015.58$0
Sep 199429815.29$0
Aug 199415116.13$0
Jul 199429417.56$0
Jun 199428517.09$0
May 199428515.88$0
Apr 199421514.14$0
Mar 199425112.46$0
Feb 199427712.50$0
Jan 199433512.66$0
Dec 199336512.33$0
Nov 199332114.49$0
Oct 199332415.85$0
Sep 199330515.03$0
Aug 199324715.66$0
Jul 199323515.46$0
Jun 199334916.79$0
May 199324217.68$0
Apr 199339918.05$0
Mar 199339718.14$0
Feb 199325617.90$0
Jan 1993016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2020 — as filed, then multipliedworked
Gas                   21 Mcf  × $  1.80 =        $38

────────────────────────────────────────────────────
Month total                                      $38

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/106144 is the state's own key, not one this site invented.