S.P.G.C. "9"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 111079District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$308 k
Jan 1993 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition562 bbl$27,850
GasProduction76,742 Mcf$280,315
Total$308,165

14,397 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5652, -101.3269. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.56519, -101.32694 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,000 ft.

Completions filed
May 1984
1 of 1 wells

1 well

42-1053478427,000 ftMay 1984

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260215106.413.05$655
Apr 2026015498.932.87$442
Mar 2026014589.753.15$457
Feb 2026012563.503.75$469
Jan 2026015359.138.00$1,224
Dec 2025016756.664.41$737
Nov 2025015658.593.93$613
Oct 2025014259.383.30$469
Sep 202509962.743.08$305
Aug 2025012063.933.01$362
Jul 2025015466.743.32$511
Jun 2025015366.483.13$479
May 2025016060.553.23$517
Apr 2025014662.363.54$517
Mar 2025017267.704.27$734
Feb 2025014570.884.34$629
Jan 20250074.324.28$0
Dec 2024015568.993.12$484
Nov 2024017869.052.20$391
Oct 2024014771.372.28$335
Sep 202409469.612.36$222
Aug 2024015975.632.06$328
Jul 2024016579.932.15$354
Jun 2024017878.082.63$469
May 2024018978.812.20$416
Apr 2024014584.451.66$241
Mar 2024019380.301.55$298
Feb 2024017976.091.78$319
Jan 2024020973.023.30$689
Dec 202308471.262.61$219
Nov 2023016077.892.81$449
Oct 2023014385.443.09$441
Sep 2023016889.042.74$459
Aug 2023017380.522.67$462
Jul 2023016274.852.64$428
Jun 2023013168.962.26$296
May 2023014970.622.23$332
Apr 2023017778.122.24$396
Mar 2023016672.852.39$397
Feb 2023015875.112.47$390
Jan 2023016976.533.39$573
Dec 2022015876.415.73$905
Nov 2022034285.005.65$1,931
Oct 20220087.185.86$0
Sep 202203784.888.16$302
Aug 202207594.529.13$685
Jul 20220166101.587.54$1,252
Jun 20220157115.097.98$1,252
May 20220176109.378.43$1,484
Apr 20220134104.226.84$916
Mar 20220148108.885.08$751
Feb 2022014691.054.86$709
Jan 2022017581.844.54$794
Dec 2021020771.323.90$807
Nov 20210077.435.24$0
Oct 202108179.795.71$463
Sep 2021012269.865.35$653
Aug 202107366.024.22$308
Jul 2021012370.783.98$490
Jun 2021018269.493.38$615
May 2021012263.483.02$368
Apr 2021010460.362.76$287
Mar 202101661.302.72$43
Feb 2021012957.805.55$716
Jan 2021011950.412.81$334
Dec 2020012844.642.68$342
Nov 2020014238.772.71$384
Oct 20200936.972.48$22
Sep 2020012437.091.99$247
Aug 2020018139.982.39$432
Jul 2020016938.371.83$308
Jun 202008034.901.69$135
May 202003316.921.81$60
Apr 2020013914.751.80$251
Mar 2020013130.341.86$243
Feb 2020015049.881.98$297
Jan 2020013257.252.09$277
Dec 2019016359.012.30$376
Nov 2019015755.302.75$432
Oct 2019017353.472.42$418
Sep 2019014755.052.66$391
Aug 2019015353.112.30$353
Jul 2019017556.272.46$431
Jun 2019016352.782.49$406
May 2019019458.482.74$532
Apr 2019014962.632.75$410
Mar 2019016056.803.06$490
Feb 2019016950.852.79$472
Jan 2019019746.033.23$636
Dec 20180046.594.19$0
Nov 2018017352.934.24$733
Oct 2018017061.443.40$578
Sep 2018017759.543.11$550
Aug 2018019359.403.07$592
Jul 2018017565.142.93$513
Jun 2018021160.183.08$649
May 201801565.382.90$44
Apr 201801563.842.90$44
Mar 201801661.222.79$45
Feb 201801361.782.77$36
Jan 201801662.874.01$64
Dec 201701657.272.92$47
Nov 201701555.423.12$47
Oct 201701649.292.98$48
Sep 201701547.523.09$46
Aug 201701645.373.00$48
Jul 201701643.873.09$49
Jun 201701142.493.09$34
May 201701645.373.26$52
Apr 201701547.933.21$48
Mar 201701646.772.98$48
Feb 201701450.452.95$41
Jan 201701649.413.42$55
Dec 201601648.763.72$60
Nov 20160042.492.64$0
Oct 2016013146.193.09$405
Sep 2016013741.553.10$425
Aug 2016014741.442.92$430
Jul 2016114641.622.92$469
Jun 2016015045.352.69$403
May 2016014142.521.99$281
Apr 2016115336.561.99$341
Mar 2016016133.011.79$289
Feb 2016015826.472.06$326
Jan 2016315127.352.36$439
Dec 2015015832.362.00$316
Nov 2015014538.792.17$314
Oct 2015014543.552.43$352
Sep 2015116342.992.76$493
Aug 20150040.162.87$0
Jul 2015317148.152.95$648
Jun 2015015056.152.88$432
May 2015015855.212.96$467
Apr 2015017549.822.71$474
Mar 2015617442.892.93$768
Feb 2015015444.662.98$458
Jan 2015016443.433.10$509
Dec 2014012854.693.59$460
Nov 2014614070.464.25$1,018
Oct 2014014178.303.90$550
Sep 2014015486.164.05$623
Aug 2014014189.394.04$569
Jul 2014216296.564.18$870
Jun 2014018098.164.74$853
May 2014017494.734.73$822
Apr 20140095.944.81$0
Mar 2014012695.895.06$637
Feb 2014015697.406.19$966
Jan 2014014890.404.86$719
Dec 2013012491.824.35$540
Nov 2013018888.853.74$703
Oct 2013016997.423.78$639
Sep 20133180104.113.72$982
Aug 20130189104.253.52$666
Jul 20135182102.523.72$1,189
Jun 2013017294.403.93$677
May 2013017394.834.15$718
Apr 2013018193.964.28$775
Mar 2013016893.623.91$657
Feb 2013016591.233.42$564
Jan 2013017691.603.42$602
Dec 2012017686.773.42$602
Nov 2012017486.953.62$631
Oct 201212717789.383.40$11,953
Sep 2012017794.672.92$517
Aug 2012017992.662.91$521
Jul 2012018885.133.02$568
Jun 2012223479.822.52$749
May 2012024191.612.49$600
Apr 20120237101.652.00$473
Mar 20127252105.052.22$1,295
Feb 20120210101.102.57$540
Jan 2012017098.092.73$465
Dec 2011017396.873.24$560
Nov 2011222495.723.31$933
Oct 2011021384.983.65$777
Sep 2011018083.623.99$717
Aug 2011018483.404.15$763
Jul 2011019194.144.52$863
Jun 2011019192.904.64$886
May 2011020498.134.40$899
Apr 20110208105.964.33$901
Mar 2011315396.364.06$910
Feb 2011015585.644.18$648
Jan 2011021986.504.59$1,005
Dec 2010022385.734.35$970
Nov 2010021180.843.80$801
Oct 2010021578.103.51$754
Sep 2010421572.633.98$1,146
Aug 2010023173.684.42$1,021
Jul 2010020272.554.74$957
Jun 2010822870.364.91$1,682
May 2010021871.124.24$923
Apr 20101519481.694.12$2,025
Mar 20101520178.394.39$2,058
Feb 2010013173.585.44$713
Jan 2010016574.365.96$984
Dec 2009056871.445.48$3,115
Nov 2009018574.593.75$694
Oct 20091023672.544.11$1,695
Sep 2009026065.543.06$797
Aug 2009020067.423.22$644
Jul 2009929161.133.46$1,558
Jun 2009927766.163.90$1,674
May 2009015054.743.93$589
Apr 2009017746.773.59$635
Mar 2009626242.144.06$1,316
Feb 2009024432.814.63$1,130
Jan 2009628135.865.37$1,724
Dec 2008023137.105.98$1,381
Nov 2008026855.496.86$1,839
Oct 2008326675.246.92$2,067
Sep 20080286101.767.88$2,253
Aug 20083381114.228.48$3,575
Jul 20080402131.0811.39$4,579
Jun 20080158131.3313.03$2,059
May 20084192123.1711.57$2,715
Apr 20085421110.3110.45$4,953
Mar 20080479101.909.66$4,629
Feb 2008040692.538.77$3,561
Jan 2008038990.388.21$3,192
Dec 2007040088.337.30$2,921
Nov 2007043091.677.29$3,135
Oct 2007033982.856.92$2,347
Sep 2007042075.846.24$2,623
Aug 2007050069.066.39$3,194
Jul 2007037670.906.39$2,402
Jun 2007039362.007.55$2,967
May 2007238958.747.85$3,170
Apr 2007040159.617.81$3,130
Mar 2007435256.927.30$2,798
Feb 2007025855.108.22$2,120
Jan 2007037550.306.73$2,523
Dec 2006338056.656.92$2,799
Nov 2006032254.207.62$2,453
Oct 2006033854.906.01$2,033
Sep 2006021460.085.04$1,078
Aug 20060068.717.34$0
Jul 200627869.376.34$633
Jun 2006011666.286.38$741
May 2006012866.016.42$822
Apr 2006012264.397.36$898
Mar 2006012056.707.08$850
Feb 2006012757.597.75$984
Jan 2006018160.598.93$1,617
Dec 2005022154.9413.42$2,965
Nov 2005033154.6910.59$3,505
Oct 2005027758.3413.80$3,821
Sep 2005021961.4512.08$2,645
Aug 2005035261.519.80$3,448
Jul 2005068355.697.84$5,357
Jun 2005015452.337.38$1,137
May 2005012645.226.65$838
Apr 200503249.207.36$236
Mar 200514450.377.15$365
Feb 200504245.226.31$265
Jan 200507843.166.32$493
Dec 200409539.866.75$641
Nov 200408045.286.33$506
Oct 200406049.706.52$391
Sep 200407043.245.28$370
Aug 200406042.375.55$333
Jul 200404038.286.08$243
Jun 200436436.106.43$520
May 200409037.486.49$585
Apr 200406034.475.86$352
Mar 200405034.365.53$277
Feb 200405232.455.51$287
Jan 200407032.036.30$441
Dec 200305830.266.30$366
Nov 200308428.804.60$386
Oct 200304028.174.76$190
Sep 2003010026.314.75$475
Aug 200308029.765.13$410
Jul 200306829.415.17$352
Jun 200307228.565.98$431
May 200327626.595.97$507
Apr 200308226.675.41$443
Mar 2003313631.146.10$922
Feb 2003010233.487.93$808
Jan 200301,41330.315.58$7,887
Dec 2002018226.914.85$883
Nov 2002417724.664.14$831
Oct 2002014126.464.23$596
Sep 2002317127.443.64$704
Aug 2002020525.963.16$649
Jul 2002013424.583.06$410
Jun 2002215823.733.34$575
May 2002014124.663.58$505
Apr 2002014023.653.51$492
Mar 2002014122.003.10$437
Feb 2002014218.222.38$337
Jan 2002012317.172.38$292
Dec 2001616516.932.36$492
Nov 2001024518.072.41$589
Oct 2001015419.782.53$389
Sep 2001310424.262.25$307
Aug 2001015024.873.05$458
Jul 2001012923.933.20$412
Jun 200143224.563.82$221
May 200106625.524.31$284
Apr 2001210624.685.34$615
Mar 200108824.545.38$473
Feb 200149727.755.77$670
Jan 2001011627.478.40$974
Dec 2000325726.889.12$2,425
Nov 2000015632.215.66$883
Oct 2000012831.235.15$659
Sep 2000010631.875.19$550
Aug 200009529.644.54$431
Jul 2000017328.534.09$708
Jun 2000413029.304.40$689
May 2000016227.263.68$596
Apr 2000013424.513.12$418
Mar 2000012628.422.86$360
Feb 2000013027.622.73$354
Jan 2000013525.272.48$335
Dec 1999015424.282.42$373
Nov 1999029923.192.43$728
Oct 1999027820.982.80$779
Sep 1999026221.752.62$686
Aug 1999028319.262.88$814
Jul 1999028417.892.37$674
Jun 1999034615.942.36$817
May 1999025515.792.32$592
Apr 1999016815.102.21$371
Mar 1999020112.471.84$370
Feb 199902409.981.82$436
Jan 1999026710.381.90$507
Dec 199802669.201.77$472
Nov 1998023610.892.19$516
Oct 1998024712.421.97$486
Sep 1998013912.592.08$289
Aug 1998024311.301.91$463
Jul 1998023711.742.24$530
Jun 1998028911.242.24$647
May 1998029012.622.21$640
Apr 1998026013.042.51$651
Mar 1998026412.802.31$610
Feb 1998024813.952.30$570
Jan 1998025214.702.15$543
Dec 1997024616.322.41$593
Nov 1997026718.193.09$825
Oct 1997024919.253.15$784
Sep 199718230817.742.95$4,139
Aug 1997029617.862.55$756
Jul 1997033517.582.25$753
Jun 1997035717.242.26$806
May 1997035818.972.31$826
Apr 1997036817.882.08$766
Mar 1997027718.951.94$537
Feb 1997023920.492.21$527
Jan 1997045623.483.54$1,614
Dec 1996035323.32$0
Nov 1996045821.97$0
Oct 1996024723.31$0
Sep 1996030622.22$0
Aug 1996021420.26$0
Jul 1996029319.55$0
Jun 1996029018.73$0
May 1996014619.43$0
Apr 1996021921.51$0
Mar 1996026619.38$0
Feb 1996027216.98$0
Jan 1996223117.07$34
Dec 1995076617.19$0
Nov 1995028216.00$0
Oct 1995044015.43$0
Sep 1995045916.18$0
Aug 19950615.92$0
Jul 19950815.24$0
Jun 1995028716.41$0
May 1995022117.56$0
Apr 1995439817.73$71
Mar 1995036716.44$0
Feb 1995536916.58$83
Jan 1995042215.92$0
Dec 1994044715.03$0
Nov 1994044915.90$0
Oct 1994056815.58$0
Sep 1994027115.29$0
Aug 1994030216.13$0
Jul 1994026717.56$0
Jun 1994036617.09$0
May 1994032715.88$0
Apr 19944530514.14$636
Mar 1994026212.46$0
Feb 199409712.50$0
Jan 1994011512.66$0
Dec 1993012112.33$0
Nov 1993041814.49$0
Oct 1993033015.85$0
Sep 1993016615.03$0
Aug 1993026515.66$0
Jul 1993032515.46$0
Jun 1993025516.79$0
May 199308717.68$0
Apr 1993025718.05$0
Mar 1993024018.14$0
Feb 1993033617.90$0
Jan 1993050116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  215 Mcf  × $  3.05 =       $655

────────────────────────────────────────────────────
Month total                                     $655

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/111079 is the state's own key, not one this site invented.