PIERCE STATE "A"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 123973District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$372 k
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition169 bbl$2,757
GasProduction149,052 Mcf$369,290
Total$372,048

60,636 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4290, -101.3099. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42903, -101.30993 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,300 ft.

Completions filed
Apr 1987
1 of 1 wells

1 well

42-1053531496,300 ftApr 1987

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210170.783.98$4
Jun 20210169.493.38$3
May 20210363.483.02$9
Apr 202102860.362.76$77
Mar 202102261.302.72$60
Feb 20210757.805.55$39
Jan 20210350.412.81$8
Dec 202003144.642.68$83
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190555.052.66$13
Aug 20190853.112.30$18
Jul 20190056.272.46$0
Jun 201904652.782.49$115
May 201906258.482.74$170
Apr 201906762.632.75$184
Mar 201906856.803.06$208
Feb 201904150.852.79$114
Jan 201904346.033.23$139
Dec 2018027446.594.19$1,147
Nov 2018041752.934.24$1,767
Oct 2018048861.443.40$1,658
Sep 2018048159.543.11$1,495
Aug 2018052359.403.07$1,604
Jul 2018051465.142.93$1,507
Jun 2018052760.183.08$1,622
May 2018050965.382.90$1,477
Apr 2018029463.842.90$853
Mar 2018031661.222.79$881
Feb 2018030261.782.77$835
Jan 2018026962.874.01$1,079
Dec 2017027757.272.92$809
Nov 2017018255.423.12$568
Oct 2017017249.292.98$513
Sep 2017017747.523.09$546
Aug 2017014545.373.00$436
Jul 2017019243.873.09$593
Jun 2017015942.493.09$491
May 2017019845.373.26$646
Apr 2017021247.933.21$681
Mar 2017018646.772.98$555
Feb 2017022250.452.95$655
Jan 2017021149.413.42$721
Dec 2016018948.763.72$704
Nov 2016024242.492.64$640
Oct 2016027346.193.09$844
Sep 2016023941.553.10$741
Aug 2016024541.442.92$716
Jul 2016022741.622.92$664
Jun 2016023945.352.69$642
May 2016027942.521.99$556
Apr 2016026236.561.99$522
Mar 2016026633.011.79$477
Feb 2016022926.472.06$473
Jan 2016027327.352.36$645
Dec 2015027532.362.00$550
Nov 201508338.792.17$180
Oct 201501143.552.43$27
Sep 2015029542.992.76$814
Aug 2015030040.162.87$862
Jul 2015028948.152.95$851
Jun 2015011956.152.88$343
May 2015010255.212.96$301
Apr 201505749.822.71$154
Mar 201508342.892.93$244
Feb 2015011044.662.98$327
Jan 2015011543.433.10$357
Dec 2014017154.693.59$614
Nov 2014016870.464.25$714
Oct 2014021678.303.90$843
Sep 2014017786.164.05$716
Aug 2014017789.394.04$714
Jul 2014014696.564.18$610
Jun 2014023798.164.74$1,123
May 2014030194.734.73$1,423
Apr 2014023195.944.81$1,111
Mar 2014014495.895.06$728
Feb 2014011097.406.19$681
Jan 201409190.404.86$442
Dec 2013011091.824.35$479
Nov 2013013288.853.74$493
Oct 2013012097.423.78$454
Sep 2013080104.113.72$297
Aug 20130202104.253.52$712
Jul 20130135102.523.72$502
Jun 2013014494.403.93$566
May 2013011594.834.15$477
Apr 201309293.964.28$394
Mar 2013017293.623.91$673
Feb 2013011091.233.42$376
Jan 2013010391.603.42$352
Dec 2012010186.773.42$345
Nov 2012011286.953.62$406
Oct 201209689.383.40$326
Sep 2012011194.672.92$324
Aug 2012011592.662.91$334
Jul 2012013985.133.02$420
Jun 2012012179.822.52$305
May 2012010991.612.49$271
Apr 20120156101.652.00$312
Mar 2012097105.052.22$216
Feb 20120131101.102.57$337
Jan 2012024198.092.73$659
Dec 2011034896.873.24$1,127
Nov 2011029995.723.31$990
Oct 2011039484.983.65$1,438
Sep 2011040583.623.99$1,614
Aug 2011031383.404.15$1,299
Jul 2011020994.144.52$944
Jun 2011033692.904.64$1,559
May 2011023198.134.40$1,018
Apr 20110130105.964.33$563
Mar 2011012896.364.06$519
Feb 2011012585.644.18$523
Jan 2011010486.504.59$477
Dec 201009985.734.35$430
Nov 201007280.843.80$273
Oct 201008578.103.51$298
Sep 2010010272.633.98$406
Aug 201005073.684.42$221
Jul 2010018972.554.74$895
Jun 2010011770.364.91$575
May 201004071.124.24$169
Apr 2010010081.694.12$412
Mar 201006278.394.39$272
Feb 201008373.585.44$452
Jan 2010012774.365.96$757
Dec 2009013071.445.48$713
Nov 2009019574.593.75$732
Oct 2009019272.544.11$789
Sep 200908565.543.06$261
Aug 2009013667.423.22$438
Jul 2009020261.133.46$700
Jun 2009015366.163.90$596
May 2009013154.743.93$514
Apr 2009018346.773.59$657
Mar 2009021142.144.06$856
Feb 2009013932.814.63$644
Jan 2009026235.865.37$1,407
Dec 2008043037.105.98$2,570
Nov 2008016055.496.86$1,098
Oct 2008011075.246.92$761
Sep 20080115101.767.88$906
Aug 20080230114.228.48$1,951
Jul 20080164131.0811.39$1,868
Jun 2008097131.3313.03$1,264
May 20080177123.1711.57$2,049
Apr 20080114110.3110.45$1,192
Mar 20080116101.909.66$1,121
Feb 2008010492.538.77$912
Jan 2008017990.388.21$1,469
Dec 2007019388.337.30$1,409
Nov 2007013891.677.29$1,006
Oct 2007011382.856.92$782
Sep 2007019775.846.24$1,230
Aug 2007035869.066.39$2,287
Jul 2007014270.906.39$907
Jun 2007015762.007.55$1,185
May 2007023258.747.85$1,820
Apr 2007047559.617.81$3,707
Mar 2007013056.927.30$949
Feb 2007012855.108.22$1,052
Jan 2007013350.306.73$895
Dec 2006075656.656.92$5,230
Nov 2006021054.207.62$1,600
Oct 2006014254.906.01$854
Sep 2006018960.085.04$952
Aug 2006056668.717.34$4,154
Jul 2006019769.376.34$1,250
Jun 2006017166.286.38$1,092
May 2006013166.016.42$842
Apr 200609064.397.36$662
Mar 2006041256.707.08$2,918
Feb 2006056557.597.75$4,379
Jan 2006018660.598.93$1,662
Dec 2005010254.9413.42$1,368
Nov 2005059854.6910.59$6,332
Oct 2005013858.3413.80$1,904
Sep 2005016661.4512.08$2,005
Aug 2005018061.519.80$1,763
Jul 2005033855.697.84$2,651
Jun 2005050752.337.38$3,742
May 2005028945.226.65$1,922
Apr 2005029449.207.36$2,164
Mar 2005051050.377.15$3,649
Feb 2005041145.226.31$2,594
Jan 2005049643.166.32$3,136
Dec 2004044239.866.75$2,984
Nov 2004054645.286.33$3,456
Oct 2004040249.706.52$2,619
Sep 2004041243.245.28$2,177
Aug 2004056342.375.55$3,125
Jul 2004062938.286.08$3,827
Jun 2004029936.106.43$1,923
May 2004031637.486.49$2,052
Apr 2004020334.475.86$1,189
Mar 2004064334.365.53$3,556
Feb 2004033632.455.51$1,851
Jan 2004050232.036.30$3,162
Dec 2003070330.266.30$4,430
Nov 2003026628.804.60$1,222
Oct 2003035928.174.76$1,709
Sep 2003035326.314.75$1,677
Aug 2003041329.765.13$2,119
Jul 2003055929.415.17$2,891
Jun 2003037428.565.98$2,238
May 2003066926.595.97$3,996
Apr 2003021526.675.41$1,163
Mar 2003052631.146.10$3,207
Feb 2003018733.487.93$1,482
Jan 2003050730.315.58$2,830
Dec 2002064026.914.85$3,106
Nov 2002053224.664.14$2,201
Oct 2002065226.464.23$2,757
Sep 2002057727.443.64$2,098
Aug 2002053625.963.16$1,696
Jul 2002057724.583.06$1,767
Jun 2002070223.733.34$2,343
May 2002043424.663.58$1,555
Apr 2002061823.653.51$2,171
Mar 2002046322.003.10$1,437
Feb 2002081618.222.38$1,939
Jan 2002029117.172.38$691
Dec 2001080416.932.36$1,901
Nov 2001026818.072.41$645
Oct 2001067619.782.53$1,710
Sep 20011969124.262.25$2,017
Aug 2001058324.873.05$1,780
Jul 2001080423.933.20$2,570
Jun 2001041424.563.82$1,583
May 2001098125.524.31$4,225
Apr 2001035424.685.34$1,889
Mar 2001040124.545.38$2,156
Feb 2001094227.755.77$5,433
Jan 2001039427.478.40$3,309
Dec 2000037926.889.12$3,457
Nov 2000089732.215.66$5,075
Oct 2000033131.235.15$1,703
Sep 2000032731.875.19$1,696
Aug 2000056129.644.54$2,547
Jul 2000075528.534.09$3,088
Jun 2000062729.304.40$2,757
May 2000069027.263.68$2,539
Apr 2000083424.513.12$2,599
Mar 2000080128.422.86$2,291
Feb 2000076527.622.73$2,086
Jan 2000057925.272.48$1,436
Dec 1999036324.282.42$880
Nov 1999045423.192.43$1,105
Oct 1999070320.982.80$1,971
Sep 1999038921.752.62$1,019
Aug 1999060419.262.88$1,737
Jul 1999055317.892.37$1,312
Jun 1999074815.942.36$1,767
May 1999075815.792.32$1,759
Apr 1999028415.102.21$627
Mar 1999021112.471.84$388
Feb 199901769.981.82$320
Jan 1999056210.381.90$1,068
Dec 199803469.201.77$614
Nov 1998036410.892.19$796
Oct 1998046212.421.97$910
Sep 1998059512.592.08$1,239
Aug 1998098511.301.91$1,879
Jul 1998022911.742.24$512
Jun 1998034511.242.24$772
May 1998058312.622.21$1,286
Apr 199801,28013.042.51$3,207
Mar 19980912.802.31$21
Feb 1998030613.952.30$704
Jan 1998072314.702.15$1,558
Dec 1997081616.322.41$1,967
Nov 1997069518.193.09$2,146
Oct 1997079119.253.15$2,492
Sep 1997083917.742.95$2,479
Aug 1997080217.862.55$2,049
Jul 199701,28117.582.25$2,878
Jun 1997045017.242.26$1,016
May 199701,39118.972.31$3,211
Apr 199705817.882.08$121
Mar 1997037918.951.94$735
Feb 1997037320.492.21$823
Jan 1997048823.483.54$1,727
Dec 1996090523.32$0
Nov 199601,15421.97$0
Oct 199601,00523.31$0
Sep 199601,02022.22$0
Aug 1996093120.26$0
Jul 199601,00119.55$0
Jun 199601,22618.73$0
May 199601,44419.43$0
Apr 199601,46121.51$0
Mar 199601,06519.38$0
Feb 1996099916.98$0
Jan 199601,10517.07$0
Dec 199501,32017.19$0
Nov 199581,35616.00$128
Oct 19951121,46815.43$1,728
Sep 199501,55716.18$0
Aug 199501,68715.92$0
Jul 199501,20715.24$0
Jun 199501,47816.41$0
May 1995099917.56$0
Apr 199501,21717.73$0
Mar 199501,36116.44$0
Feb 199501,02816.58$0
Jan 199501,40115.92$0
Dec 199401,97415.03$0
Nov 199402,14715.90$0
Oct 199402,36315.58$0
Sep 199433,35415.29$46
Aug 199402,46916.13$0
Jul 1994182417.56$18
Jun 199401,42117.09$0
May 199401,23115.88$0
Apr 199401,26614.14$0
Mar 199401,91812.46$0
Feb 199401,34012.50$0
Jan 1994086812.66$0
Dec 199301,64612.33$0
Nov 19932679814.49$377
Oct 1993080715.85$0
Sep 1993094615.03$0
Aug 1993091115.66$0
Jul 1993095315.46$0
Jun 1993092016.79$0
May 1993090917.68$0
Apr 199301,02418.05$0
Mar 1993056618.14$0
Feb 1993045317.90$0
Jan 1993013316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2021 — as filed, then multipliedworked
Condensate             0 bbl  × $ 70.78 =         $0
Gas                    1 Mcf  × $  3.98 =         $4

────────────────────────────────────────────────────
Month total                                       $4

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/123973 is the state's own key, not one this site invented.