MONTGOMERY, C. C.

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 130347District 7CField 67995200NGPA filingGasSaveExport
Value, all time
$860 k
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction474,203 Mcf$860,497
Total$860,497

231,537 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4592, -101.3272. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.45915, -101.32724 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,400 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,400 ft.

Completions filed
Mar 1989
1 of 1 wells

1 well

42-1053558176D6,400 ftMar 1989

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
May 2014094.734.73$0
Apr 2014095.944.81$0
Mar 2014095.895.06$0
Feb 2014097.406.19$0
Jan 2014090.404.86$0
Dec 2013091.824.35$0
Nov 2013088.853.74$0
Oct 2013097.423.78$0
Sep 20130104.113.72$0
Aug 20130104.253.52$0
Jul 20130102.523.72$0
Jun 2013094.403.93$0
May 2013094.834.15$0
Apr 2013093.964.28$0
Mar 2013093.623.91$0
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 2012089.383.40$0
Sep 2012094.672.92$0
Aug 2012092.662.91$0
Jul 2012085.133.02$0
Jun 2012079.822.52$0
May 2012091.612.49$0
Apr 20120101.652.00$0
Mar 20120105.052.22$0
Feb 20120101.102.57$0
Jan 2012098.092.73$0
Dec 2011096.873.24$0
Nov 2011095.723.31$0
Oct 2011084.983.65$0
Sep 2011083.623.99$0
Aug 2011083.404.15$0
Jul 2011094.144.52$0
Jun 2011092.904.64$0
May 2011098.134.40$0
Apr 20110105.964.33$0
Mar 2011096.364.06$0
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 2009072.544.11$0
Sep 2009065.543.06$0
Aug 2009067.423.22$0
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 2009054.743.93$0
Apr 2009046.773.59$0
Mar 2009042.144.06$0
Feb 2009032.814.63$0
Jan 2009035.865.37$0
Dec 2008037.105.98$0
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 20080101.767.88$0
Aug 20080114.228.48$0
Jul 20080131.0811.39$0
Jun 20080131.3313.03$0
May 20080123.1711.57$0
Apr 20080110.3110.45$0
Mar 20080101.909.66$0
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 20072791.677.29$197
Oct 20072182.856.92$145
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 2007062.007.55$0
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 20062660.085.04$131
Aug 200622068.717.34$1,615
Jul 200648269.376.34$3,057
Jun 200643666.286.38$2,783
May 200642666.016.42$2,737
Apr 200630464.397.36$2,238
Mar 200627656.707.08$1,955
Feb 200618957.597.75$1,465
Jan 200624660.598.93$2,198
Dec 200590754.9413.42$12,168
Nov 200593654.6910.59$9,911
Oct 20051,14958.3413.80$15,851
Sep 20051,31961.4512.08$15,932
Aug 20051,55561.519.80$15,234
Jul 200588355.697.84$6,926
Jun 200559252.337.38$4,370
May 20051,08145.226.65$7,190
Apr 20051,12549.207.36$8,281
Mar 200550650.377.15$3,620
Feb 200581245.226.31$5,125
Jan 20051,30143.166.32$8,225
Dec 200496439.866.75$6,508
Nov 200470245.286.33$4,444
Oct 200486249.706.52$5,616
Sep 200494743.245.28$5,004
Aug 20041,18842.375.55$6,594
Jul 20041,07438.286.08$6,534
Jun 20041,00136.106.43$6,439
May 20041,25237.486.49$8,131
Apr 200488834.475.86$5,202
Mar 20041,11534.365.53$6,166
Feb 200487332.455.51$4,810
Jan 20041,35432.036.30$8,530
Dec 20031,28330.266.30$8,085
Nov 200365328.804.60$3,001
Oct 20031,11528.174.76$5,307
Sep 20031,21026.314.75$5,747
Aug 20031,64229.765.13$8,423
Jul 20031,45029.415.17$7,498
Jun 20031,63928.565.98$9,806
May 20031,16226.595.97$6,940
Apr 20031,45826.675.41$7,884
Mar 20031,43231.146.10$8,730
Feb 20031,68733.487.93$13,371
Jan 20031,94030.315.58$10,829
Dec 20021,50426.914.85$7,300
Nov 20022,20724.664.14$9,130
Oct 20022,76526.464.23$11,694
Sep 20021,10027.443.64$3,999
Aug 200290725.963.16$2,870
Jul 200259124.583.06$1,810
Jun 200290723.733.34$3,028
May 20021,00424.663.58$3,598
Apr 20021,11023.653.51$3,899
Mar 200288022.003.10$2,730
Feb 200288918.222.38$2,112
Jan 200294117.172.38$2,236
Dec 20011,25516.932.36$2,967
Nov 20011,07918.072.41$2,596
Oct 20011,89219.782.53$4,785
Sep 20011,22324.262.25$2,753
Aug 20011,25224.873.05$3,823
Jul 20011,23723.933.20$3,955
Jun 20011,78724.563.82$6,834
May 20011,10725.524.31$4,768
Apr 20011,47724.685.34$7,880
Mar 20011,89524.545.38$10,188
Feb 20011,60227.755.77$9,239
Jan 20011,28527.478.40$10,792
Dec 20001,47526.889.12$13,456
Nov 20001,94632.215.66$11,010
Oct 20001,52931.235.15$7,867
Sep 20002,26131.875.19$11,727
Aug 20001,94729.644.54$8,841
Jul 20001,75228.534.09$7,165
Jun 20001,75429.304.40$7,713
May 20002,09927.263.68$7,724
Apr 20002,46124.513.12$7,668
Mar 20002,47628.422.86$7,081
Feb 20002,09327.622.73$5,707
Jan 20002,31125.272.48$5,732
Dec 19992,31824.282.42$5,618
Nov 19991,76223.192.43$4,289
Oct 19993,15020.982.80$8,832
Sep 19992,99721.752.62$7,849
Aug 19992,35219.262.88$6,763
Jul 19992,51017.892.37$5,955
Jun 19992,70915.942.36$6,399
May 19993,13615.792.32$7,279
Apr 19992,47115.102.21$5,456
Mar 19993,30212.471.84$6,070
Feb 19993,0479.981.82$5,539
Jan 19993,27510.381.90$6,222
Dec 19982,7229.201.77$4,827
Nov 19982,70210.892.19$5,906
Oct 19983,80112.421.97$7,485
Sep 19983,85812.592.08$8,035
Aug 19984,13411.301.91$7,885
Jul 19984,31611.742.24$9,656
Jun 19984,21811.242.24$9,437
May 19984,50512.622.21$9,940
Apr 19984,60513.042.51$11,537
Mar 19984,64512.802.31$10,727
Feb 19982,97213.952.30$6,833
Jan 19983,87314.702.15$8,346
Dec 19975,00916.322.41$12,077
Nov 19974,91918.193.09$15,191
Oct 19973,76819.253.15$11,869
Sep 19973,66017.742.95$10,815
Aug 19973,42817.862.55$8,758
Jul 19975,50517.582.25$12,369
Jun 19976,17617.242.26$13,940
May 19976,80718.972.31$15,714
Apr 19977,66117.882.08$15,956
Mar 19978,67218.951.94$16,816
Feb 19974,30020.492.21$9,485
Jan 19973,67123.483.54$12,994
Dec 19964,94123.32$0
Nov 19964,78421.97$0
Oct 19963,73323.31$0
Sep 19963,32322.22$0
Aug 19965,03420.26$0
Jul 19964,71519.55$0
Jun 19965,18318.73$0
May 19963,00119.43$0
Apr 19963,83921.51$0
Mar 19962,90719.38$0
Feb 19961,88216.98$0
Jan 19962,27417.07$0
Dec 19951,89417.19$0
Nov 19952,03916.00$0
Oct 19952,27615.43$0
Sep 19952,03216.18$0
Aug 19953,28015.92$0
Jul 19952,99815.24$0
Jun 19952,65716.41$0
May 19953,81817.56$0
Apr 19954,42817.73$0
Mar 19953,03116.44$0
Feb 19955,44316.58$0
Jan 19954,39715.92$0
Dec 19947,30515.03$0
Nov 19945,18315.90$0
Oct 19946,81015.58$0
Sep 19943,76715.29$0
Aug 19944,00416.13$0
Jul 19946,27317.56$0
Jun 19944,90017.09$0
May 19945,57915.88$0
Apr 19946,11614.14$0
Mar 19946,75612.46$0
Feb 19945,43812.50$0
Jan 19945,16612.66$0
Dec 19935,54012.33$0
Nov 19934,10314.49$0
Oct 19936,02615.85$0
Sep 19936,36115.03$0
Aug 19937,44815.66$0
Jul 19937,33515.46$0
Jun 19936,89016.79$0
May 19939,73917.68$0
Apr 19937,83118.05$0
Mar 19936,15418.14$0
Feb 19935,93317.90$0
Jan 19936,97116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2007 — as filed, then multipliedworked
Gas                   27 Mcf  × $  7.29 =       $197

────────────────────────────────────────────────────
Month total                                     $197

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/130347 is the state's own key, not one this site invented.