ROBERTSON "19A"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 130880District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$687 k
Jan 1993 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition48 bbl$3,328
GasProduction206,489 Mcf$684,147
Total$687,475

47,124 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5209, -101.3692. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52091, -101.36921 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,875 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,875 ft.

Completions filed
May 1989
1 of 1 wells

1 well

42-1053561046,875 ftMay 1989

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20262348106.413.05$1,273
Apr 2026431498.932.87$1,297
Mar 20262089.753.15$180
Feb 2026627363.503.75$1,405
Jan 2026228859.138.00$2,422
Dec 2025327856.664.41$1,397
Nov 2025215258.593.93$714
Oct 2025226859.383.30$1,004
Sep 2025129162.743.08$958
Aug 2025332763.933.01$1,178
Jul 2025231766.743.32$1,184
Jun 2025228966.483.13$1,037
May 2025428960.553.23$1,176
Apr 2025434562.363.54$1,472
Mar 2025539167.704.27$2,007
Feb 2025428270.884.34$1,508
Jan 20250074.324.28$0
Dec 2024023668.993.12$737
Nov 2024035769.052.20$785
Oct 2024038171.372.28$869
Sep 2024029769.612.36$702
Aug 2024020975.632.06$431
Jul 2024036279.932.15$777
Jun 2024028278.082.63$743
May 2024028678.812.20$629
Apr 2024037084.451.66$614
Mar 2024034780.301.55$536
Feb 2024028476.091.78$507
Jan 2024038473.023.30$1,266
Dec 2023029771.262.61$775
Nov 2023010277.892.81$286
Oct 2023052085.443.09$1,605
Sep 202308389.042.74$227
Aug 202301680.522.67$43
Jul 2023040974.852.64$1,081
Jun 2023031068.962.26$700
May 2023025170.622.23$559
Apr 2023020778.122.24$463
Mar 2023042772.852.39$1,022
Feb 2023042675.112.47$1,050
Jan 2023055676.533.39$1,884
Dec 2022062176.415.73$3,558
Nov 20220185.005.65$6
Oct 20220787.185.86$41
Sep 2022015584.888.16$1,265
Aug 2022024894.529.13$2,264
Jul 20220327101.587.54$2,466
Jun 20220466115.097.98$3,717
May 20220597109.378.43$5,035
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 2021031079.795.71$1,771
Sep 2021033569.865.35$1,793
Aug 2021035766.024.22$1,507
Jul 2021035370.783.98$1,406
Jun 2021037369.493.38$1,261
May 2021028663.483.02$863
Apr 2021037360.362.76$1,029
Mar 2021049061.302.72$1,331
Feb 2021010757.805.55$594
Jan 20210350.412.81$8
Dec 2020022844.642.68$610
Nov 2020024538.772.71$663
Oct 2020026036.972.48$644
Sep 2020022237.091.99$442
Aug 2020024439.982.39$582
Jul 2020024838.371.83$453
Jun 2020024834.901.69$419
May 2020026116.921.81$474
Apr 2020029014.751.80$523
Mar 2020029530.341.86$548
Feb 2020028449.881.98$563
Jan 2020030657.252.09$641
Dec 2019031259.012.30$719
Nov 2019030555.302.75$839
Oct 2019031053.472.42$750
Sep 2019026955.052.66$715
Aug 2019026653.112.30$613
Jul 2019029056.272.46$713
Jun 2019022352.782.49$556
May 2019031358.482.74$858
Apr 2019031562.632.75$866
Mar 2019033956.803.06$1,038
Feb 2019035850.852.79$1,000
Jan 2019018946.033.23$610
Dec 2018015946.594.19$665
Nov 2018021152.934.24$894
Oct 2018030661.443.40$1,040
Sep 2018044059.543.11$1,368
Aug 2018011059.403.07$337
Jul 2018030265.142.93$885
Jun 2018023360.183.08$717
May 2018029565.382.90$856
Apr 2018027863.842.90$806
Mar 2018030261.222.79$842
Feb 2018025461.782.77$703
Jan 2018029062.874.01$1,163
Dec 2017026757.272.92$780
Nov 2017030655.423.12$954
Oct 2017034549.292.98$1,029
Sep 2017034747.523.09$1,071
Aug 2017029245.373.00$877
Jul 2017038943.873.09$1,201
Jun 2017027442.493.09$846
May 2017034945.373.26$1,139
Apr 2017036747.933.21$1,179
Mar 2017034246.772.98$1,020
Feb 2017033750.452.95$995
Jan 2017041949.413.42$1,432
Dec 2016035948.763.72$1,337
Nov 201606942.492.64$182
Oct 2016036846.193.09$1,137
Sep 2016034841.553.10$1,079
Aug 2016036341.442.92$1,062
Jul 2016036341.622.92$1,062
Jun 2016036745.352.69$986
May 2016043042.521.99$856
Apr 2016012836.561.99$255
Mar 2016036033.011.79$646
Feb 2016033526.472.06$691
Jan 2016036027.352.36$851
Dec 2015036832.362.00$737
Nov 2015035338.792.17$765
Oct 2015037743.552.43$915
Sep 2015038942.992.76$1,073
Aug 2015031740.162.87$911
Jul 2015038448.152.95$1,131
Jun 2015037356.152.88$1,075
May 2015038255.212.96$1,129
Apr 2015037149.822.71$1,004
Mar 2015038642.892.93$1,133
Feb 2015035044.662.98$1,042
Jan 2015038943.433.10$1,206
Dec 2014038754.693.59$1,390
Nov 2014038070.464.25$1,616
Oct 2014036778.303.90$1,432
Sep 2014035586.164.05$1,436
Aug 2014036789.394.04$1,481
Jul 2014034296.564.18$1,429
Jun 2014033898.164.74$1,601
May 2014035794.734.73$1,687
Apr 2014037895.944.81$1,818
Mar 2014039295.895.06$1,982
Feb 2014054097.406.19$3,344
Jan 201405890.404.86$282
Dec 2013038191.824.35$1,659
Nov 2013037688.853.74$1,406
Oct 2013038697.423.78$1,459
Sep 20130364104.113.72$1,353
Aug 20130404104.253.52$1,423
Jul 20130442102.523.72$1,643
Jun 2013044694.403.93$1,754
May 2013034394.834.15$1,423
Apr 2013041493.964.28$1,773
Mar 2013035393.623.91$1,381
Feb 2013036491.233.42$1,245
Jan 2013043791.603.42$1,495
Dec 2012037786.773.42$1,289
Nov 2012041086.953.62$1,486
Oct 2012047689.383.40$1,618
Sep 2012041394.672.92$1,205
Aug 2012039892.662.91$1,157
Jul 2012042585.133.02$1,284
Jun 2012048679.822.52$1,224
May 2012031791.612.49$789
Apr 20120420101.652.00$839
Mar 20120447105.052.22$993
Feb 20120418101.102.57$1,074
Jan 2012047898.092.73$1,307
Dec 2011039296.873.24$1,270
Nov 2011043995.723.31$1,454
Oct 2011042884.983.65$1,562
Sep 2011046483.623.99$1,849
Aug 2011043183.404.15$1,788
Jul 2011045694.144.52$2,060
Jun 2011046592.904.64$2,158
May 2011047498.134.40$2,088
Apr 20110435105.964.33$1,885
Mar 2011048596.364.06$1,968
Feb 2011044485.644.18$1,856
Jan 2011056886.504.59$2,606
Dec 2010042085.734.35$1,826
Nov 2010040180.843.80$1,522
Oct 2010043378.103.51$1,519
Sep 2010024672.633.98$979
Aug 2010041673.684.42$1,838
Jul 2010052772.554.74$2,496
Jun 2010016370.364.91$800
May 2010045371.124.24$1,919
Apr 2010044081.694.12$1,814
Mar 2010038878.394.39$1,703
Feb 2010046273.585.44$2,514
Jan 2010051274.365.96$3,054
Dec 2009051171.445.48$2,802
Nov 2009050474.593.75$1,891
Oct 2009052272.544.11$2,146
Sep 2009049965.543.06$1,529
Aug 2009052667.423.22$1,693
Jul 2009054361.133.46$1,881
Jun 2009029766.163.90$1,157
May 2009048654.743.93$1,908
Apr 2009046146.773.59$1,654
Mar 2009048642.144.06$1,973
Feb 2009043532.814.63$2,015
Jan 2009049135.865.37$2,637
Dec 2008049737.105.98$2,971
Nov 2008049555.496.86$3,396
Oct 2008056275.246.92$3,890
Sep 20080337101.767.88$2,655
Aug 20080532114.228.48$4,513
Jul 20080525131.0811.39$5,979
Jun 20080501131.3313.03$6,529
May 20080535123.1711.57$6,192
Apr 20080527110.3110.45$5,510
Mar 20080550101.909.66$5,315
Feb 2008050092.538.77$4,385
Jan 2008054190.388.21$4,439
Dec 2007055488.337.30$4,045
Nov 2007054991.677.29$4,003
Oct 2007056382.856.92$3,897
Sep 2007050975.846.24$3,178
Aug 2007060269.066.39$3,846
Jul 2007078570.906.39$5,015
Jun 2007030362.007.55$2,287
May 2007043458.747.85$3,405
Apr 2007055159.617.81$4,301
Mar 2007032456.927.30$2,366
Feb 2007040155.108.22$3,295
Jan 2007041250.306.73$2,771
Dec 2006038856.656.92$2,684
Nov 2006031654.207.62$2,407
Oct 2006053254.906.01$3,199
Sep 2006023060.085.04$1,159
Aug 2006040968.717.34$3,002
Jul 2006058369.376.34$3,698
Jun 2006046366.286.38$2,956
May 2006044766.016.42$2,872
Apr 2006034164.397.36$2,510
Mar 2006055656.707.08$3,938
Feb 2006058257.597.75$4,511
Jan 2006044060.598.93$3,931
Dec 2005043254.9413.42$5,795
Nov 2005017254.6910.59$1,821
Oct 2005052358.3413.80$7,215
Sep 2005064861.4512.08$7,827
Aug 2005070161.519.80$6,868
Jul 2005059655.697.84$4,675
Jun 2005061452.337.38$4,532
May 2005055345.226.65$3,678
Apr 2005058749.207.36$4,321
Mar 2005065650.377.15$4,694
Feb 2005052645.226.31$3,320
Jan 2005062643.166.32$3,958
Dec 2004062339.866.75$4,206
Nov 2004059545.286.33$3,767
Oct 2004058649.706.52$3,818
Sep 2004061443.245.28$3,244
Aug 2004062642.375.55$3,475
Jul 2004064538.286.08$3,924
Jun 2004066736.106.43$4,291
May 2004062837.486.49$4,079
Apr 2004055534.475.86$3,251
Mar 2004056934.365.53$3,147
Feb 2004059432.455.51$3,273
Jan 2004063132.036.30$3,975
Dec 2003059630.266.30$3,756
Nov 2003058328.804.60$2,679
Oct 2003065328.174.76$3,108
Sep 2003064126.314.75$3,044
Aug 2003069329.765.13$3,555
Jul 2003072029.415.17$3,723
Jun 2003070528.565.98$4,218
May 2003073526.595.97$4,390
Apr 2003072526.675.41$3,920
Mar 2003070531.146.10$4,298
Feb 2003053333.487.93$4,224
Jan 2003070930.315.58$3,958
Dec 2002064026.914.85$3,106
Nov 2002068624.664.14$2,838
Oct 2002065426.464.23$2,766
Sep 2002065927.443.64$2,396
Aug 2002069525.963.16$2,199
Jul 2002068924.583.06$2,110
Jun 2002065423.733.34$2,183
May 2002068124.663.58$2,441
Apr 2002052523.653.51$1,844
Mar 2002069822.003.10$2,166
Feb 2002060318.222.38$1,433
Jan 2002065117.172.38$1,547
Dec 2001066816.932.36$1,579
Nov 2001067318.072.41$1,619
Oct 2001045619.782.53$1,153
Sep 2001068024.262.25$1,531
Aug 2001074424.873.05$2,272
Jul 2001047023.933.20$1,503
Jun 2001061824.563.82$2,363
May 2001068725.524.31$2,959
Apr 2001059224.685.34$3,159
Mar 2001062324.545.38$3,350
Feb 2001061327.755.77$3,535
Jan 2001069927.478.40$5,871
Dec 2000059926.889.12$5,464
Nov 2000060732.215.66$3,434
Oct 2000074731.235.15$3,844
Sep 2000044731.875.19$2,318
Aug 2000044929.644.54$2,039
Jul 2000067228.534.09$2,748
Jun 2000061629.304.40$2,709
May 2000068827.263.68$2,532
Apr 2000080524.513.12$2,508
Mar 2000077228.422.86$2,208
Feb 2000070727.622.73$1,928
Jan 2000057625.272.48$1,429
Dec 1999068224.282.42$1,653
Nov 1999077023.192.43$1,874
Oct 1999063620.982.80$1,783
Sep 1999059621.752.62$1,561
Aug 1999055519.262.88$1,596
Jul 1999070217.892.37$1,665
Jun 1999063815.942.36$1,507
May 1999057715.792.32$1,339
Apr 1999041815.102.21$923
Mar 1999050812.471.84$934
Feb 199904799.981.82$871
Jan 1999052010.381.90$988
Dec 199809269.201.77$1,642
Nov 1998012310.892.19$269
Oct 1998053112.421.97$1,046
Sep 1998074112.592.08$1,543
Aug 199802,30711.301.91$4,400
Jul 1998064111.742.24$1,434
Jun 1998076511.242.24$1,712
May 1998059112.622.21$1,304
Apr 1998062113.042.51$1,556
Mar 1998088112.802.31$2,035
Feb 1998078013.952.30$1,793
Jan 199801,04414.702.15$2,250
Dec 199701,02016.322.41$2,459
Nov 1997098618.193.09$3,045
Oct 1997075019.253.15$2,362
Sep 1997084017.742.95$2,482
Aug 1997088917.862.55$2,271
Jul 1997078117.582.25$1,755
Jun 1997081917.242.26$1,849
May 1997081618.972.31$1,884
Apr 1997091517.882.08$1,906
Mar 1997093118.951.94$1,805
Feb 1997077620.492.21$1,712
Jan 1997090423.483.54$3,200
Dec 1996094923.32$0
Nov 199601,08921.97$0
Oct 1996097423.31$0
Sep 1996094322.22$0
Aug 1996096320.26$0
Jul 1996086419.55$0
Jun 1996098718.73$0
May 1996095419.43$0
Apr 1996095421.51$0
Mar 199601,06419.38$0
Feb 199601,12416.98$0
Jan 1996083017.07$0
Dec 1995095117.19$0
Nov 1995090516.00$0
Oct 1995092815.43$0
Sep 1995087316.18$0
Aug 1995082915.92$0
Jul 1995095615.24$0
Jun 1995099716.41$0
May 1995091817.56$0
Apr 1995080417.73$0
Mar 1995090916.44$0
Feb 1995080216.58$0
Jan 1995087115.92$0
Dec 1994093515.03$0
Nov 199401,22115.90$0
Oct 199401,08515.58$0
Sep 199401,30615.29$0
Aug 199401,19116.13$0
Jul 199401,18017.56$0
Jun 199401,10617.09$0
May 199401,08115.88$0
Apr 199401,14614.14$0
Mar 199401,02612.46$0
Feb 1994086812.50$0
Jan 199401,03412.66$0
Dec 1993066712.33$0
Nov 199301,01514.49$0
Oct 199301,12815.85$0
Sep 1993085015.03$0
Aug 199301,11115.66$0
Jul 199301,18515.46$0
Jun 1993045616.79$0
May 1993085717.68$0
Apr 1993088718.05$0
Mar 1993099218.14$0
Feb 199301,22117.90$0
Jan 199301,13816.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             2 bbl  × $106.41 =       $213
Gas                  348 Mcf  × $  3.05 =     $1,060

────────────────────────────────────────────────────
Month total                                   $1,273

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/130880 is the state's own key, not one this site invented.