HOOVER 14A

Operated by PRIMAL ENERGY CORPORATION (P-5 677741) in the AMERICAN (SPRABERRY A) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 131404District 7CField 02328496CondensateGasSaveExport
Value, all time
$22 k
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
1980-08-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFF. 7-1-81 PER AMENDMENT TO SWR 28 & 29

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition80 bbl$7,552
GasProduction3,774 Mcf$13,953
Total$21,505

641 Mcf of this lease's gas, across 45 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4731, -101.6673. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.47314, -101.66734 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,300 ft.

Completions filed
Jul 1983
1 of 1 wells

1 well

42-1053434014,300 ftJul 1983

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 202401471.372.28$32
Sep 202401769.612.36$40
Aug 20240775.632.06$14
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240473.023.30$13
Dec 20230171.262.61$3
Nov 20230277.892.81$6
Oct 20230085.443.09$0
Sep 20230189.042.74$3
Aug 20230080.522.67$0
Jul 20230274.852.64$5
Jun 20230468.962.26$9
May 20230370.622.23$7
Apr 20230378.122.24$7
Mar 20230372.852.39$7
Feb 20230475.112.47$10
Jan 20230276.533.39$7
Dec 20220376.415.73$17
Nov 20220385.005.65$17
Oct 20220387.185.86$18
Sep 20220384.888.16$24
Aug 20220394.529.13$27
Jul 202204101.587.54$30
Jun 202203115.097.98$24
May 202204109.378.43$34
Apr 202203104.226.84$21
Mar 202202108.885.08$10
Feb 20220391.054.86$15
Jan 20220581.844.54$23
Dec 20210371.323.90$12
Nov 20210377.435.24$16
Oct 20210379.795.71$17
Sep 20210469.865.35$21
Aug 20210466.024.22$17
Jul 20210370.783.98$12
Jun 20210369.493.38$10
May 20210363.483.02$9
Apr 20210360.362.76$8
Mar 20210361.302.72$8
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200144.642.68$3
Nov 20200138.772.71$3
Oct 20200236.972.48$5
Sep 20200137.091.99$2
Aug 20200239.982.39$5
Jul 20200238.371.83$4
Jun 20200134.901.69$2
May 20200216.921.81$4
Apr 20200214.751.80$4
Mar 20200130.341.86$2
Feb 20200249.881.98$4
Jan 20200257.252.09$4
Dec 20190059.012.30$0
Nov 20190455.302.75$11
Oct 20190453.472.42$10
Sep 20190355.052.66$8
Aug 20190453.112.30$9
Jul 20190456.272.46$10
Jun 20190452.782.49$10
May 20190458.482.74$11
Apr 20190462.632.75$11
Mar 20190456.803.06$12
Feb 20190450.852.79$11
Jan 20190446.033.23$13
Dec 20180446.594.19$17
Nov 20180452.934.24$17
Oct 20180461.443.40$14
Sep 20180459.543.11$12
Aug 20180559.403.07$15
Jul 20180465.142.93$12
Jun 20180460.183.08$12
May 20180465.382.90$12
Apr 20180463.842.90$12
Mar 20180461.222.79$11
Feb 20180461.782.77$11
Jan 20180462.874.01$16
Dec 20170457.272.92$12
Nov 20170455.423.12$12
Oct 20170449.292.98$12
Sep 20170447.523.09$12
Aug 20170445.373.00$12
Jul 20170443.873.09$12
Jun 20170442.493.09$12
May 20170345.373.26$10
Apr 20170447.933.21$13
Mar 20170346.772.98$9
Feb 20170450.452.95$12
Jan 20170449.413.42$14
Dec 20160448.763.72$15
Nov 20160442.492.64$11
Oct 20160446.193.09$12
Sep 20160441.553.10$12
Aug 20160441.442.92$12
Jul 20160441.622.92$12
Jun 20160445.352.69$11
May 20160442.521.99$8
Apr 20160436.561.99$8
Mar 20160433.011.79$7
Feb 20160426.472.06$8
Jan 20160427.352.36$9
Dec 20150432.362.00$8
Nov 20150438.792.17$9
Oct 20150443.552.43$10
Sep 20150442.992.76$11
Aug 20150440.162.87$11
Jul 20150448.152.95$12
Jun 20150456.152.88$12
May 20150455.212.96$12
Apr 20150449.822.71$11
Mar 20150442.892.93$12
Feb 20150444.662.98$12
Jan 20150443.433.10$12
Dec 20140454.693.59$14
Nov 20140470.464.25$17
Oct 20140478.303.90$16
Sep 20140386.164.05$12
Aug 20140489.394.04$16
Jul 20140496.564.18$17
Jun 20140498.164.74$19
May 20140494.734.73$19
Apr 20140495.944.81$19
Mar 20140495.895.06$20
Feb 20140497.406.19$25
Jan 20140490.404.86$19
Dec 20130491.824.35$17
Nov 20130488.853.74$15
Oct 20130497.423.78$15
Sep 201304104.113.72$15
Aug 201304104.253.52$14
Jul 201304102.523.72$15
Jun 201380494.403.93$7,568
May 20130494.834.15$17
Apr 201301193.964.28$47
Mar 20130193.623.91$4
Feb 20130191.233.42$3
Jan 20130191.603.42$3
Dec 20120186.773.42$3
Nov 20120186.953.62$4
Oct 20120289.383.40$7
Sep 20120294.672.92$6
Aug 20120292.662.91$6
Jul 20120285.133.02$6
Jun 20120279.822.52$5
May 20120291.612.49$5
Apr 201205101.652.00$10
Mar 201205105.052.22$11
Feb 201206101.102.57$15
Jan 20120598.092.73$14
Dec 20110596.873.24$16
Nov 20110695.723.31$20
Oct 20110584.983.65$18
Sep 20110683.623.99$24
Aug 20110583.404.15$21
Jul 20110594.144.52$23
Jun 20110592.904.64$23
May 20110698.134.40$26
Apr 201104105.964.33$17
Mar 201101296.364.06$49
Feb 201101285.644.18$50
Jan 201101386.504.59$60
Dec 201001285.734.35$52
Nov 201001280.843.80$46
Oct 201001278.103.51$42
Sep 201001272.633.98$48
Aug 201001273.684.42$53
Jul 201001272.554.74$57
Jun 201001270.364.91$59
May 201001371.124.24$55
Apr 201001381.694.12$54
Mar 201001378.394.39$57
Feb 201001273.585.44$65
Jan 201001274.365.96$72
Dec 200901371.445.48$71
Nov 200901374.593.75$49
Oct 200901472.544.11$58
Sep 200901365.543.06$40
Aug 200901267.423.22$39
Jul 200901361.133.46$45
Jun 200901366.163.90$51
May 200901354.743.93$51
Apr 200901346.773.59$47
Mar 200904042.144.06$162
Feb 200903832.814.63$176
Jan 200903635.865.37$193
Dec 20080937.105.98$54
Nov 20080855.496.86$55
Oct 200802575.246.92$173
Sep 2008013101.767.88$102
Aug 200809114.228.48$76
Jul 200809131.0811.39$103
Jun 2008013131.3313.03$169
May 2008010123.1711.57$116
Apr 2008013110.3110.45$136
Mar 2008010101.909.66$97
Feb 200801092.538.77$88
Jan 20080990.388.21$74
Dec 20070988.337.30$66
Nov 20070891.677.29$58
Oct 20070982.856.92$62
Sep 20070975.846.24$56
Aug 200701069.066.39$64
Jul 200701270.906.39$77
Jun 20070962.007.55$68
May 20070958.747.85$71
Apr 20070959.617.81$70
Mar 200701056.927.30$73
Feb 20070855.108.22$66
Jan 20070950.306.73$61
Dec 20060956.656.92$62
Nov 20060954.207.62$69
Oct 20060954.906.01$54
Sep 20060860.085.04$40
Aug 20060868.717.34$59
Jul 20060869.376.34$51
Jun 20060866.286.38$51
May 20060866.016.42$51
Apr 20060864.397.36$59
Mar 20060856.707.08$57
Feb 20060757.597.75$54
Jan 20060860.598.93$71
Dec 20050854.9413.42$107
Nov 20050854.6910.59$85
Oct 20050858.3413.80$110
Sep 20050761.4512.08$85
Aug 20050861.519.80$78
Jul 20050855.697.84$63
Jun 20050852.337.38$59
May 200501245.226.65$80
Apr 20050749.207.36$52
Mar 20050850.377.15$57
Feb 200501445.226.31$88
Jan 200501743.166.32$107
Dec 200401839.866.75$122
Nov 200401645.286.33$101
Oct 200403649.706.52$235
Sep 200401643.245.28$85
Aug 200401642.375.55$89
Jul 200401838.286.08$110
Jun 200401636.106.43$103
May 200401937.486.49$123
Apr 200401434.475.86$82
Mar 200401734.365.53$94
Feb 200401332.455.51$72
Jan 200401532.036.30$94
Dec 200301530.266.30$95
Nov 200301328.804.60$60
Oct 200301628.174.76$76
Sep 200301526.314.75$71
Aug 200307629.765.13$390
Jul 20030429.415.17$21
Jun 200301228.565.98$72
May 200301626.595.97$96
Apr 200301526.675.41$81
Mar 200301531.146.10$91
Feb 200301233.487.93$95
Jan 200301930.315.58$106
Dec 20020826.914.85$39
Nov 200201524.664.14$62
Oct 20020826.464.23$34
Sep 20020827.443.64$29
Aug 200201625.963.16$51
Jul 200201424.583.06$43
Jun 200201423.733.34$47
May 200201524.663.58$54
Apr 200201423.653.51$49
Mar 200201422.003.10$43
Feb 200201418.222.38$33
Jan 200201217.172.38$29
Dec 200101316.932.36$31
Nov 200101318.072.41$31
Oct 200101319.782.53$33
Sep 200101224.262.25$27
Aug 200101924.873.05$58
Jul 200101323.933.20$42
Jun 200101124.563.82$42
May 200101825.524.31$78
Apr 200101924.685.34$101
Mar 200101324.545.38$70
Feb 200101327.755.77$75
Jan 200101927.478.40$160
Dec 200001926.889.12$173
Nov 200001732.215.66$96
Oct 200002731.235.15$139
Sep 200002831.875.19$145
Aug 200001029.644.54$45
Jul 200001828.534.09$74
Jun 200002429.304.40$106
May 200001927.263.68$70
Apr 200005324.513.12$165
Mar 200007828.422.86$223
Feb 200001727.622.73$46
Jan 200002425.272.48$60
Dec 199902424.282.42$58
Nov 199902423.192.43$58
Oct 199902420.982.80$67
Sep 199902421.752.62$63
Aug 199902519.262.88$72
Jul 199903017.892.37$71
Jun 199902715.942.36$64
May 199902215.792.32$51
Apr 199902215.102.21$49
Mar 19990612.471.84$11
Feb 1999079.981.82$13
Jan 19990610.381.90$11
Dec 1998029.201.77$4
Nov 19980410.892.19$9
Oct 199801312.421.97$26
Sep 199802212.592.08$46
Aug 19980611.301.91$11
Jul 199803311.742.24$74
Jun 199801511.242.24$34
May 199802912.622.21$64
Apr 199802213.042.51$55
Mar 19980412.802.31$9
Feb 199802213.952.30$51
Jan 199802214.702.15$47
Dec 199703316.322.41$80
Nov 19970518.193.09$15
Oct 19970119.253.15$3
Sep 19970117.742.95$3
Aug 199701017.862.55$26
Jul 199701217.582.25$27
Jun 19970917.242.26$20
May 199701518.972.31$35
Apr 199702417.882.08$50
Mar 199701718.951.94$33
Feb 199702620.492.21$57
Jan 19970023.483.54$0
Dec 19960123.32$0
Nov 19960221.97$0
Oct 19960623.31$0
Sep 19960322.22$0
Aug 19960220.26$0
Jul 19960819.55$0
Jun 19960518.73$0
May 19960019.43$0
Apr 19960121.51$0
Mar 19960119.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950117.19$0
Nov 19950216.00$0
Oct 19950215.43$0
Sep 19950516.18$0
Aug 199501015.92$0
Jul 19950215.24$0
Jun 19950216.41$0
May 19950917.56$0
Apr 19950817.73$0
Mar 199502016.44$0
Feb 199501916.58$0
Jan 19950415.92$0
Dec 19940615.03$0
Nov 19940715.90$0
Oct 199401715.58$0
Sep 199401815.29$0
Aug 19940216.13$0
Jul 19940317.56$0
Jun 199402717.09$0
May 199402015.88$0
Apr 199402514.14$0
Mar 199403312.46$0
Feb 19940812.50$0
Jan 199401312.66$0
Dec 199303412.33$0
Nov 199301114.49$0
Oct 199301915.85$0
Sep 199302515.03$0
Aug 199302115.66$0
Jul 19930115.46$0
Jun 19930416.79$0
May 199304617.68$0
Apr 199309418.05$0
Mar 199304918.14$0
Feb 199303017.90$0
Jan 199301516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 71.37 =         $0
Gas                   14 Mcf  × $  2.28 =        $32

────────────────────────────────────────────────────
Month total                                      $32

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/131404 is the state's own key, not one this site invented.