HATTON, E.H. ESTATE '13'

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 133260District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$603 k
Jan 1993 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111990-07-11121898
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition20 bbl$1,288
GasProduction233,073 Mcf$601,445
Total$602,733

89,390 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4246, -101.5571. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42460, -101.55707 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,475 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,475 ft.

Completions filed
Jan 1990
1 of 1 wells

1 well

42-1053571967,475 ftJan 1990

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260129106.413.05$393
Apr 2026120198.932.87$676
Mar 20260089.753.15$0
Feb 2026114863.503.75$619
Jan 2026221959.138.00$1,870
Dec 2025216256.664.41$828
Nov 2025110758.593.93$479
Oct 2025118359.383.30$664
Sep 2025119862.743.08$672
Aug 2025219063.933.01$701
Jul 2025120766.743.32$753
Jun 2025114166.483.13$508
May 2025214160.553.23$577
Apr 2025216162.363.54$695
Mar 2025214167.704.27$737
Feb 202517670.884.34$401
Jan 20250074.324.28$0
Dec 2024012668.993.12$393
Nov 2024012369.052.20$270
Oct 2024020071.372.28$456
Sep 2024010169.612.36$239
Aug 2024017475.632.06$359
Jul 2024016979.932.15$363
Jun 2024019178.082.63$503
May 2024011678.812.20$255
Apr 2024018184.451.66$300
Mar 2024021780.301.55$335
Feb 202403476.091.78$61
Jan 2024016873.023.30$554
Dec 2023019371.262.61$504
Nov 2023019477.892.81$545
Oct 2023023585.443.09$726
Sep 2023022689.042.74$618
Aug 2023024180.522.67$644
Jul 2023024774.852.64$653
Jun 2023022568.962.26$508
May 2023022270.622.23$494
Apr 2023023578.122.24$526
Mar 2023019072.852.39$455
Feb 2023018175.112.47$446
Jan 2023020976.533.39$708
Dec 2022023176.415.73$1,323
Nov 2022025685.005.65$1,445
Oct 2022022687.185.86$1,325
Sep 2022021484.888.16$1,747
Aug 2022023694.529.13$2,154
Jul 20220261101.587.54$1,968
Jun 20220261115.097.98$2,082
May 20220234109.378.43$1,973
Apr 20220215104.226.84$1,470
Mar 20220125108.885.08$635
Feb 2022011791.054.86$568
Jan 2022016681.844.54$753
Dec 2021021671.323.90$842
Nov 2021021277.435.24$1,110
Oct 2021023679.795.71$1,348
Sep 2021024369.865.35$1,300
Aug 2021025566.024.22$1,076
Jul 2021024670.783.98$980
Jun 2021025569.493.38$862
May 2021019663.483.02$591
Apr 2021023460.362.76$645
Mar 2021026461.302.72$717
Feb 2021025257.805.55$1,398
Jan 2021024250.412.81$680
Dec 2020017044.642.68$455
Nov 2020018438.772.71$498
Oct 2020019436.972.48$481
Sep 2020016637.091.99$331
Aug 2020018339.982.39$436
Jul 2020018638.371.83$339
Jun 2020018634.901.69$314
May 2020019616.921.81$356
Apr 2020021714.751.80$392
Mar 2020022430.341.86$416
Feb 2020021049.881.98$416
Jan 2020024057.252.09$503
Dec 2019023559.012.30$542
Nov 2019021055.302.75$578
Oct 2019022853.472.42$551
Sep 2019023555.052.66$624
Aug 2019025453.112.30$585
Jul 2019025356.272.46$622
Jun 2019021652.782.49$538
May 2019024958.482.74$682
Apr 2019023962.632.75$657
Mar 2019027556.803.06$842
Feb 201909850.852.79$274
Jan 2019023246.033.23$749
Dec 2018023846.594.19$996
Nov 2018023052.934.24$975
Oct 2018025461.443.40$863
Sep 2018025959.543.11$805
Aug 2018022559.403.07$690
Jul 2018025365.142.93$742
Jun 2018024860.183.08$763
May 2018025265.382.90$731
Apr 2018024763.842.90$717
Mar 2018024961.222.79$694
Feb 2018023161.782.77$639
Jan 2018023462.874.01$938
Dec 2017026057.272.92$760
Nov 2017026855.423.12$836
Oct 2017020449.292.98$609
Sep 2017020547.523.09$633
Aug 2017025245.373.00$757
Jul 2017019243.873.09$593
Jun 2017020442.493.09$630
May 2017020045.373.26$653
Apr 2017021447.933.21$687
Mar 2017021946.772.98$653
Feb 2017017850.452.95$526
Jan 2017015549.413.42$530
Dec 2016020948.763.72$778
Nov 2016021642.492.64$571
Oct 2016024346.193.09$751
Sep 2016023341.553.10$722
Aug 2016024241.442.92$708
Jul 2016026941.622.92$787
Jun 2016026145.352.69$701
May 2016027042.521.99$538
Apr 2016025036.561.99$498
Mar 2016023733.011.79$425
Feb 2016016826.472.06$347
Jan 2016016427.352.36$388
Dec 2015019932.362.00$398
Nov 2015025738.792.17$557
Oct 2015027243.552.43$660
Sep 2015022642.992.76$623
Aug 2015022440.162.87$643
Jul 2015023248.152.95$683
Jun 2015023256.152.88$669
May 2015023055.212.96$680
Apr 2015023049.822.71$623
Mar 2015022742.892.93$666
Feb 2015016644.662.98$494
Jan 2015016143.433.10$499
Dec 2014022154.693.59$794
Nov 2014020870.464.25$884
Oct 2014023378.303.90$909
Sep 2014023486.164.05$947
Aug 2014028989.394.04$1,166
Jul 2014028496.564.18$1,187
Jun 2014027698.164.74$1,307
May 2014028394.734.73$1,338
Apr 2014028195.944.81$1,351
Mar 2014024495.895.06$1,234
Feb 2014017597.406.19$1,084
Jan 2014026090.404.86$1,264
Dec 201307491.824.35$322
Nov 2013027988.853.74$1,043
Oct 2013030397.423.78$1,145
Sep 20130299104.113.72$1,112
Aug 20130308104.253.52$1,085
Jul 20130320102.523.72$1,190
Jun 2013031694.403.93$1,243
May 2013023194.834.15$958
Apr 2013028893.964.28$1,233
Mar 2013024493.623.91$955
Feb 2013022491.233.42$766
Jan 2013023791.603.42$811
Dec 2012024386.773.42$831
Nov 2012026586.953.62$961
Oct 2012028389.383.40$962
Sep 2012026494.672.92$770
Aug 2012029192.662.91$846
Jul 2012028785.133.02$867
Jun 2012027279.822.52$685
May 2012029491.612.49$732
Apr 20120270101.652.00$539
Mar 20120288105.052.22$640
Feb 20120254101.102.57$653
Jan 2012024898.092.73$678
Dec 2011028196.873.24$910
Nov 2011027995.723.31$924
Oct 2011029084.983.65$1,058
Sep 2011028683.623.99$1,140
Aug 2011031583.404.15$1,307
Jul 2011032294.144.52$1,455
Jun 2011033092.904.64$1,531
May 2011035898.134.40$1,577
Apr 20110322105.964.33$1,395
Mar 2011023796.364.06$962
Feb 2011019685.644.18$819
Jan 2011029086.504.59$1,331
Dec 2010024585.734.35$1,065
Nov 2010028980.843.80$1,097
Oct 2010025578.103.51$895
Sep 2010031872.633.98$1,265
Aug 2010033173.684.42$1,463
Jul 2010028872.554.74$1,364
Jun 2010036070.364.91$1,768
May 2010016771.124.24$707
Apr 2010025681.694.12$1,055
Mar 2010033678.394.39$1,475
Feb 2010025473.585.44$1,382
Jan 2010041474.365.96$2,469
Dec 2009037071.445.48$2,029
Nov 2009038774.593.75$1,452
Oct 2009026872.544.11$1,102
Sep 2009031765.543.06$972
Aug 2009032367.423.22$1,040
Jul 2009034361.133.46$1,188
Jun 2009040566.163.90$1,577
May 2009033954.743.93$1,331
Apr 2009030846.773.59$1,105
Mar 2009028742.144.06$1,165
Feb 2009024932.814.63$1,154
Jan 2009029035.865.37$1,558
Dec 2008026837.105.98$1,602
Nov 2008027055.496.86$1,852
Oct 2008034475.246.92$2,381
Sep 20080265101.767.88$2,087
Aug 20080422114.228.48$3,580
Jul 20080420131.0811.39$4,784
Jun 20080428131.3313.03$5,578
May 20080554123.1711.57$6,412
Apr 20080722110.3110.45$7,548
Mar 20080471101.909.66$4,552
Feb 2008037592.538.77$3,289
Jan 2008030190.388.21$2,470
Dec 2007037488.337.30$2,731
Nov 2007032191.677.29$2,341
Oct 2007034182.856.92$2,360
Sep 2007033675.846.24$2,098
Aug 2007042369.066.39$2,702
Jul 2007051470.906.39$3,283
Jun 2007049162.007.55$3,706
May 2007045058.747.85$3,531
Apr 2007052459.617.81$4,090
Mar 2007056456.927.30$4,118
Feb 2007050055.108.22$4,108
Jan 2007031450.306.73$2,112
Dec 2006050356.656.92$3,480
Nov 2006059154.207.62$4,502
Oct 2006059554.906.01$3,578
Sep 2006056260.085.04$2,831
Aug 2006057068.717.34$4,184
Jul 2006063169.376.34$4,002
Jun 2006044666.286.38$2,847
May 2006056866.016.42$3,649
Apr 2006047464.397.36$3,489
Mar 2006030756.707.08$2,174
Feb 2006047157.597.75$3,651
Jan 20060060.598.93$0
Dec 2005039954.9413.42$5,353
Nov 2005038954.6910.59$4,119
Oct 2005038558.3413.80$5,311
Sep 2005032161.4512.08$3,877
Aug 2005037061.519.80$3,625
Jul 2005040055.697.84$3,137
Jun 2005045352.337.38$3,344
May 2005044445.226.65$2,953
Apr 2005045449.207.36$3,342
Mar 2005038350.377.15$2,740
Feb 2005038345.226.31$2,417
Jan 2005038343.166.32$2,421
Dec 2004037039.866.75$2,498
Nov 2004038945.286.33$2,463
Oct 2004049149.706.52$3,199
Sep 2004051643.245.28$2,726
Aug 2004055242.375.55$3,064
Jul 2004048538.286.08$2,951
Jun 2004050436.106.43$3,242
May 2004049537.486.49$3,215
Apr 2004049134.475.86$2,877
Mar 2004057734.365.53$3,191
Feb 2004045032.455.51$2,479
Jan 2004053432.036.30$3,364
Dec 2003051330.266.30$3,233
Nov 2003052428.804.60$2,408
Oct 2003062528.174.76$2,975
Sep 2003062126.314.75$2,949
Aug 2003065029.765.13$3,334
Jul 2003064029.415.17$3,309
Jun 2003057728.565.98$3,452
May 2003057426.595.97$3,428
Apr 2003058426.675.41$3,158
Mar 2003066431.146.10$4,048
Feb 2003058933.487.93$4,668
Jan 2003069930.315.58$3,902
Dec 2002069626.914.85$3,378
Nov 2002070124.664.14$2,900
Oct 2002070226.464.23$2,969
Sep 2002067327.443.64$2,446
Aug 2002070425.963.16$2,228
Jul 2002070024.583.06$2,143
Jun 2002067423.733.34$2,250
May 2002066624.663.58$2,387
Apr 2002064623.653.51$2,269
Mar 2002058722.003.10$1,821
Feb 2002053218.222.38$1,264
Jan 2002055817.172.38$1,326
Dec 2001059816.932.36$1,414
Nov 2001059318.072.41$1,426
Oct 2001058919.782.53$1,490
Sep 2001055524.262.25$1,249
Aug 2001070824.873.05$2,162
Jul 2001077723.933.20$2,484
Jun 2001075124.563.82$2,872
May 2001078825.524.31$3,394
Apr 2001078724.685.34$4,199
Mar 2001076724.545.38$4,124
Feb 2001069427.755.77$4,002
Jan 2001063427.478.40$5,325
Dec 2000071126.889.12$6,486
Nov 2000062932.215.66$3,559
Oct 2000071431.235.15$3,674
Sep 2000070031.875.19$3,631
Aug 2000077429.644.54$3,515
Jul 2000073028.534.09$2,986
Jun 2000071929.304.40$3,162
May 2000073927.263.68$2,719
Apr 2000072724.513.12$2,265
Mar 2000079328.422.86$2,268
Feb 2000076227.622.73$2,078
Jan 2000077125.272.48$1,912
Dec 1999077224.282.42$1,871
Nov 1999079423.192.43$1,933
Oct 1999086920.982.80$2,436
Sep 1999083921.752.62$2,197
Aug 1999091219.262.88$2,623
Jul 1999083817.892.37$1,988
Jun 1999090515.942.36$2,138
May 1999075415.792.32$1,750
Apr 1999078515.102.21$1,733
Mar 1999094912.471.84$1,745
Feb 199908139.981.82$1,478
Jan 1999086110.381.90$1,636
Dec 199809359.201.77$1,658
Nov 1998091110.892.19$1,991
Oct 199801,02312.421.97$2,015
Sep 1998071012.592.08$1,479
Aug 1998092311.301.91$1,760
Jul 199801,00811.742.24$2,255
Jun 199801,03411.242.24$2,313
May 199801,11512.622.21$2,460
Apr 199801,11313.042.51$2,788
Mar 199801,13012.802.31$2,610
Feb 199801,12413.952.30$2,584
Jan 199801,19714.702.15$2,579
Dec 199701,21216.322.41$2,922
Nov 199701,23818.193.09$3,823
Oct 199701,25119.253.15$3,940
Sep 199701,23617.742.95$3,652
Aug 199701,27117.862.55$3,247
Jul 199701,30717.582.25$2,937
Jun 199701,45017.242.26$3,273
May 199701,45118.972.31$3,350
Apr 1997096517.882.08$2,010
Mar 1997095518.951.94$1,852
Feb 1997093820.492.21$2,069
Jan 199701,21923.483.54$4,315
Dec 199601,27823.32$0
Nov 199601,23121.97$0
Oct 199601,30923.31$0
Sep 199601,21522.22$0
Aug 199601,08820.26$0
Jul 1996098719.55$0
Jun 199601,41718.73$0
May 199601,63419.43$0
Apr 199601,62521.51$0
Mar 199601,65419.38$0
Feb 199601,71616.98$0
Jan 199601,78017.07$0
Dec 199501,91617.19$0
Nov 199501,64116.00$0
Oct 199501,80115.43$0
Sep 199501,62516.18$0
Aug 199501,83415.92$0
Jul 199501,91415.24$0
Jun 199501,69316.41$0
May 199501,91517.56$0
Apr 199501,77217.73$0
Mar 199501,87216.44$0
Feb 199501,67616.58$0
Jan 199502,01215.92$0
Dec 199402,02015.03$0
Nov 199401,96915.90$0
Oct 199401,81015.58$0
Sep 199401,96715.29$0
Aug 199401,88116.13$0
Jul 199402,10617.56$0
Jun 199402,10517.09$0
May 199402,00315.88$0
Apr 199402,04514.14$0
Mar 199402,03512.46$0
Feb 199401,98412.50$0
Jan 199402,12112.66$0
Dec 199302,14312.33$0
Nov 199302,28614.49$0
Oct 199302,11415.85$0
Sep 199302,19415.03$0
Aug 199302,25215.66$0
Jul 199302,21415.46$0
Jun 199302,19516.79$0
May 199302,25917.68$0
Apr 199302,23318.05$0
Mar 199302,37018.14$0
Feb 199302,15517.90$0
Jan 199302,32416.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  129 Mcf  × $  3.05 =       $393

────────────────────────────────────────────────────
Month total                                     $393

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/133260 is the state's own key, not one this site invented.