COUCH 29

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA, NE. (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 133381District 7CField 679980752 tax incentive programmesCondensateGasSaveExport
Value, all time
$795 k
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 800 leases and 804 wells, and the rule below applies to all of them.

Discovered
1995-10-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1997-02-27.

The Commission's schedule remark for this field reads: 38. DOCKET 7C-0214353 EFF 2/27/97 SIGNED 2/4/97

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111990-05-08121935
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition259 bbl$20,129
GasProduction236,650 Mcf$774,590
Total$794,719

55,534 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6048, -101.2912. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.60477, -101.29123 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,800 ft.

Completions filed
Jan 1990
1 of 1 wells

1 well

42-1053569566,800 ftJan 1990

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200414.751.80$7
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190456.272.46$10
Jun 20190352.782.49$7
May 201901658.482.74$44
Apr 201904062.632.75$110
Mar 2019041956.803.06$1,283
Feb 2019040550.852.79$1,131
Jan 2019041146.033.23$1,327
Dec 2018041346.594.19$1,729
Nov 20185136152.934.24$4,229
Oct 2018039561.443.40$1,342
Sep 2018037859.543.11$1,175
Aug 2018037359.403.07$1,144
Jul 2018037665.142.93$1,102
Jun 2018041560.183.08$1,277
May 2018036865.382.90$1,067
Apr 2018037963.842.90$1,099
Mar 2018038761.222.79$1,079
Feb 2018031861.782.77$880
Jan 2018033762.874.01$1,351
Dec 2017038757.272.92$1,131
Nov 2017037055.423.12$1,154
Oct 2017037349.292.98$1,113
Sep 2017048247.523.09$1,488
Aug 2017040345.373.00$1,211
Jul 2017039943.873.09$1,232
Jun 2017037342.493.09$1,152
May 2017038745.373.26$1,263
Apr 2017037647.933.21$1,208
Mar 2017039846.772.98$1,188
Feb 2017031450.452.95$927
Jan 2017040249.413.42$1,374
Dec 2016038948.763.72$1,448
Nov 2016031242.492.64$825
Oct 2016040946.193.09$1,264
Sep 2016044341.553.10$1,374
Aug 2016044341.442.92$1,295
Jul 2016042741.622.92$1,249
Jun 2016043845.352.69$1,176
May 2016043942.521.99$874
Apr 2016042136.561.99$838
Mar 2016044633.011.79$800
Feb 2016040426.472.06$834
Jan 2016043727.352.36$1,033
Dec 2015044632.362.00$893
Nov 2015043338.792.17$938
Oct 2015046343.552.43$1,124
Sep 2015045342.992.76$1,250
Aug 2015046840.162.87$1,344
Jul 2015049348.152.95$1,452
Jun 2015057256.152.88$1,649
May 2015023055.212.96$680
Apr 2015041749.822.71$1,129
Mar 2015044242.892.93$1,297
Feb 2015040244.662.98$1,196
Jan 2015044943.433.10$1,392
Dec 2014044754.693.59$1,605
Nov 2014044270.464.25$1,879
Oct 2014042178.303.90$1,642
Sep 2014047586.164.05$1,922
Aug 2014048289.394.04$1,945
Jul 2014043096.564.18$1,797
Jun 2014046598.164.74$2,203
May 2014048594.734.73$2,292
Apr 2014048095.944.81$2,308
Mar 2014048995.895.06$2,473
Feb 2014044897.406.19$2,774
Jan 2014051290.404.86$2,489
Dec 2013049291.824.35$2,142
Nov 2013048688.853.74$1,817
Oct 2013054797.423.78$2,067
Sep 20130524104.113.72$1,948
Aug 20130549104.253.52$1,934
Jul 20130545102.523.72$2,026
Jun 2013053694.403.93$2,108
May 2013050194.834.15$2,079
Apr 2013052293.964.28$2,236
Mar 2013041393.623.91$1,616
Feb 2013048591.233.42$1,659
Jan 2013053491.603.42$1,826
Dec 2012063386.773.42$2,165
Nov 2012053786.953.62$1,947
Oct 2012056589.383.40$1,921
Sep 2012054494.672.92$1,588
Aug 2012057092.662.91$1,658
Jul 2012056585.133.02$1,707
Jun 2012055079.822.52$1,385
May 201211257091.612.49$11,679
Apr 20120555101.652.00$1,108
Mar 20120572105.052.22$1,271
Feb 20120533101.102.57$1,370
Jan 2012056498.092.73$1,542
Dec 2011058596.873.24$1,895
Nov 2011056295.723.31$1,861
Oct 2011047784.983.65$1,740
Sep 2011045583.623.99$1,814
Aug 2011048183.404.15$1,996
Jul 2011048494.144.52$2,186
Jun 2011047892.904.64$2,218
May 2011053998.134.40$2,374
Apr 20110363105.964.33$1,573
Mar 2011048996.364.06$1,984
Feb 2011045585.644.18$1,902
Jan 20117549586.504.59$8,759
Dec 2010049885.734.35$2,165
Nov 2010048880.843.80$1,852
Oct 2010050678.103.51$1,776
Sep 2010058972.633.98$2,344
Aug 2010060773.684.42$2,683
Jul 2010060072.554.74$2,842
Jun 2010051570.364.91$2,529
May 2010054171.124.24$2,291
Apr 2010056981.694.12$2,346
Mar 2010066178.394.39$2,901
Feb 2010061673.585.44$3,352
Jan 2010073074.365.96$4,354
Dec 2009087871.445.48$4,815
Nov 2009059274.593.75$2,221
Oct 2009058872.544.11$2,417
Sep 2009058065.543.06$1,778
Aug 2009058967.423.22$1,896
Jul 2009058461.133.46$2,023
Jun 2009057066.163.90$2,220
May 2009061154.743.93$2,399
Apr 2009052346.773.59$1,876
Mar 2009059642.144.06$2,419
Feb 2009056432.814.63$2,613
Jan 2009063735.865.37$3,421
Dec 2008064137.105.98$3,831
Nov 2008062655.496.86$4,295
Oct 2008062575.246.92$4,326
Sep 20080465101.767.88$3,663
Aug 20080581114.228.48$4,929
Jul 20080587131.0811.39$6,686
Jun 20080521131.3313.03$6,790
May 20080584123.1711.57$6,759
Apr 20080569110.3110.45$5,949
Mar 20080585101.909.66$5,653
Feb 2008055092.538.77$4,824
Jan 2008041590.388.21$3,405
Dec 2007087988.337.30$6,418
Nov 2007057591.677.29$4,193
Oct 2007048282.856.92$3,336
Sep 2007038075.846.24$2,373
Aug 2007037669.066.39$2,402
Jul 2007039070.906.39$2,491
Jun 2007035262.007.55$2,657
May 2007042658.747.85$3,343
Apr 2007036859.617.81$2,872
Mar 2007040056.927.30$2,921
Feb 2007037055.108.22$3,040
Jan 2007040150.306.73$2,697
Dec 2006039156.656.92$2,705
Nov 2006034654.207.62$2,636
Oct 2006046454.906.01$2,790
Sep 2006043260.085.04$2,176
Aug 2006039868.717.34$2,921
Jul 2006041069.376.34$2,601
Jun 2006055266.286.38$3,524
May 2006075666.016.42$4,857
Apr 2006031064.397.36$2,282
Mar 2006034456.707.08$2,437
Feb 2006062457.597.75$4,837
Jan 2006055760.598.93$4,976
Dec 2005057054.9413.42$7,647
Nov 2005037154.6910.59$3,928
Oct 2005066658.3413.80$9,188
Sep 2005051061.4512.08$6,160
Aug 2005068461.519.80$6,701
Jul 2005068455.697.84$5,365
Jun 2005069652.337.38$5,137
May 2005069445.226.65$4,616
Apr 2005072249.207.36$5,314
Mar 2005076050.377.15$5,438
Feb 2005075345.226.31$4,753
Jan 2005085343.166.32$5,393
Dec 2004088139.866.75$5,948
Nov 2004073245.286.33$4,634
Oct 2004070749.706.52$4,606
Sep 2004058443.245.28$3,086
Aug 2004088142.375.55$4,890
Jul 2004074138.286.08$4,508
Jun 2004077936.106.43$5,011
May 2004095937.486.49$6,228
Apr 2004082334.475.86$4,822
Mar 200401,10334.365.53$6,100
Feb 2004211,07932.455.51$6,626
Jan 2004097032.036.30$6,111
Dec 2003095530.266.30$6,018
Nov 200301,24528.804.60$5,721
Oct 200301,09928.174.76$5,231
Sep 2003090626.314.75$4,303
Aug 200301,16429.765.13$5,971
Jul 2003093129.415.17$4,814
Jun 2003097428.565.98$5,827
May 200301,24326.595.97$7,424
Apr 200301,09326.675.41$5,910
Mar 200301,24231.146.10$7,571
Feb 200301,15033.487.93$9,115
Jan 200301,28830.315.58$7,190
Dec 200201,09126.914.85$5,295
Nov 2002099124.664.14$4,100
Oct 2002090426.464.23$3,823
Sep 2002091827.443.64$3,337
Aug 2002098725.963.16$3,123
Jul 2002081724.583.06$2,501
Jun 200201,10323.733.34$3,682
May 200201,12524.663.58$4,032
Apr 200201,27523.653.51$4,478
Mar 2002081722.003.10$2,535
Feb 2002050318.222.38$1,195
Jan 2002061017.172.38$1,449
Dec 2001051416.932.36$1,215
Nov 2001050918.072.41$1,224
Oct 2001056419.782.53$1,426
Sep 2001055124.262.25$1,240
Aug 2001082624.873.05$2,522
Jul 2001053423.933.20$1,707
Jun 2001053824.563.82$2,057
May 2001037525.524.31$1,615
Apr 2001062024.685.34$3,308
Mar 2001050324.545.38$2,704
Feb 2001065227.755.77$3,760
Jan 2001076827.478.40$6,450
Dec 2000066926.889.12$6,103
Nov 200001,13832.215.66$6,439
Oct 2000087631.235.15$4,507
Sep 2000056631.875.19$2,936
Aug 2000061329.644.54$2,783
Jul 2000082228.534.09$3,362
Jun 2000064129.304.40$2,819
May 2000071827.263.68$2,642
Apr 2000063024.513.12$1,963
Mar 200001,01328.422.86$2,897
Feb 200001,00527.622.73$2,740
Jan 200001,02525.272.48$2,543
Dec 199901,25124.282.42$3,032
Nov 199901,32523.192.43$3,225
Oct 199901,35920.982.80$3,810
Sep 199901,45921.752.62$3,821
Aug 199901,52619.262.88$4,388
Jul 199901,46717.892.37$3,480
Jun 199901,19015.942.36$2,811
May 199901,37115.792.32$3,182
Apr 199901,19015.102.21$2,628
Mar 1999081912.471.84$1,506
Feb 199909029.981.82$1,640
Jan 199901,13310.381.90$2,153
Dec 199809599.201.77$1,701
Nov 1998094810.892.19$2,072
Oct 199801,31812.421.97$2,595
Sep 199801,16712.592.08$2,430
Aug 199801,04211.301.91$1,987
Jul 199801,25111.742.24$2,799
Jun 199801,22011.242.24$2,729
May 199801,35212.622.21$2,983
Apr 199801,21413.042.51$3,041
Mar 199801,07712.802.31$2,487
Feb 199801,16213.952.30$2,672
Jan 199802,53714.702.15$5,467
Dec 199702,00116.322.41$4,825
Nov 199701,33218.193.09$4,114
Oct 199701,03519.253.15$3,260
Sep 1997085817.742.95$2,535
Aug 199701,03317.862.55$2,639
Jul 199701,37217.582.25$3,083
Jun 199701,00817.242.26$2,275
May 199701,19118.972.31$2,749
Apr 199701,48617.882.08$3,095
Mar 199701,34718.951.94$2,612
Feb 1997097820.492.21$2,157
Jan 1997089623.483.54$3,172
Dec 199601,01023.32$0
Nov 1996068021.97$0
Oct 199601,26723.31$0
Sep 199601,05522.22$0
Aug 199601,08920.26$0
Jul 199601,11619.55$0
Jun 199601,11918.73$0
May 199601,18319.43$0
Apr 1996092421.51$0
Mar 199601,05519.38$0
Feb 199601,03416.98$0
Jan 199601,01517.07$0
Dec 199501,04017.19$0
Nov 199501,07516.00$0
Oct 199501,50315.43$0
Sep 1995092516.18$0
Aug 1995084715.92$0
Jul 1995091015.24$0
Jun 1995084416.41$0
May 1995096017.56$0
Apr 1995091617.73$0
Mar 199501,46816.44$0
Feb 199501,03516.58$0
Jan 1995094715.92$0
Dec 1994082815.03$0
Nov 1994080415.90$0
Oct 1994077015.58$0
Sep 1994092815.29$0
Aug 1994093016.13$0
Jul 1994099717.56$0
Jun 199401,06917.09$0
May 199401,23715.88$0
Apr 199401,62614.14$0
Mar 199402,20612.46$0
Feb 199401,81112.50$0
Jan 199401,82712.66$0
Dec 199301,73512.33$0
Nov 1993095514.49$0
Oct 199301,21315.85$0
Sep 1993062915.03$0
Aug 199301,07715.66$0
Jul 199301,18315.46$0
Jun 199301,21116.79$0
May 199301,02817.68$0
Apr 199301,26018.05$0
Mar 199301,53118.14$0
Feb 199301,60217.90$0
Jan 199302,06016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2020 — as filed, then multipliedworked
Condensate             0 bbl  × $ 14.75 =         $0
Gas                    4 Mcf  × $  1.80 =         $7

────────────────────────────────────────────────────
Month total                                       $7

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/133381 is the state's own key, not one this site invented.