MITCHELL-STATE, TOM "20B"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 136763District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$862 k
Jan 1993 – May 2026
Value, last 12 filed months
$12 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111991-10-03123245
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition74 bbl$4,843
GasProduction335,206 Mcf$857,614
Total$862,457

143,792 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4117, -101.5527. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.41174, -101.55267 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,320 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,320 ft.

1 well

42-1053572227,320 ft

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260229106.413.05$698
Apr 2026131498.932.87$1,000
Mar 20260089.753.15$0
Feb 2026341763.503.75$1,754
Jan 2026325259.138.00$2,193
Dec 2025415156.664.41$893
Nov 2025425158.593.93$1,220
Oct 2025224459.383.30$925
Sep 2025122062.743.08$740
Aug 2025323663.933.01$903
Jul 2025212466.743.32$545
Jun 2025222166.483.13$824
May 2025322160.553.23$896
Apr 2025111,45162.363.54$5,827
Mar 2025231,45167.704.27$7,750
Feb 20251224070.884.34$1,892
Jan 20250074.324.28$0
Dec 2024020668.993.12$643
Nov 2024012069.052.20$264
Oct 2024017671.372.28$402
Sep 2024015169.612.36$357
Aug 2024017375.632.06$357
Jul 2024020079.932.15$429
Jun 2024027078.082.63$711
May 2024028478.812.20$624
Apr 2024028784.451.66$476
Mar 2024033180.301.55$511
Feb 2024016176.091.78$287
Jan 20240173.023.30$3
Dec 202303971.262.61$102
Nov 20230077.892.81$0
Oct 20230285.443.09$6
Sep 20230489.042.74$11
Aug 202302180.522.67$56
Jul 2023010574.852.64$277
Jun 20230068.962.26$0
May 202305770.622.23$127
Apr 20230378.122.24$7
Mar 20230872.852.39$19
Feb 202307175.112.47$175
Jan 20230076.533.39$0
Dec 202205376.415.73$304
Nov 20220085.005.65$0
Oct 20220387.185.86$18
Sep 202206184.888.16$498
Aug 202206994.529.13$630
Jul 2022042101.587.54$317
Jun 2022045115.097.98$359
May 202200109.378.43$0
Apr 2022029104.226.84$198
Mar 2022076108.885.08$386
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 202002844.642.68$75
Nov 202003138.772.71$84
Oct 202003136.972.48$77
Sep 202002737.091.99$54
Aug 202003039.982.39$72
Jul 202003038.371.83$55
Jun 202003334.901.69$56
May 202003116.921.81$56
Apr 202003414.751.80$61
Mar 202003530.341.86$65
Feb 202003349.881.98$65
Jan 202003557.252.09$73
Dec 201903359.012.30$76
Nov 201903255.302.75$88
Oct 201903553.472.42$85
Sep 201903155.052.66$82
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 201906858.482.74$186
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 201901550.852.79$42
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 2018016161.443.40$547
Sep 20180659.543.11$19
Aug 20180059.403.07$0
Jul 201801665.142.93$47
Jun 201802860.183.08$86
May 2018011465.382.90$331
Apr 201803663.842.90$104
Mar 20180061.222.79$0
Feb 20180461.782.77$11
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 201704055.423.12$125
Oct 201701149.292.98$33
Sep 201701247.523.09$37
Aug 201701345.373.00$39
Jul 201701843.873.09$56
Jun 20170042.493.09$0
May 20170545.373.26$16
Apr 20170847.933.21$26
Mar 20170446.772.98$12
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 201604746.193.09$145
Sep 2016021141.553.10$654
Aug 2016025941.442.92$757
Jul 2016023841.622.92$696
Jun 2016025345.352.69$680
May 2016027642.521.99$550
Apr 2016026936.561.99$536
Mar 2016026133.011.79$468
Feb 2016024026.472.06$495
Jan 2016026127.352.36$617
Dec 2015025032.362.00$500
Nov 2015024138.792.17$522
Oct 2015026243.552.43$636
Sep 2015025742.992.76$709
Aug 2015025640.162.87$735
Jul 2015026848.152.95$789
Jun 2015026056.152.88$750
May 2015026055.212.96$768
Apr 2015026149.822.71$706
Mar 2015027142.892.93$795
Feb 2015022444.662.98$667
Jan 2015024743.433.10$766
Dec 2014027254.693.59$977
Nov 2014022970.464.25$974
Oct 2014029878.303.90$1,162
Sep 2014027386.164.05$1,104
Aug 2014028789.394.04$1,158
Jul 2014028996.564.18$1,208
Jun 2014028198.164.74$1,331
May 2014030594.734.73$1,442
Apr 2014029495.944.81$1,414
Mar 2014029395.895.06$1,482
Feb 2014026297.406.19$1,622
Jan 2014030690.404.86$1,487
Dec 2013030091.824.35$1,306
Nov 2013030488.853.74$1,136
Oct 2013032297.423.78$1,217
Sep 20130310104.113.72$1,153
Aug 20130328104.253.52$1,155
Jul 20130316102.523.72$1,175
Jun 2013022094.403.93$865
May 2013015894.834.15$656
Apr 2013018593.964.28$792
Mar 2013029793.623.91$1,162
Feb 2013032991.233.42$1,125
Jan 2013031391.603.42$1,070
Dec 2012033986.773.42$1,159
Nov 2012030586.953.62$1,106
Oct 2012032189.383.40$1,091
Sep 2012028994.672.92$843
Aug 2012030492.662.91$884
Jul 2012031085.133.02$936
Jun 2012029979.822.52$753
May 2012031791.612.49$789
Apr 20120311101.652.00$621
Mar 20120328105.052.22$729
Feb 20120328101.102.57$843
Jan 2012034098.092.73$930
Dec 2011039296.873.24$1,270
Nov 2011036295.723.31$1,199
Oct 2011034584.983.65$1,259
Sep 2011033183.623.99$1,319
Aug 2011034583.404.15$1,432
Jul 2011035394.144.52$1,595
Jun 2011034092.904.64$1,578
May 2011035898.134.40$1,577
Apr 20110344105.964.33$1,491
Mar 2011034096.364.06$1,380
Feb 2011024385.644.18$1,016
Jan 2011029586.504.59$1,354
Dec 2010039085.734.35$1,696
Nov 2010038080.843.80$1,442
Oct 2010039378.103.51$1,379
Sep 2010038472.633.98$1,528
Aug 2010035873.684.42$1,582
Jul 2010036472.554.74$1,724
Jun 2010041570.364.91$2,038
May 2010046371.124.24$1,961
Apr 2010039081.694.12$1,608
Mar 2010042478.394.39$1,861
Feb 2010042373.585.44$2,302
Jan 2010046574.365.96$2,773
Dec 2009048371.445.48$2,649
Nov 2009048174.593.75$1,804
Oct 2009040772.544.11$1,673
Sep 2009061065.543.06$1,870
Aug 2009046167.423.22$1,484
Jul 2009048961.133.46$1,694
Jun 2009047666.163.90$1,854
May 2009048754.743.93$1,912
Apr 2009050146.773.59$1,797
Mar 2009047742.144.06$1,936
Feb 2009045032.814.63$2,085
Jan 2009054935.865.37$2,949
Dec 2008056137.105.98$3,353
Nov 2008058855.496.86$4,034
Oct 2008064475.246.92$4,458
Sep 20080514101.767.88$4,049
Aug 20080619114.228.48$5,251
Jul 20080650131.0811.39$7,403
Jun 20080660131.3313.03$8,602
May 20080681123.1711.57$7,882
Apr 20080793110.3110.45$8,291
Mar 20080706101.909.66$6,823
Feb 2008055892.538.77$4,894
Jan 2008057590.388.21$4,718
Dec 2007060888.337.30$4,440
Nov 2007060991.677.29$4,441
Oct 2007062982.856.92$4,354
Sep 2007068575.846.24$4,277
Aug 2007071969.066.39$4,593
Jul 2007074770.906.39$4,772
Jun 2007065862.007.55$4,967
May 2007044758.747.85$3,507
Apr 2007062959.617.81$4,909
Mar 2007072856.927.30$5,316
Feb 2007066955.108.22$5,497
Jan 2007074650.306.73$5,018
Dec 2006074456.656.92$5,147
Nov 2006067054.207.62$5,104
Oct 2006064554.906.01$3,879
Sep 2006068460.085.04$3,445
Aug 2006071868.717.34$5,270
Jul 2006077469.376.34$4,909
Jun 2006073466.286.38$4,686
May 2006075666.016.42$4,857
Apr 2006074764.397.36$5,498
Mar 2006078956.707.08$5,588
Feb 2006076557.597.75$5,930
Jan 2006082260.598.93$7,343
Dec 2005057354.9413.42$7,687
Nov 2005070254.6910.59$7,433
Oct 2005079858.3413.80$11,009
Sep 2005086461.4512.08$10,436
Aug 2005089861.519.80$8,798
Jul 2005097055.697.84$7,608
Jun 2005093152.337.38$6,872
May 2005092245.226.65$6,132
Apr 2005096949.207.36$7,132
Mar 200501,00150.377.15$7,162
Feb 2005094445.226.31$5,958
Jan 200501,08743.166.32$6,872
Dec 200401,09839.866.75$7,413
Nov 200401,00145.286.33$6,337
Oct 200401,13649.706.52$7,401
Sep 200401,16143.245.28$6,135
Aug 2004099542.375.55$5,523
Jul 200401,02138.286.08$6,212
Jun 200401,09836.106.43$7,063
May 200401,11337.486.49$7,228
Apr 200401,14334.475.86$6,696
Mar 200401,18634.365.53$6,559
Feb 2004096932.455.51$5,339
Jan 200401,28632.036.30$8,101
Dec 200301,12330.266.30$7,077
Nov 2003097028.804.60$4,457
Oct 2003099828.174.76$4,750
Sep 200301,01426.314.75$4,816
Aug 200301,13729.765.13$5,832
Jul 200301,15229.415.17$5,957
Jun 200301,16328.565.98$6,958
May 200301,37726.595.97$8,224
Apr 200301,24426.675.41$6,727
Mar 200301,39131.146.10$8,480
Feb 200301,38833.487.93$11,001
Jan 200301,58930.315.58$8,870
Dec 200201,23226.914.85$5,980
Nov 200201,30924.664.14$5,415
Oct 200201,52426.464.23$6,445
Sep 200201,58927.443.64$5,776
Aug 200201,61325.963.16$5,104
Jul 2002051524.583.06$1,577
Jun 2002035523.733.34$1,185
May 2002051924.663.58$1,860
Apr 2002053723.653.51$1,886
Mar 2002054522.003.10$1,691
Feb 2002042718.222.38$1,014
Jan 2002055217.172.38$1,311
Dec 2001041216.932.36$974
Nov 2001050918.072.41$1,224
Oct 2001042819.782.53$1,082
Sep 2001047624.262.25$1,072
Aug 2001062424.873.05$1,905
Jul 2001065523.933.20$2,094
Jun 2001080424.563.82$3,075
May 2001063425.524.31$2,731
Apr 2001058924.685.34$3,143
Mar 2001081124.545.38$4,360
Feb 2001062427.755.77$3,599
Jan 2001065627.478.40$5,510
Dec 200001,02826.889.12$9,378
Nov 200001,40632.215.66$7,955
Oct 200001,01431.235.15$5,218
Sep 200001,70331.875.19$8,833
Aug 2000081029.644.54$3,678
Jul 200001,08128.534.09$4,421
Jun 200001,11529.304.40$4,903
May 200001,00827.263.68$3,709
Apr 200001,02824.513.12$3,203
Mar 200001,14228.422.86$3,266
Feb 200001,09027.622.73$2,972
Jan 2000070525.272.48$1,749
Dec 1999091724.282.42$2,223
Nov 199901,02123.192.43$2,485
Oct 1999098820.982.80$2,770
Sep 199901,00321.752.62$2,627
Aug 199901,21519.262.88$3,494
Jul 199901,15617.892.37$2,742
Jun 199901,35215.942.36$3,194
May 199901,43615.792.32$3,333
Apr 199901,20615.102.21$2,663
Mar 199901,34112.471.84$2,465
Feb 199901,2839.981.82$2,332
Jan 199901,34210.381.90$2,550
Dec 199801,2549.201.77$2,224
Nov 199801,39310.892.19$3,045
Oct 199801,34212.421.97$2,643
Sep 199801,43112.592.08$2,980
Aug 199801,56811.301.91$2,991
Jul 199801,02411.742.24$2,291
Jun 199801,32511.242.24$2,964
May 199801,61112.622.21$3,554
Apr 199801,57613.042.51$3,948
Mar 199801,72212.802.31$3,977
Feb 199801,86613.952.30$4,290
Jan 199801,71914.702.15$3,704
Dec 199701,76316.322.41$4,251
Nov 199701,83718.193.09$5,673
Oct 199701,96819.253.15$6,199
Sep 199702,01617.742.95$5,957
Aug 199702,12017.862.55$5,416
Jul 199701,81217.582.25$4,071
Jun 199702,00317.242.26$4,521
May 199702,19718.972.31$5,072
Apr 199702,18517.882.08$4,551
Mar 199702,24418.951.94$4,351
Feb 199702,03220.492.21$4,482
Jan 199702,55423.483.54$9,040
Dec 199602,43023.32$0
Nov 199602,26521.97$0
Oct 199602,47823.31$0
Sep 199602,35822.22$0
Aug 199602,45520.26$0
Jul 199602,53419.55$0
Jun 199602,26718.73$0
May 199602,40519.43$0
Apr 199602,23621.51$0
Mar 199602,20419.38$0
Feb 199602,37816.98$0
Jan 199602,56117.07$0
Dec 199502,45717.19$0
Nov 199502,43816.00$0
Oct 199502,67015.43$0
Sep 199502,38116.18$0
Aug 199502,64315.92$0
Jul 199502,67615.24$0
Jun 199502,56016.41$0
May 199502,76617.56$0
Apr 199502,54417.73$0
Mar 199502,89916.44$0
Feb 199502,66516.58$0
Jan 199503,05515.92$0
Dec 199403,23815.03$0
Nov 199403,28915.90$0
Oct 199402,84915.58$0
Sep 199402,93115.29$0
Aug 199402,90416.13$0
Jul 199403,53417.56$0
Jun 199403,57817.09$0
May 199403,29315.88$0
Apr 199403,54414.14$0
Mar 199403,59512.46$0
Feb 199403,50512.50$0
Jan 199403,77212.66$0
Dec 199303,42412.33$0
Nov 199303,60014.49$0
Oct 199303,61615.85$0
Sep 199303,06415.03$0
Aug 199303,45415.66$0
Jul 199303,66315.46$0
Jun 199303,65416.79$0
May 199304,06017.68$0
Apr 199303,82218.05$0
Mar 199303,93218.14$0
Feb 199303,41017.90$0
Jan 199303,73616.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  229 Mcf  × $  3.05 =       $698

────────────────────────────────────────────────────
Month total                                     $698

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently