SHURLEY, COLLIER

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 139011District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$416 k
Jan 1993 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111992-05-19125336
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition314 bbl$4,909
GasProduction239,051 Mcf$411,440
Total$416,349

133,931 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4663, -100.6322. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46628, -100.63223 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,300 ft.

Completions filed
Jul 1999
1 of 1 wells

1 well

42-4353379756,300 ftJul 1999

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260158106.413.05$481
Apr 2026012498.932.87$356
Mar 2026015789.753.15$494
Feb 2026013163.503.75$491
Jan 2026014159.138.00$1,128
Dec 2025014356.664.41$631
Nov 2025012958.593.93$507
Oct 2025015259.383.30$502
Sep 2025015062.743.08$462
Aug 2025014963.933.01$449
Jul 2025015366.743.32$507
Jun 2025013866.483.13$432
May 2025017460.553.23$562
Apr 2025013962.363.54$492
Mar 2025011567.704.27$491
Feb 2025011670.884.34$504
Jan 2025015574.324.28$663
Dec 2024014568.993.12$453
Nov 2024012569.052.20$275
Oct 2024011071.372.28$251
Sep 202406469.612.36$151
Aug 202408475.632.06$173
Jul 202409679.932.15$206
Jun 202409578.082.63$250
May 2024012778.812.20$279
Apr 2024012284.451.66$202
Mar 202409480.301.55$145
Feb 202406976.091.78$123
Jan 2024011173.023.30$366
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230785.443.09$22
Sep 20230989.042.74$25
Aug 20230780.522.67$19
Jul 202301974.852.64$50
Jun 20230568.962.26$11
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230372.852.39$7
Feb 202301575.112.47$37
Jan 202302976.533.39$98
Dec 202207376.415.73$418
Nov 202208085.005.65$452
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220291.054.86$10
Jan 202201181.844.54$50
Dec 202101471.323.90$55
Nov 202101277.435.24$63
Oct 20210879.795.71$46
Sep 20210769.865.35$37
Aug 20210666.024.22$25
Jul 20210670.783.98$24
Jun 20210469.493.38$14
May 20210263.483.02$6
Apr 20210060.362.76$0
Mar 20210161.302.72$3
Feb 20210457.805.55$22
Jan 20210850.412.81$22
Dec 202006644.642.68$177
Nov 202004738.772.71$127
Oct 202003436.972.48$84
Sep 202006237.091.99$123
Aug 202009639.982.39$229
Jul 202009838.371.83$179
Jun 202008934.901.69$150
May 202006416.921.81$116
Apr 202007714.751.80$139
Mar 202007330.341.86$136
Feb 202005649.881.98$111
Jan 202005757.252.09$119
Dec 201906859.012.30$157
Nov 201906255.302.75$171
Oct 201907553.472.42$181
Sep 201907155.052.66$189
Aug 201908953.112.30$205
Jul 201908456.272.46$207
Jun 201907952.782.49$197
May 201908058.482.74$219
Apr 201907062.632.75$193
Mar 201905856.803.06$178
Feb 201904250.852.79$117
Jan 201904846.033.23$155
Dec 201805046.594.19$209
Nov 201806552.934.24$275
Oct 201807961.443.40$268
Sep 201807059.543.11$218
Aug 201807059.403.07$215
Jul 201807265.142.93$211
Jun 201806860.183.08$209
May 201808965.382.90$258
Apr 201808363.842.90$241
Mar 201806661.222.79$184
Feb 201806261.782.77$172
Jan 201809062.874.01$361
Dec 201708757.272.92$254
Nov 201709055.423.12$281
Oct 2017010349.292.98$307
Sep 2017010547.523.09$324
Aug 201709945.373.00$297
Jul 2017010643.873.09$327
Jun 2017011142.493.09$343
May 2017011545.373.26$375
Apr 2017010447.933.21$334
Mar 20170046.772.98$0
Feb 201709050.452.95$266
Jan 2017010649.413.42$362
Dec 2016011148.763.72$413
Nov 2016011042.492.64$291
Oct 2016011446.193.09$352
Sep 2016012041.553.10$372
Aug 2016012941.442.92$377
Jul 201609741.622.92$284
Jun 201607645.352.69$204
May 2016010542.521.99$209
Apr 2016010436.561.99$207
Mar 2016010833.011.79$194
Feb 2016010526.472.06$217
Jan 2016011127.352.36$262
Dec 2015011432.362.00$228
Nov 2015020038.792.17$433
Oct 2015010643.552.43$257
Sep 2015010542.992.76$290
Aug 2015011540.162.87$330
Jul 2015010148.152.95$297
Jun 201509256.152.88$265
May 201509755.212.96$287
Apr 201509549.822.71$257
Mar 201509542.892.93$279
Feb 201508544.662.98$253
Jan 201509743.433.10$301
Dec 201409854.693.59$352
Nov 201409870.464.25$417
Oct 2014010578.303.90$410
Sep 2014010286.164.05$413
Aug 2014010789.394.04$432
Jul 2014010796.564.18$447
Jun 2014011398.164.74$535
May 2014010794.734.73$506
Apr 2014010895.944.81$519
Mar 201406695.895.06$334
Feb 201407897.406.19$483
Jan 201409090.404.86$437
Dec 2013010091.824.35$435
Nov 2013010588.853.74$393
Oct 2013011597.423.78$435
Sep 20130106104.113.72$394
Aug 20130114104.253.52$402
Jul 20130118102.523.72$439
Jun 2013010194.403.93$397
May 201309594.834.15$394
Apr 2013010493.964.28$445
Mar 201309793.623.91$380
Feb 201309291.233.42$315
Jan 2013011591.603.42$393
Dec 2012012386.773.42$421
Nov 2012011986.953.62$431
Oct 2012010089.383.40$340
Sep 2012012594.672.92$365
Aug 2012012992.662.91$375
Jul 2012010585.133.02$317
Jun 2012012479.822.52$312
May 2012013591.612.49$336
Apr 20120133101.652.00$266
Mar 20120132105.052.22$293
Feb 20120105101.102.57$270
Jan 2012011698.092.73$317
Dec 201109896.873.24$317
Nov 201105495.723.31$179
Oct 20110084.983.65$0
Sep 2011012583.623.99$498
Aug 2011016383.404.15$676
Jul 2011014594.144.52$655
Jun 2011013692.904.64$631
May 2011011698.134.40$511
Apr 20110111105.964.33$481
Mar 2011013396.364.06$540
Feb 2011012385.644.18$514
Jan 2011012686.504.59$578
Dec 2010012085.734.35$522
Nov 2010010780.843.80$406
Oct 2010012678.103.51$442
Sep 2010012772.633.98$505
Aug 2010012873.684.42$566
Jul 2010014072.554.74$663
Jun 2010014270.364.91$697
May 2010015171.124.24$640
Apr 2010014581.694.12$598
Mar 2010016578.394.39$724
Feb 2010015873.585.44$860
Jan 2010014274.365.96$847
Dec 2009012671.445.48$691
Nov 2009015074.593.75$563
Oct 2009015172.544.11$621
Sep 2009012565.543.06$383
Aug 200909467.423.22$303
Jul 2009010861.133.46$374
Jun 2009011566.163.90$448
May 2009011554.743.93$451
Apr 2009012746.773.59$456
Mar 2009013842.144.06$560
Feb 2009012932.814.63$598
Jan 2009014435.865.37$773
Dec 2008014037.105.98$837
Nov 2008014455.496.86$988
Oct 2008014975.246.92$1,031
Sep 20080136101.767.88$1,071
Aug 20080136114.228.48$1,154
Jul 20080144131.0811.39$1,640
Jun 20080149131.3313.03$1,942
May 20080156123.1711.57$1,806
Apr 20080151110.3110.45$1,579
Mar 20080158101.909.66$1,527
Feb 2008015192.538.77$1,324
Jan 2008015390.388.21$1,255
Dec 200708288.337.30$599
Nov 2007014891.677.29$1,079
Oct 2007019682.856.92$1,357
Sep 2007019375.846.24$1,205
Aug 2007019169.066.39$1,220
Jul 2007019470.906.39$1,239
Jun 2007018762.007.55$1,412
May 2007019358.747.85$1,514
Apr 2007018559.617.81$1,444
Mar 2007019056.927.30$1,387
Feb 2007016955.108.22$1,389
Jan 2007017950.306.73$1,204
Dec 2006017956.656.92$1,238
Nov 2006017454.207.62$1,325
Oct 2006017554.906.01$1,052
Sep 2006017660.085.04$887
Aug 2006017168.717.34$1,255
Jul 2006016769.376.34$1,059
Jun 2006016366.286.38$1,041
May 2006015966.016.42$1,022
Apr 2006015564.397.36$1,141
Mar 2006015556.707.08$1,098
Feb 2006012957.597.75$1,000
Jan 2006012060.598.93$1,072
Dec 2005012054.9413.42$1,610
Nov 2005012754.6910.59$1,345
Oct 2005015758.3413.80$2,166
Sep 2005026561.4512.08$3,201
Aug 2005045761.519.80$4,477
Jul 2005050355.697.84$3,945
Jun 2005049052.337.38$3,617
May 2005044045.226.65$2,927
Apr 2005074149.207.36$5,454
Mar 2005077350.377.15$5,531
Feb 2005051145.226.31$3,225
Jan 2005083043.166.32$5,247
Dec 2004071939.866.75$4,854
Nov 2004082845.286.33$5,242
Oct 2004087749.706.52$5,714
Sep 2004094643.245.28$4,999
Aug 2004089642.375.55$4,973
Jul 200401,14238.286.08$6,948
Jun 200401,03036.106.43$6,626
May 2004086937.486.49$5,644
Apr 2004048434.475.86$2,835
Mar 2004085734.365.53$4,739
Feb 2004072432.455.51$3,989
Jan 2004080832.036.30$5,090
Dec 2003089130.266.30$5,615
Nov 2003056128.804.60$2,578
Oct 2003045828.174.76$2,180
Sep 2003069226.314.75$3,287
Aug 2003071229.765.13$3,652
Jul 2003070029.415.17$3,620
Jun 2003060828.565.98$3,638
May 2003028826.595.97$1,720
Apr 2003034626.675.41$1,871
Mar 2003050831.146.10$3,097
Feb 2003046133.487.93$3,654
Jan 2003028630.315.58$1,596
Dec 2002046226.914.85$2,242
Nov 2002038224.664.14$1,580
Oct 2002059526.464.23$2,516
Sep 2002056327.443.64$2,047
Aug 2002054225.963.16$1,715
Jul 2002053924.583.06$1,650
Jun 2002064723.733.34$2,160
May 200201,26124.663.58$4,519
Apr 2002076023.653.51$2,669
Mar 2002062322.003.10$1,933
Feb 2002072018.222.38$1,710
Jan 2002067217.172.38$1,596
Dec 20014423716.932.36$1,305
Nov 2001034218.072.41$823
Oct 2001046319.782.53$1,171
Sep 2001052024.262.25$1,171
Aug 2001077524.873.05$2,366
Jul 200191,02423.933.20$3,489
Jun 2001081724.563.82$3,124
May 200105225.524.31$224
Apr 2001015924.685.34$848
Mar 2001020724.545.38$1,113
Feb 2001012327.755.77$709
Jan 2001110227.478.40$884
Dec 2000025826.889.12$2,354
Nov 2000440432.215.66$2,415
Oct 2000059431.235.15$3,056
Sep 2000069831.875.19$3,620
Aug 2000072929.644.54$3,310
Jul 2000072028.534.09$2,945
Jun 2000079629.304.40$3,500
May 200001,00027.263.68$3,680
Apr 2000032124.513.12$1,000
Mar 2000061828.422.86$1,767
Feb 2000073127.622.73$1,993
Jan 2000084725.272.48$2,101
Dec 1999188024.282.42$2,157
Nov 1999087123.192.43$2,120
Oct 1999073820.982.80$2,069
Sep 1999055021.752.62$1,440
Aug 1999115819.262.88$474
Jul 1999072517.892.37$1,720
Jun 199901,00715.942.36$2,379
May 199911,20915.792.32$2,822
Apr 199901,44615.102.21$3,193
Mar 199901,83412.471.84$3,372
Feb 199902,4949.981.82$4,534
Jan 1999054410.381.90$1,034
Dec 199804799.201.77$849
Nov 1998038410.892.19$839
Oct 19981665212.421.97$1,483
Sep 1998092112.592.08$1,918
Aug 199811,04311.301.91$2,001
Jul 1998057711.742.24$1,291
Jun 199811,32511.242.24$2,976
May 1998164412.622.21$1,434
Apr 1998059113.042.51$1,481
Mar 199811,26112.802.31$2,925
Feb 199801,34113.952.30$3,083
Jan 199801,48114.702.15$3,191
Dec 1997043516.322.41$1,049
Nov 1997057818.193.09$1,785
Oct 199701,44719.253.15$4,558
Sep 199701,09917.742.95$3,247
Aug 199711,36417.862.55$3,503
Jul 199701,43417.582.25$3,222
Jun 199701,67817.242.26$3,788
May 199701,71118.972.31$3,950
Apr 199701,18117.882.08$2,460
Mar 199701,48718.951.94$2,884
Feb 199701,97120.492.21$4,348
Jan 1997077023.483.54$2,726
Dec 199601,09923.32$0
Nov 199601,07821.97$0
Oct 199611,20923.31$23
Sep 199621,53522.22$44
Aug 199611,71020.26$20
Jul 199601,54219.55$0
Jun 199601,48518.73$0
May 199601,55319.43$0
Apr 199601,66621.51$0
Mar 199601,65819.38$0
Feb 199611,90416.98$17
Jan 199622,27817.07$34
Dec 199501,86617.19$0
Nov 199522,32816.00$32
Oct 199511,69115.43$15
Sep 199502,44616.18$0
Aug 199512,44715.92$16
Jul 199502,36015.24$0
Jun 199501,78816.41$0
May 199501,53217.56$0
Apr 199511,87217.73$18
Mar 199512,50616.44$16
Feb 199522,45316.58$33
Jan 199522,64415.92$32
Dec 199412,60615.03$15
Nov 199412,33715.90$16
Oct 199412,89715.58$16
Sep 199412,47715.29$15
Aug 199402,75316.13$0
Jul 199423,23017.56$35
Jun 199402,89217.09$0
May 199403,16915.88$0
Apr 19941533,48214.14$2,163
Mar 199463,75512.46$75
Feb 199413,49312.50$13
Jan 199413,35612.66$13
Dec 199314,15112.33$12
Nov 199324,56014.49$29
Oct 199321,73315.85$32
Sep 199372,26515.03$105
Aug 199374,44815.66$110
Jul 199313,98915.46$15
Jun 199314,22116.79$17
May 199315,61917.68$18
Apr 199325,22418.05$36
Mar 1993215,04918.14$381
Feb 199315,51817.90$18
Jan 199326,05716.93$34

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  158 Mcf  × $  3.05 =       $481

────────────────────────────────────────────────────
Month total                                     $481

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/139011 is the state's own key, not one this site invented.