HELBING "17"

Operated by DEVON ENERGY PRODUCTION CO, L.P. (P-5 216378) in the OZONA, NE. (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 140232District 7CField 679980752 tax incentive programmesCondensateGasSaveExport
Value, all time
$419 k
Jan 1993 – Jul 2003
Value, last 12 filed months
$38 k
at the published price for each month
Months reported
127
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 800 leases and 804 wells, and the rule below applies to all of them.

Discovered
1995-10-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1997-02-27.

The Commission's schedule remark for this field reads: 38. DOCKET 7C-0214353 EFF 2/27/97 SIGNED 2/4/97

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111992-07-11125598
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,801 bbl$30,943
GasProduction278,404 Mcf$387,691
Total$418,634

150,632 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6349, -101.2565. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.63486, -101.25646 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,700 ft.

Completions filed
Feb 2003
1 of 1 wells

1 well

42-1053598436,700 ftFeb 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (127)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

127 months

Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20032033.487.93$67
Jan 200361,32930.315.58$7,600
Dec 200231,77226.914.85$8,682
Nov 200251,59124.664.14$6,705
Oct 200241,24726.464.23$5,380
Sep 200201,37027.443.64$4,980
Aug 200201,40325.963.16$4,439
Jul 200201,33624.583.06$4,091
Jun 2002111,17723.733.34$4,190
May 200201,26324.663.58$4,527
Apr 200201,56923.653.51$5,511
Mar 2002311,86022.003.10$6,453
Feb 200261,41618.222.38$3,473
Jan 2002131,70217.172.38$4,267
Dec 200151,66116.932.36$4,012
Nov 200101,11418.072.41$2,680
Oct 200101,18419.782.53$2,994
Sep 200101,16724.262.25$2,627
Aug 200101,43524.873.05$4,381
Jul 200101,30723.933.20$4,179
Jun 200101,12224.563.82$4,291
May 200101,41425.524.31$6,091
Apr 200101,56124.685.34$8,328
Mar 200101,58224.545.38$8,506
Feb 200101,38927.755.77$8,010
Jan 200101,26027.478.40$10,582
Dec 200001,30226.889.12$11,878
Nov 200001,57532.215.66$8,911
Oct 200001,13031.235.15$5,814
Sep 200001,05731.875.19$5,482
Aug 200001,27529.644.54$5,789
Jul 200001,36028.534.09$5,562
Jun 200001,25229.304.40$5,505
May 200001,17827.263.68$4,335
Apr 200001,44324.513.12$4,496
Mar 200002,62728.422.86$7,513
Feb 200001,71427.622.73$4,673
Jan 200001,85025.272.48$4,589
Dec 199901,82224.282.42$4,416
Nov 199901,80123.192.43$4,384
Oct 199901,29020.982.80$3,617
Sep 199901,44221.752.62$3,776
Aug 199901,67119.262.88$4,805
Jul 199901,76817.892.37$4,194
Jun 199901,39415.942.36$3,293
May 199901,92215.792.32$4,461
Apr 199901,68615.102.21$3,723
Mar 199901,79112.471.84$3,292
Feb 199901,8179.981.82$3,303
Jan 199901,84610.381.90$3,507
Dec 199801,6899.201.77$2,995
Nov 199801,34410.892.19$2,938
Oct 199801,45212.421.97$2,859
Sep 199801,48112.592.08$3,084
Aug 199801,84511.301.91$3,519
Jul 199841,89311.742.24$4,282
Jun 199802,02011.242.24$4,519
May 199881,87412.622.21$4,236
Apr 199882,05713.042.51$5,258
Mar 1998262,34612.802.31$5,751
Feb 1998181,99513.952.30$4,838
Jan 1998162,33314.702.15$5,262
Dec 1997242,42316.322.41$6,234
Nov 1997262,40718.193.09$7,906
Oct 1997162,34119.253.15$7,682
Sep 1997172,24217.742.95$6,926
Aug 199782,21017.862.55$5,789
Jul 1997162,46517.582.25$5,820
Jun 199782,42517.242.26$5,612
May 199782,42118.972.31$5,741
Apr 1997162,70517.882.08$5,920
Mar 199783,12418.951.94$6,209
Feb 1997323,56820.492.21$8,526
Jan 1997263,86823.483.54$14,302
Dec 1996271,08623.32$630
Nov 1996311,84321.97$681
Oct 1996323,19623.31$746
Sep 1996202,56622.22$444
Aug 1996291,63020.26$588
Jul 1996134,21819.55$254
Jun 1996424,53218.73$787
May 1996444,69619.43$855
Apr 1996294,70621.51$624
Mar 199665,22419.38$116
Feb 1996283,52416.98$475
Jan 1996493,17617.07$836
Dec 1995444,71417.19$756
Nov 1995385,01016.00$608
Oct 1995335,50015.43$509
Sep 1995212016.18$32
Aug 1995387815.92$48
Jul 1995171,04015.24$259
Jun 199591,07216.41$148
May 199525,22217.56$35
Apr 199545,81817.73$71
Mar 199562,77416.44$99
Feb 199520016.58$332
Jan 1995122,22215.92$191
Dec 1994552,59015.03$827
Nov 1994422,81715.90$668
Oct 1994443,34215.58$686
Sep 1994582,62115.29$887
Aug 1994322,90416.13$516
Jul 1994383,66017.56$667
Jun 1994153,53517.09$256
May 1994283,42715.88$445
Apr 1994233,14814.14$325
Mar 1994453,43512.46$561
Feb 1994403,19212.50$500
Jan 1994393,65512.66$494
Dec 1993182,05712.33$222
Nov 1993262,41814.49$377
Oct 1993102,58815.85$159
Sep 1993483,00515.03$721
Aug 1993452,61915.66$705
Jul 1993363,17615.46$557
Jun 1993584,12716.79$974
May 1993572,72917.68$1,008
Apr 1993753,27818.05$1,354
Mar 1993293,70718.14$526
Feb 1993143,48817.90$251
Jan 1993154,34716.93$254

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2003 — as filed, then multipliedworked
Condensate             2 bbl  × $ 33.48 =        $67
Gas                    0 Mcf  × $  7.93 =         $0

────────────────────────────────────────────────────
Month total                                      $67

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/140232 is the state's own key, not one this site invented.