HELBING "D"

Operated by EXTEX OPERATING COMPANY (P-5 257062) in the OZONA, NE. (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 144151District 7CField 679980752 tax incentive programmesCondensateGasSaveExport
Value, all time
$475 k
Jan 1993 – May 2026
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 800 leases and 804 wells, and the rule below applies to all of them.

Discovered
1995-10-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1997-02-27.

The Commission's schedule remark for this field reads: 38. DOCKET 7C-0214353 EFF 2/27/97 SIGNED 2/4/97

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111993-05-28126589
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,975 bbl$68,551
GasProduction150,197 Mcf$406,476
Total$475,028

42,573 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6308, -101.2385. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.63078, -101.23847 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,750 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,750 ft.

Completions filed
Nov 1992
1 of 1 wells

1 well

42-1053621386,750 ftNov 1992

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202606106.413.05$18
Apr 20260098.932.87$0
Mar 202603189.753.15$98
Feb 2026027163.503.75$1,016
Jan 2026033059.138.00$2,639
Dec 2025046856.664.41$2,065
Nov 202502958.593.93$114
Oct 202513959.383.30$802
Sep 2025027862.743.08$855
Aug 2025028663.933.01$862
Jul 2025029266.743.32$968
Jun 2025029266.483.13$914
May 2025029960.553.23$966
Apr 2025029362.363.54$1,038
Mar 2025029667.704.27$1,263
Feb 20251528770.884.34$2,309
Jan 2025037474.324.28$1,600
Dec 2024046068.993.12$1,436
Nov 202405269.052.20$114
Oct 2024044171.372.28$1,006
Sep 2024013569.612.36$319
Aug 202402475.632.06$50
Jul 2024010079.932.15$215
Jun 202407978.082.63$208
May 2024216478.812.20$1,796
Apr 202408184.451.66$134
Mar 2024027680.301.55$426
Feb 2024024776.091.78$441
Jan 2024021873.023.30$719
Dec 2023027771.262.61$723
Nov 2023025677.892.81$719
Oct 2023025585.443.09$787
Sep 2023026489.042.74$722
Aug 2023028180.522.67$751
Jul 2023045174.852.64$1,191
Jun 2023027568.962.26$621
May 2023029970.622.23$666
Apr 2023019878.122.24$443
Mar 2023021072.852.39$503
Feb 2023018775.112.47$461
Jan 2023018576.533.39$627
Dec 2022020876.415.73$1,192
Nov 202207985.005.65$446
Oct 202209787.185.86$569
Sep 2022024984.888.16$2,033
Aug 2022026494.529.13$2,410
Jul 20220250101.587.54$1,886
Jun 20220281115.097.98$2,242
May 20220260109.378.43$2,193
Apr 20220190104.226.84$1,299
Mar 20220249108.885.08$1,264
Feb 2022023291.054.86$1,127
Jan 2022037681.844.54$1,706
Dec 2021029571.323.90$1,150
Nov 2021030977.435.24$1,618
Oct 2021031779.795.71$1,811
Sep 202107169.865.35$380
Aug 2021019566.024.22$823
Jul 2021020070.783.98$796
Jun 2021025069.493.38$845
May 2021024263.483.02$730
Apr 2021031060.362.76$855
Mar 2021034561.302.72$937
Feb 2021025557.805.55$1,415
Jan 2021039450.412.81$1,107
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 2020021236.972.48$525
Sep 2020036937.091.99$735
Aug 2020038039.982.39$906
Jul 2020048838.371.83$891
Jun 2020043634.901.69$737
May 202006216.921.81$113
Apr 202008114.751.80$146
Mar 202003030.341.86$56
Feb 2020032449.881.98$642
Jan 2020035957.252.09$752
Dec 2019034559.012.30$795
Nov 2019036055.302.75$990
Oct 2019041553.472.42$1,004
Sep 2019927655.052.66$1,229
Aug 201906553.112.30$150
Jul 2019334856.272.46$1,975
Jun 2019028652.782.49$712
May 2019028458.482.74$778
Apr 201902562.632.75$69
Mar 2019036956.803.06$1,130
Feb 2019018050.852.79$503
Jan 2019023346.033.23$752
Dec 2018019746.594.19$825
Nov 2018217352.934.24$839
Oct 2018028961.443.40$982
Sep 2018022059.543.11$684
Aug 2018028759.403.07$880
Jul 2018018265.142.93$534
Jun 2018023360.183.08$717
May 20183529565.382.90$3,144
Apr 2018035763.842.90$1,036
Mar 2018036461.222.79$1,014
Feb 2018035561.782.77$982
Jan 2018036262.874.01$1,451
Dec 2017032757.272.92$955
Nov 2017050455.423.12$1,572
Oct 2017037849.292.98$1,128
Sep 2017034347.523.09$1,059
Aug 2017049845.373.00$1,496
Jul 20173843743.873.09$3,016
Jun 2017047842.493.09$1,476
May 2017140545.373.26$1,367
Apr 2017036047.933.21$1,156
Mar 2017030646.772.98$913
Feb 2017023850.452.95$703
Jan 2017035849.413.42$1,224
Dec 20163332548.763.72$2,819
Nov 2016030742.492.64$812
Oct 2016035746.193.09$1,103
Sep 2016033441.553.10$1,036
Aug 2016051641.442.92$1,509
Jul 2016026041.622.92$760
Jun 2016041745.352.69$1,120
May 2016031542.521.99$627
Apr 20161430736.561.99$1,123
Mar 2016041833.011.79$750
Feb 2016030126.472.06$621
Jan 2016018527.352.36$437
Dec 2015021732.362.00$434
Nov 2015023538.792.17$509
Oct 2015031443.552.43$762
Sep 2015023442.992.76$645
Aug 2015029040.162.87$833
Jul 201512531248.152.95$6,938
Jun 2015019356.152.88$556
May 2015015855.212.96$467
Apr 2015039349.822.71$1,064
Mar 2015029842.892.93$875
Feb 2015033344.662.98$991
Jan 2015032443.433.10$1,005
Dec 2014031954.693.59$1,146
Nov 2014027670.464.25$1,174
Oct 2014032378.303.90$1,260
Sep 2014035086.164.05$1,416
Aug 20142925089.394.04$3,601
Jul 2014028496.564.18$1,187
Jun 2014020198.164.74$952
May 2014032094.734.73$1,513
Apr 2014060195.944.81$2,890
Mar 2014087695.895.06$4,430
Feb 2014077697.406.19$4,805
Jan 2014082790.404.86$4,020
Dec 20132694091.824.35$6,481
Nov 2013084988.853.74$3,174
Oct 2013066897.423.78$2,525
Sep 2013211,128104.113.72$6,380
Aug 20130937104.253.52$3,301
Jul 20130780102.523.72$2,900
Jun 201301,22694.403.93$4,822
May 2013075194.834.15$3,116
Apr 2013069693.964.28$2,981
Mar 20130093.623.91$0
Feb 2013059991.233.42$2,049
Jan 2013085991.603.42$2,938
Dec 2012086086.773.42$2,941
Nov 2012062586.953.62$2,266
Oct 2012081289.383.40$2,761
Sep 2012092594.672.92$2,700
Aug 2012092192.662.91$2,678
Jul 2012082685.133.02$2,495
Jun 2012072379.822.52$1,821
May 201201,21591.612.49$3,023
Apr 20120880101.652.00$1,757
Mar 201201,712105.052.22$3,804
Feb 201201,143101.102.57$2,938
Jan 2012547498.092.73$1,786
Dec 2011076496.873.24$2,475
Nov 201101,11195.723.31$3,679
Oct 201101,12584.983.65$4,105
Sep 201101,39683.623.99$5,564
Aug 2011056483.404.15$2,340
Jul 201101,58294.144.52$7,146
Jun 201101,13092.904.64$5,243
May 201101,62498.134.40$7,153
Apr 20110808105.964.33$3,501
Mar 2011088396.364.06$3,583
Feb 201101,07185.644.18$4,477
Jan 201101,23986.504.59$5,686
Dec 2010063485.734.35$2,756
Nov 201001,64780.843.80$6,251
Oct 2010080678.103.51$2,828
Sep 2010092272.633.98$3,669
Aug 2010096773.684.42$4,274
Jul 2010063572.554.74$3,008
Jun 201001,28370.364.91$6,300
May 201002,24171.124.24$9,491
Apr 2010071281.694.12$2,935
Mar 2010062178.394.39$2,725
Feb 2010065873.585.44$3,581
Jan 2010046374.365.96$2,761
Dec 200902671.445.48$143
Nov 200903374.593.75$124
Oct 20090972.544.11$37
Sep 20090465.543.06$12
Aug 20090367.423.22$10
Jul 20090261.133.46$7
Jun 20090766.163.90$27
May 200902554.743.93$98
Apr 200903046.773.59$108
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090435.865.37$21
Dec 20080637.105.98$36
Nov 20087055.496.86$388
Oct 20080075.246.92$0
Sep 200803101.767.88$24
Aug 2008023114.228.48$195
Jul 2008026131.0811.39$296
Jun 2008011131.3313.03$143
May 2008018123.1711.57$208
Apr 2008027110.3110.45$282
Mar 2008011101.909.66$106
Feb 200802792.538.77$237
Jan 200801990.388.21$156
Dec 200702588.337.30$183
Nov 200702891.677.29$204
Oct 2007010082.856.92$692
Sep 200709375.846.24$581
Aug 2007013369.066.39$850
Jul 2007014570.906.39$926
Jun 200709462.007.55$710
May 200709558.747.85$745
Apr 200703859.617.81$297
Mar 200708956.927.30$650
Feb 200708055.108.22$657
Jan 200709350.306.73$626
Dec 200607556.656.92$519
Nov 200604554.207.62$343
Oct 200607754.906.01$463
Sep 200607160.085.04$358
Aug 2006010468.717.34$763
Jul 200608569.376.34$539
Jun 200605166.286.38$326
May 200608966.016.42$572
Apr 2006011364.397.36$832
Mar 2006010156.707.08$715
Feb 2006014957.597.75$1,155
Jan 200605160.598.93$456
Dec 200505054.9413.42$671
Nov 200506854.6910.59$720
Oct 200504658.3413.80$635
Sep 200504361.4512.08$519
Aug 200509861.519.80$960
Jul 2005011455.697.84$894
Jun 2005010552.337.38$775
May 2005012045.226.65$798
Apr 2005011049.207.36$810
Mar 2005012050.377.15$859
Feb 2005010545.226.31$663
Jan 2005019943.166.32$1,258
Dec 2004010439.866.75$702
Nov 200409845.286.33$620
Oct 200409849.706.52$638
Sep 200408643.245.28$454
Aug 2004017942.375.55$994
Jul 2004012538.286.08$761
Jun 2004014236.106.43$913
May 2004013737.486.49$890
Apr 2004012034.475.86$703
Mar 200409434.365.53$520
Feb 200409832.455.51$540
Jan 200409932.036.30$624
Dec 2003011330.266.30$712
Nov 2003015028.804.60$689
Oct 2003010628.174.76$505
Sep 2003015526.314.75$736
Aug 2003017929.765.13$918
Jul 2003016329.415.17$843
Jun 2003111428.565.98$711
May 200308126.595.97$484
Apr 200309626.675.41$519
Mar 2003020631.146.10$1,256
Feb 2003020033.487.93$1,585
Jan 2003017130.315.58$955
Dec 2002014526.914.85$704
Nov 2002022624.664.14$935
Oct 2002021726.464.23$918
Sep 20020027.443.64$0
Aug 2002024225.963.16$766
Jul 2002024224.583.06$741
Jun 2002103623.733.34$357
May 2002013024.663.58$466
Apr 2002014923.653.51$523
Mar 2002015922.003.10$493
Feb 20021913818.222.38$674
Jan 2002014517.172.38$344
Dec 2001012816.932.36$303
Nov 20011914718.072.41$697
Oct 2001016719.782.53$422
Sep 2001017324.262.25$389
Aug 20011819424.873.05$1,040
Jul 2001048523.933.20$1,551
Jun 2001027024.563.82$1,033
May 20011830025.524.31$1,752
Apr 2001028424.685.34$1,515
Mar 20011825724.545.38$1,823
Feb 2001023227.755.77$1,338
Jan 2001025427.478.40$2,133
Dec 20001919526.889.12$2,290
Nov 20001928932.215.66$2,247
Oct 2000031731.235.15$1,631
Sep 2000034631.875.19$1,795
Aug 20001439529.644.54$2,209
Jul 200006628.534.09$270
Jun 2000175929.304.40$758
May 200005027.263.68$184
Apr 200004924.513.12$153
Mar 20001812128.422.86$858
Feb 200009227.622.73$251
Jan 2000207825.272.48$699
Dec 199908524.282.42$206
Nov 1999198723.192.43$652
Oct 1999012620.982.80$353
Sep 1999010421.752.62$272
Aug 19991712019.262.88$672
Jul 1999013317.892.37$316
Jun 1999015115.942.36$357
May 19991315315.792.32$560
Apr 1999015115.102.21$333
Mar 19991516312.471.84$487
Feb 199901359.981.82$245
Jan 1999514410.381.90$325
Dec 199801639.201.77$289
Nov 1998020910.892.19$457
Oct 1998021612.421.97$425
Sep 1998020312.592.08$423
Aug 1998027811.301.91$530
Jul 1998027011.742.24$604
Jun 1998026011.242.24$582
May 1998029912.622.21$660
Apr 1998032913.042.51$824
Mar 1998025412.802.31$587
Feb 1998022213.952.30$510
Jan 1998030114.702.15$649
Dec 1997028116.322.41$678
Nov 1997027718.193.09$855
Oct 1997036219.253.15$1,140
Sep 1997023517.742.95$694
Aug 1997019817.862.55$506
Jul 1997022317.582.25$501
Jun 1997020417.242.26$460
May 1997022318.972.31$515
Apr 1997219817.882.08$448
Mar 1997422618.951.94$514
Feb 1997017120.492.21$377
Jan 1997323523.483.54$902
Dec 1996032223.32$0
Nov 1996321221.97$66
Oct 1996537323.31$117
Sep 1996535022.22$111
Aug 1996544120.26$101
Jul 1996044319.55$0
Jun 1996545418.73$94
May 1996535019.43$97
Apr 1996749521.51$151
Mar 1996858419.38$155
Feb 1996039716.98$0
Jan 1996732017.07$119
Dec 1995856017.19$138
Nov 19951145316.00$176
Oct 19952953115.43$447
Sep 1995033516.18$0
Aug 19951143015.92$175
Jul 19951054015.24$152
Jun 1995961916.41$148
May 19951355317.56$228
Apr 19951965017.73$337
Mar 19952145516.44$345
Feb 19952180516.58$348
Jan 19954476615.92$700
Dec 19942572715.03$376
Nov 19944776715.90$747
Oct 19942175715.58$327
Sep 19944285115.29$642
Aug 1994981316.13$145
Jul 1994201,00617.56$351
Jun 19944167617.09$701
May 19941276715.88$191
Apr 1994611,09614.14$863
Mar 1994471,23412.46$586
Feb 199411190012.50$1,388
Jan 19941471,04512.66$1,861
Dec 19931281,11212.33$1,578
Nov 19931341,23014.49$1,942
Oct 199312172015.85$1,918
Sep 19931242,33815.03$1,864
Aug 19931161,33515.66$1,817
Jul 1993551,42415.46$850
Jun 19931911,44716.79$3,207
May 19931251,74617.68$2,210
Apr 19931771,96118.05$3,195
Mar 19932082,24718.14$3,773
Feb 1993522,71217.90$931
Jan 199302,22416.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    6 Mcf  × $  3.05 =        $18

────────────────────────────────────────────────────
Month total                                      $18

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/144151 is the state's own key, not one this site invented.