PIERCE-ARROW

Operated by EXTEX OPERATING COMPANY (P-5 257062) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 146743District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$490 k
Aug 1993 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
394
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111994-04-25129670
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,139 bbl$38,092
GasProduction347,472 Mcf$451,555
Total$489,647

220,733 Mcf of this lease's gas, across 40 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3897, -101.3581. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.38966, -101.35810 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,510 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,510 ft.

Completions filed
Aug 1993
1 of 1 wells

1 well

42-1053639345026,510 ftAug 1993

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (394)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

394 months

May 202602106.413.05$6
Apr 20260198.932.87$3
Mar 20260089.753.15$0
Feb 202601963.503.75$71
Jan 202602759.138.00$216
Dec 202503656.664.41$159
Nov 202501158.593.93$43
Oct 202503359.383.30$109
Sep 202502262.743.08$68
Aug 202507763.933.01$232
Jul 202508866.743.32$292
Jun 202501866.483.13$56
May 202518160.553.23$322
Apr 202508762.363.54$308
Mar 202505767.704.27$243
Feb 202507270.884.34$313
Jan 202507274.324.28$308
Dec 202409768.993.12$303
Nov 202402269.052.20$48
Oct 202402971.372.28$66
Sep 202404269.612.36$99
Aug 20240475.632.06$8
Jul 202402479.932.15$52
Jun 20240778.082.63$18
May 202405078.812.20$110
Apr 20240084.451.66$0
Mar 202408680.301.55$133
Feb 202408176.091.78$144
Jan 202406973.023.30$228
Dec 202308271.262.61$214
Nov 202308477.892.81$236
Oct 202307585.443.09$232
Sep 202308989.042.74$243
Aug 202309580.522.67$254
Jul 202328774.852.64$380
Jun 202348568.962.26$468
May 202328670.622.23$333
Apr 202368078.122.24$648
Mar 202348372.852.39$490
Feb 202328875.112.47$367
Jan 202337876.533.39$494
Dec 202228276.415.73$623
Nov 202229785.005.65$718
Oct 202228587.185.86$673
Sep 202228084.888.16$823
Aug 202228794.529.13$983
Jul 20222105101.587.54$995
Jun 20222100115.097.98$1,028
May 20222105109.378.43$1,104
Apr 20226107104.226.84$1,357
Mar 20220106108.885.08$538
Feb 202207391.054.86$355
Jan 2022215281.844.54$853
Dec 2021011171.323.90$433
Nov 2021211377.435.24$747
Oct 202109979.795.71$566
Sep 202148769.865.35$745
Aug 2021013066.024.22$549
Jul 2021010270.783.98$406
Jun 202108069.493.38$270
May 2021011763.483.02$353
Apr 2021011560.362.76$317
Mar 2021212961.302.72$473
Feb 202108357.805.55$460
Jan 2021012350.412.81$346
Dec 2020012644.642.68$337
Nov 2020012838.772.71$346
Oct 2020011236.972.48$278
Sep 202007837.091.99$155
Aug 202006339.982.39$150
Jul 202007238.371.83$131
Jun 202005134.901.69$86
May 202003316.921.81$60
Apr 20200214.751.80$4
Mar 20200630.341.86$11
Feb 202006349.881.98$125
Jan 202005657.252.09$117
Dec 201908459.012.30$194
Nov 201907555.302.75$206
Oct 201907153.472.42$172
Sep 201906555.052.66$173
Aug 201903753.112.30$85
Jul 20190056.272.46$0
Jun 201904952.782.49$122
May 201904458.482.74$121
Apr 201901562.632.75$41
Mar 201905956.803.06$181
Feb 201906650.852.79$184
Jan 201908746.033.23$281
Dec 201809146.594.19$381
Nov 201806052.934.24$254
Oct 201807361.443.40$248
Sep 201808359.543.11$258
Aug 201809859.403.07$301
Jul 201808165.142.93$237
Jun 201804360.183.08$132
May 201804665.382.90$133
Apr 20180863.842.90$23
Mar 201802961.222.79$81
Feb 201805361.782.77$147
Jan 201801362.874.01$52
Dec 20170257.272.92$6
Nov 20170355.423.12$9
Oct 201704949.292.98$146
Sep 201707047.523.09$216
Aug 201706745.373.00$201
Jul 201707843.873.09$241
Jun 201704042.493.09$123
May 201704345.373.26$140
Apr 201704947.933.21$157
Mar 201705346.772.98$158
Feb 201706150.452.95$180
Jan 201707649.413.42$260
Dec 201606748.763.72$249
Nov 201605142.492.64$135
Oct 201602046.193.09$62
Sep 201602341.553.10$71
Aug 201606441.442.92$187
Jul 201606541.622.92$190
Jun 201606545.352.69$175
May 201606142.521.99$121
Apr 201604036.561.99$80
Mar 201602433.011.79$43
Feb 201602926.472.06$60
Jan 201602827.352.36$66
Dec 201503332.362.00$66
Nov 201502938.792.17$63
Oct 201506543.552.43$158
Sep 201508942.992.76$246
Aug 201506640.162.87$190
Jul 201506448.152.95$188
Jun 201506956.152.88$199
May 201506355.212.96$186
Apr 201505949.822.71$160
Mar 201508442.892.93$247
Feb 201507144.662.98$211
Jan 201507843.433.10$242
Dec 201406954.693.59$248
Nov 201407270.464.25$306
Oct 201405878.303.90$226
Sep 201404286.164.05$170
Aug 201402589.394.04$101
Jul 201405596.564.18$230
Jun 201404798.164.74$223
May 201409094.734.73$425
Apr 2014011395.944.81$543
Mar 201409695.895.06$485
Feb 201403597.406.19$217
Jan 201403090.404.86$146
Dec 201305091.824.35$218
Nov 201301288.853.74$45
Oct 201304397.423.78$163
Sep 2013035104.113.72$130
Aug 2013066104.253.52$232
Jul 2013024102.523.72$89
Jun 201305294.403.93$205
May 201306394.834.15$261
Apr 2013038193.964.28$1,632
Mar 2013045393.623.91$1,773
Feb 20130091.233.42$0
Jan 2013011191.603.42$380
Dec 2012012086.773.42$410
Nov 201209586.953.62$344
Oct 201209789.383.40$330
Sep 2012013094.672.92$379
Aug 201208592.662.91$247
Jul 201208185.133.02$245
Jun 2012012979.822.52$325
May 2012020791.612.49$515
Apr 20120126101.652.00$252
Mar 20128177105.052.22$1,234
Feb 20120144101.102.57$370
Jan 2012016198.092.73$440
Dec 2011010496.873.24$337
Nov 201106795.723.31$222
Oct 20110084.983.65$0
Sep 201102583.623.99$100
Aug 20110083.404.15$0
Jul 201101294.144.52$54
Jun 201107392.904.64$339
May 201105298.134.40$229
Apr 20110129105.964.33$559
Mar 201108796.364.06$353
Feb 2011010085.644.18$418
Jan 201109486.504.59$431
Dec 201007685.734.35$330
Nov 201006880.843.80$258
Oct 201005178.103.51$179
Sep 201006472.633.98$255
Aug 2010010973.684.42$482
Jul 201009672.554.74$455
Jun 201009070.364.91$442
May 201006371.124.24$267
Apr 201003981.694.12$161
Mar 201004778.394.39$206
Feb 201007673.585.44$414
Jan 2010010074.365.96$596
Dec 2009012071.445.48$658
Nov 200906274.593.75$233
Oct 200909472.544.11$386
Sep 2009013765.543.06$420
Aug 2009012967.423.22$415
Jul 2009013561.133.46$468
Jun 2009010566.163.90$409
May 2009011854.743.93$463
Apr 2009016346.773.59$585
Mar 2009010842.144.06$438
Feb 2009011332.814.63$524
Jan 2009013835.865.37$741
Dec 2008013137.105.98$783
Nov 2008014355.496.86$981
Oct 200808075.246.92$554
Sep 2008087101.767.88$685
Aug 20080104114.228.48$882
Jul 20080100131.0811.39$1,139
Jun 20080158131.3313.03$2,059
May 20080165123.1711.57$1,910
Apr 20080141110.3110.45$1,474
Mar 20080136101.909.66$1,314
Feb 200809792.538.77$851
Jan 2008010090.388.21$821
Dec 200707888.337.30$570
Nov 200708791.677.29$634
Oct 2007011882.856.92$817
Sep 200708675.846.24$537
Aug 2007016869.066.39$1,073
Jul 2007014470.906.39$920
Jun 2007015362.007.55$1,155
May 2007014858.747.85$1,161
Apr 2007014359.617.81$1,116
Mar 2007015956.927.30$1,161
Feb 2007014655.108.22$1,200
Jan 2007012150.306.73$814
Dec 2006014956.656.92$1,031
Nov 2006017054.207.62$1,295
Oct 2006018254.906.01$1,095
Sep 2006022260.085.04$1,118
Aug 2006021668.717.34$1,585
Jul 2006023669.376.34$1,497
Jun 2006020366.286.38$1,296
May 2006018066.016.42$1,157
Apr 2006014764.397.36$1,082
Mar 2006015456.707.08$1,091
Feb 2006015457.597.75$1,194
Jan 2006024160.598.93$2,153
Dec 2005017354.9413.42$2,321
Nov 2005023554.6910.59$2,488
Oct 2005025858.3413.80$3,559
Sep 2005025561.4512.08$3,080
Aug 2005031261.519.80$3,057
Jul 2005029255.697.84$2,290
Jun 2005031752.337.38$2,340
May 2005024945.226.65$1,656
Apr 2005020049.207.36$1,472
Mar 2005021850.377.15$1,560
Feb 2005015345.226.31$966
Jan 2005025243.166.32$1,593
Dec 2004016039.866.75$1,080
Nov 2004020845.286.33$1,317
Oct 2004030849.706.52$2,007
Sep 2004030343.245.28$1,601
Aug 2004032942.375.55$1,826
Jul 2004034538.286.08$2,099
Jun 2004034136.106.43$2,194
May 2004038237.486.49$2,481
Apr 2004035834.475.86$2,097
Mar 2004035734.365.53$1,974
Feb 2004033632.455.51$1,851
Jan 20041140432.036.30$2,897
Dec 2003036530.266.30$2,300
Nov 2003036128.804.60$1,659
Oct 2003043828.174.76$2,085
Sep 2003050626.314.75$2,403
Aug 2003052729.765.13$2,703
Jul 2003154829.415.17$2,863
Jun 2003060128.565.98$3,596
May 2003060826.595.97$3,631
Apr 2003047726.675.41$2,579
Mar 2003065731.146.10$4,005
Feb 2003162533.487.93$4,987
Jan 2003080930.315.58$4,516
Dec 2002083426.914.85$4,048
Nov 2002099624.664.14$4,120
Oct 2002073826.464.23$3,121
Sep 2002076827.443.64$2,792
Aug 2002052625.963.16$1,664
Jul 2002043824.583.06$1,341
Jun 2002059923.733.34$2,000
May 2002072024.663.58$2,580
Apr 2002083923.653.51$2,947
Mar 2002086322.003.10$2,678
Feb 2002071818.222.38$1,706
Jan 200201,17217.172.38$2,784
Dec 200114016.932.36$237
Nov 2001390418.072.41$2,229
Oct 2001095219.782.53$2,407
Sep 2001098324.262.25$2,213
Aug 2001094524.873.05$2,885
Jul 200101,01923.933.20$3,258
Jun 2001097824.563.82$3,740
May 2001078225.524.31$3,368
Apr 2001071324.685.34$3,804
Mar 2001072524.545.38$3,898
Feb 2001069027.755.77$3,979
Jan 2001090227.478.40$7,576
Dec 20001380226.889.12$7,666
Nov 2000063832.215.66$3,610
Oct 2000084931.235.15$4,369
Sep 2000076031.875.19$3,942
Aug 2000099829.644.54$4,532
Jul 200001,00728.534.09$4,118
Jun 200001,00729.304.40$4,428
May 200001,10027.263.68$4,048
Apr 200001,11924.513.12$3,487
Mar 2000141,09828.422.86$3,538
Feb 2000098227.622.73$2,677
Jan 200001,19325.272.48$2,959
Dec 199901,18524.282.42$2,872
Nov 199901,15723.192.43$2,816
Oct 1999141,25320.982.80$3,807
Sep 199901,31221.752.62$3,436
Aug 199901,41719.262.88$4,075
Jul 199901,46317.892.37$3,471
Jun 199901,42015.942.36$3,354
May 199901,48615.792.32$3,449
Apr 199901,55515.102.21$3,434
Mar 1999131,47412.471.84$2,872
Feb 199901,1619.981.82$2,110
Jan 1999141,27310.381.90$2,564
Dec 199801,3019.201.77$2,307
Nov 1998261,28410.892.19$3,090
Oct 199801,42112.421.97$2,798
Sep 199801,46412.592.08$3,049
Aug 199801,51111.301.91$2,882
Jul 199801,53211.742.24$3,428
Jun 1998281,61111.242.24$3,919
May 199801,58012.622.21$3,486
Apr 199801,57313.042.51$3,941
Mar 1998291,68412.802.31$4,260
Feb 1998201,74113.952.30$4,282
Jan 1998181,95114.702.15$4,469
Dec 1997182,02616.322.41$5,179
Nov 1997172,02618.193.09$6,566
Oct 1997182,17019.253.15$7,182
Sep 199701,85017.742.95$5,467
Aug 1997172,31017.862.55$6,205
Jul 199702,48317.582.25$5,579
Jun 1997182,54417.242.26$6,053
May 1997182,34318.972.31$5,750
Apr 1997242,43317.882.08$5,497
Mar 199772,55218.951.94$5,081
Feb 199732,30220.492.21$5,139
Jan 199732,69023.483.54$9,592
Dec 199662,53123.32$140
Nov 199632,40321.97$66
Oct 199632,79123.31$70
Sep 199633,02522.22$67
Aug 199632,85420.26$61
Jul 199662,89719.55$117
Jun 199632,89318.73$56
May 199633,00919.43$58
Apr 199632,95521.51$65
Mar 199693,10919.38$174
Feb 199662,81816.98$102
Jan 199663,04617.07$102
Dec 1995113,27817.19$189
Nov 1995103,34316.00$160
Oct 199573,61815.43$108
Sep 199583,64616.18$129
Aug 199593,78515.92$143
Jul 199564,42415.24$91
Jun 1995104,20616.41$164
May 1995124,52817.56$211
Apr 1995274,08017.73$479
Mar 1995344,17716.44$559
Feb 1995344,42116.58$564
Jan 1995485,39315.92$764
Dec 1994325,51915.03$481
Nov 1994685,45415.90$1,081
Oct 19941496,04415.58$2,321
Sep 19941445,28615.29$2,202
Aug 1994985,84416.13$1,581
Jul 19941216,06017.56$2,125
Jun 19941566,29217.09$2,666
May 19941207,25115.88$1,906
Apr 1994487,49914.14$679
Mar 19947028,90712.46$872
Feb 1994759,35512.50$938
Jan 19949410,95412.66$1,190
Dec 19931009,23112.33$1,233
Nov 1993778,40614.49$1,116
Oct 19938210,11315.85$1,300
Sep 199395,28815.03$135
Aug 19930015.66$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    2 Mcf  × $  3.05 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/146743 is the state's own key, not one this site invented.