Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 150419District 7CField 846465002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.1 M
May 1994 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
385
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111995-03-14131682
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition299 bbl$5,559
GasProduction517,838 Mcf$1,064,122
Total$1,069,681

249,165 Mcf of this lease's gas, across 32 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5834, -100.6845. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.58337, -100.68448 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,570 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,570 ft.

Completions filed
Aug 1999
1 of 1 wells

1 well

42-43534249196,570 ftAug 1999

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (385)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

385 months

May 20260351106.413.05$1,069
Apr 2026039998.932.87$1,145
Mar 2026031489.753.15$989
Feb 2026028063.503.75$1,050
Jan 2026030959.138.00$2,471
Dec 2025031056.664.41$1,368
Nov 2025030258.593.93$1,186
Oct 2025031459.383.30$1,038
Sep 2025030662.743.08$942
Aug 2025031863.933.01$959
Jul 2025031466.743.32$1,041
Jun 2025030866.483.13$964
May 2025031860.553.23$1,028
Apr 2025031262.363.54$1,105
Mar 2025032067.704.27$1,366
Feb 2025028670.884.34$1,241
Jan 2025031374.324.28$1,339
Dec 2024032468.993.12$1,011
Nov 2024031369.052.20$688
Oct 2024032671.372.28$744
Sep 2024031669.612.36$747
Aug 2024033075.632.06$681
Jul 2024032979.932.15$706
Jun 2024032478.082.63$853
May 2024035678.812.20$783
Apr 2024030484.451.66$504
Mar 2024033580.301.55$518
Feb 2024031476.091.78$560
Jan 2024032973.023.30$1,085
Dec 2023034271.262.61$893
Nov 2023032077.892.81$898
Oct 2023035785.443.09$1,102
Sep 2023032589.042.74$889
Aug 2023033880.522.67$903
Jul 2023034374.852.64$906
Jun 2023034768.962.26$784
May 2023038470.622.23$855
Apr 2023047478.122.24$1,061
Mar 2023030172.852.39$720
Feb 2023028775.112.47$708
Jan 2023031576.533.39$1,067
Dec 2022026876.415.73$1,535
Nov 2022024785.005.65$1,395
Oct 2022027087.185.86$1,583
Sep 2022026484.888.16$2,155
Aug 2022027894.529.13$2,537
Jul 20220309101.587.54$2,331
Jun 20220274115.097.98$2,186
May 20220305109.378.43$2,572
Apr 20220302104.226.84$2,065
Mar 20220281108.885.08$1,426
Feb 2022023691.054.86$1,147
Jan 2022025381.844.54$1,148
Dec 2021023871.323.90$928
Nov 2021039077.435.24$2,042
Oct 2021010279.795.71$583
Sep 202109869.865.35$524
Aug 2021010266.024.22$431
Jul 2021010670.783.98$422
Jun 2021010869.493.38$365
May 2021012463.483.02$374
Apr 2021018560.362.76$510
Mar 2021020861.302.72$565
Feb 2021019857.805.55$1,098
Jan 2021014450.412.81$405
Dec 2020020644.642.68$551
Nov 2020019538.772.71$528
Oct 2020020536.972.48$508
Sep 2020020637.091.99$410
Aug 2020024539.982.39$584
Jul 2020027638.371.83$504
Jun 2020036234.901.69$612
May 2020031616.921.81$573
Apr 2020030314.751.80$547
Mar 2020035830.341.86$665
Feb 2020052549.881.98$1,040
Jan 2020063057.252.09$1,320
Dec 2019072559.012.30$1,671
Nov 2019084455.302.75$2,322
Oct 2019050553.472.42$1,221
Sep 201904555.052.66$120
Aug 201904753.112.30$108
Jul 201905256.272.46$128
Jun 201906452.782.49$159
May 201902058.482.74$55
Apr 201902462.632.75$66
Mar 201904956.803.06$150
Feb 201905350.852.79$148
Jan 201904146.033.23$132
Dec 201803846.594.19$159
Nov 201804152.934.24$174
Oct 201805361.443.40$180
Sep 201804659.543.11$143
Aug 201803159.403.07$95
Jul 201807965.142.93$232
Jun 2018011860.183.08$363
May 2018015165.382.90$438
Apr 2018012163.842.90$351
Mar 2018021661.222.79$602
Feb 2018021461.782.77$592
Jan 2018023962.874.01$958
Dec 2017028557.272.92$833
Nov 2017023755.423.12$739
Oct 2017023749.292.98$707
Sep 2017025947.523.09$800
Aug 2017024645.373.00$739
Jul 2017023943.873.09$738
Jun 2017024742.493.09$763
May 2017031845.373.26$1,038
Apr 2017026647.933.21$854
Mar 2017032246.772.98$961
Feb 2017027350.452.95$806
Jan 2017029649.413.42$1,012
Dec 2016029548.763.72$1,098
Nov 2016029642.492.64$783
Oct 2016033146.193.09$1,023
Sep 2016029141.553.10$902
Aug 2016032241.442.92$942
Jul 2016033841.622.92$988
Jun 2016026445.352.69$709
May 2016028042.521.99$557
Apr 2016027936.561.99$556
Mar 2016028533.011.79$511
Feb 2016027526.472.06$568
Jan 2016029427.352.36$695
Dec 2015032732.362.00$654
Nov 2015032338.792.17$700
Oct 2015039443.552.43$956
Sep 2015036942.992.76$1,018
Aug 2015038640.162.87$1,109
Jul 2015031048.152.95$913
Jun 2015030856.152.88$888
May 2015027155.212.96$801
Apr 2015028849.822.71$779
Mar 2015033242.892.93$974
Feb 2015029544.662.98$878
Jan 2015029143.433.10$902
Dec 2014030154.693.59$1,081
Nov 2014028770.464.25$1,220
Oct 2014032078.303.90$1,248
Sep 2014038886.164.05$1,570
Aug 2014032689.394.04$1,315
Jul 2014032696.564.18$1,363
Jun 2014030398.164.74$1,435
May 2014039394.734.73$1,858
Apr 2014037495.944.81$1,799
Mar 2014020995.895.06$1,057
Feb 2014022597.406.19$1,393
Jan 2014041090.404.86$1,993
Dec 2013041091.824.35$1,785
Nov 2013037788.853.74$1,409
Oct 2013032697.423.78$1,232
Sep 20130288104.113.72$1,071
Aug 20130336104.253.52$1,184
Jul 20130353102.523.72$1,312
Jun 2013031794.403.93$1,247
May 2013038194.834.15$1,581
Apr 2013042093.964.28$1,799
Mar 2013048193.623.91$1,882
Feb 2013043391.233.42$1,481
Jan 2013045291.603.42$1,546
Dec 2012047186.773.42$1,611
Nov 2012046686.953.62$1,689
Oct 2012047589.383.40$1,615
Sep 2012043694.672.92$1,272
Aug 2012047392.662.91$1,376
Jul 2012047485.133.02$1,432
Jun 2012047079.822.52$1,184
May 2012040291.612.49$1,000
Apr 20120396101.652.00$791
Mar 20120487105.052.22$1,082
Feb 20120473101.102.57$1,216
Jan 2012052798.092.73$1,441
Dec 2011052896.873.24$1,711
Nov 2011052095.723.31$1,722
Oct 2011054784.983.65$1,996
Sep 2011051483.623.99$2,049
Aug 2011053483.404.15$2,216
Jul 2011054894.144.52$2,475
Jun 2011052892.904.64$2,450
May 2011050298.134.40$2,211
Apr 20110608105.964.33$2,635
Mar 2011071596.364.06$2,901
Feb 2011073585.644.18$3,072
Jan 2011066986.504.59$3,070
Dec 2010074485.734.35$3,235
Nov 2010059380.843.80$2,251
Oct 2010030778.103.51$1,077
Sep 2010043272.633.98$1,719
Aug 2010054073.684.42$2,386
Jul 2010055872.554.74$2,643
Jun 2010053570.364.91$2,627
May 2010055771.124.24$2,359
Apr 2010054681.694.12$2,251
Mar 2010056978.394.39$2,497
Feb 2010051373.585.44$2,792
Jan 2010056974.365.96$3,394
Dec 2009057471.445.48$3,148
Nov 2009056474.593.75$2,116
Oct 2009057072.544.11$2,343
Sep 2009054765.543.06$1,676
Aug 2009056667.423.22$1,822
Jul 2009057861.133.46$2,002
Jun 2009056566.163.90$2,201
May 2009059354.743.93$2,328
Apr 2009057946.773.59$2,077
Mar 2009053442.144.06$2,168
Feb 2009050332.814.63$2,330
Jan 2009057535.865.37$3,088
Dec 2008059537.105.98$3,556
Nov 2008057655.496.86$3,952
Oct 2008059475.246.92$4,112
Sep 20080577101.767.88$4,545
Aug 20080598114.228.48$5,073
Jul 20080609131.0811.39$6,936
Jun 20080597131.3313.03$7,780
May 20080627123.1711.57$7,257
Apr 20080613110.3110.45$6,409
Mar 20080637101.909.66$6,156
Feb 2008058692.538.77$5,140
Jan 2008063690.388.21$5,219
Dec 2007064288.337.30$4,688
Nov 2007062491.677.29$4,550
Oct 2007063382.856.92$4,382
Sep 2007064875.846.24$4,046
Aug 2007064269.066.39$4,101
Jul 2007065470.906.39$4,178
Jun 2007062962.007.55$4,748
May 2007064758.747.85$5,077
Apr 2007063559.617.81$4,956
Mar 2007066056.927.30$4,819
Feb 2007059055.108.22$4,847
Jan 2007062650.306.73$4,211
Dec 2006067456.656.92$4,663
Nov 2006064754.207.62$4,929
Oct 2006067954.906.01$4,083
Sep 2006066060.085.04$3,325
Aug 2006061068.717.34$4,477
Jul 2006066669.376.34$4,224
Jun 2006071266.286.38$4,545
May 2006074066.016.42$4,755
Apr 2006066764.397.36$4,909
Mar 2006071156.707.08$5,036
Feb 2006088657.597.75$6,867
Jan 2006093260.598.93$8,326
Dec 2005097254.9413.42$13,040
Nov 2005086754.6910.59$9,180
Oct 2005080958.3413.80$11,161
Sep 2005064061.4512.08$7,731
Aug 2005085261.519.80$8,347
Jul 2005076655.697.84$6,008
Jun 2005065252.337.38$4,812
May 2005067745.226.65$4,503
Apr 2005086049.207.36$6,330
Mar 2005094550.377.15$6,761
Feb 2005091245.226.31$5,756
Jan 2005469843.166.32$4,586
Dec 2004097339.866.75$6,569
Nov 2004082345.286.33$5,210
Oct 2004080949.706.52$5,271
Sep 2004081043.245.28$4,280
Aug 2004084542.375.55$4,690
Jul 2004081038.286.08$4,928
Jun 2004069636.106.43$4,477
May 2004089337.486.49$5,800
Apr 2004092434.475.86$5,413
Mar 2004097334.365.53$5,381
Feb 200401,09432.455.51$6,028
Jan 200401,16432.036.30$7,333
Dec 200301,02930.266.30$6,484
Nov 2003099828.804.60$4,586
Oct 200301,23328.174.76$5,869
Sep 200301,25426.314.75$5,956
Aug 200301,52729.765.13$7,833
Jul 200301,41429.415.17$7,312
Jun 200301,08228.565.98$6,474
May 2003095026.595.97$5,674
Apr 2003043126.675.41$2,331
Mar 2003049831.146.10$3,036
Feb 2003073233.487.93$5,802
Jan 2003087830.315.58$4,901
Dec 2002069226.914.85$3,359
Nov 2002078024.664.14$3,227
Oct 200201,07126.464.23$4,529
Sep 200201,00327.443.64$3,646
Aug 2002097325.963.16$3,079
Jul 200201,23824.583.06$3,790
Jun 2002471,30123.733.34$5,458
May 200201,08724.663.58$3,896
Apr 2002066023.653.51$2,318
Mar 2002095022.003.10$2,948
Feb 2002070218.222.38$1,668
Jan 2002085917.172.38$2,041
Dec 200101,31016.932.36$3,097
Nov 200101,19518.072.41$2,875
Oct 200101,24119.782.53$3,138
Sep 200101,12324.262.25$2,528
Aug 200101,06624.873.05$3,255
Jul 2001086423.933.20$2,762
Jun 200101,21024.563.82$4,627
May 200121,27325.524.31$5,534
Apr 200121,23224.685.34$6,622
Mar 200101,04424.545.38$5,613
Feb 2001094127.755.77$5,427
Jan 200101,22527.478.40$10,288
Dec 200001,74526.889.12$15,919
Nov 200001,48832.215.66$8,419
Oct 200001,67531.235.15$8,619
Sep 200021,76131.875.19$9,197
Aug 200001,75529.644.54$7,969
Jul 200001,14128.534.09$4,666
Jun 200001,48929.304.40$6,548
May 200011,65327.263.68$6,110
Apr 200001,74524.513.12$5,437
Mar 200001,87528.422.86$5,362
Feb 200001,78227.622.73$4,859
Jan 200001,88025.272.48$4,663
Dec 199902,06124.282.42$4,995
Nov 199911,91823.192.43$4,692
Oct 199901,69320.982.80$4,747
Sep 199901,48121.752.62$3,879
Aug 199901,10719.262.88$3,183
Jul 199901,77717.892.37$4,216
Jun 199901,74715.942.36$4,127
May 199902,17615.792.32$5,051
Apr 199902,57015.102.21$5,675
Mar 199902,40412.471.84$4,419
Feb 199902,1879.981.82$3,976
Jan 199902,41910.381.90$4,596
Dec 199802,5569.201.77$4,533
Nov 199802,45810.892.19$5,373
Oct 199802,61512.421.97$5,149
Sep 199802,47112.592.08$5,146
Aug 199802,63211.301.91$5,020
Jul 199802,61311.742.24$5,846
Jun 199802,62711.242.24$5,877
May 199802,72612.622.21$6,014
Apr 199802,60813.042.51$6,534
Mar 199802,90912.802.31$6,718
Feb 199802,62613.952.30$6,038
Jan 199802,87014.702.15$6,184
Dec 199702,88316.322.41$6,951
Nov 199703,01518.193.09$9,311
Oct 199703,12919.253.15$9,856
Sep 199703,04117.742.95$8,986
Aug 199703,28217.862.55$8,385
Jul 199703,44017.582.25$7,729
Jun 199703,42217.242.26$7,724
May 199703,76518.972.31$8,692
Apr 199703,87317.882.08$8,067
Mar 199703,80918.951.94$7,386
Feb 199703,66320.492.21$8,080
Jan 199703,96823.483.54$14,046
Dec 199603,84123.32$0
Nov 199603,95321.97$0
Oct 199604,26523.31$0
Sep 199604,26222.22$0
Aug 199604,60720.26$0
Jul 199604,59019.55$0
Jun 1996564,50118.73$1,049
May 199604,82419.43$0
Apr 199604,77121.51$0
Mar 199604,84319.38$0
Feb 199604,82016.98$0
Jan 199605,56117.07$0
Dec 199506,09417.19$0
Nov 199504,96716.00$0
Oct 199504,23215.43$0
Sep 199505,35416.18$0
Aug 199506,17615.92$0
Jul 199506,17315.24$0
Jun 199506,51116.41$0
May 1995436,69717.56$755
Apr 199507,00317.73$0
Mar 199507,99616.44$0
Feb 199518,40816.58$17
Jan 1995689,29215.92$1,083
Dec 1994010,52715.03$0
Nov 1994011,12615.90$0
Oct 19945013,33015.58$779
Sep 1994014,50215.29$0
Aug 1994216,57616.13$32
Jul 1994121,34217.56$18
Jun 19941921,74017.09$325
May 199406,28115.88$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  351 Mcf  × $  3.05 =     $1,069

────────────────────────────────────────────────────
Month total                                   $1,069

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well