Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 152567District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$866 k
Dec 1994 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
378
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111995-02-13131494
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,765 bbl$38,183
GasProduction276,668 Mcf$827,912
Total$866,095

81,049 Mcf of this lease's gas, across 25 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4739, -101.2755. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.47388, -101.27555 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,452 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,452 ft.

Completions filed
Dec 1994
1 of 1 wells

1 well

42-105365821066,452 ftDec 1994

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (378)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

378 months

May 2026071106.413.05$216
Apr 2026010898.932.87$310
Mar 20260089.753.15$0
Feb 202606463.503.75$240
Jan 202607959.138.00$632
Dec 202507056.664.41$309
Nov 202507858.593.93$306
Oct 202508459.383.30$278
Sep 202508362.743.08$255
Aug 202509463.933.01$283
Jul 202506566.743.32$215
Jun 2025010866.483.13$338
May 2025010660.553.23$343
Apr 2025011262.363.54$397
Mar 2025011267.704.27$478
Feb 2025011770.884.34$508
Jan 20250074.324.28$0
Dec 202405068.993.12$156
Nov 202404569.052.20$99
Oct 202404671.372.28$105
Sep 202404169.612.36$97
Aug 202408675.632.06$177
Jul 202409079.932.15$193
Jun 2024011378.082.63$298
May 2024011978.812.20$262
Apr 2024013184.451.66$217
Mar 2024012780.301.55$196
Feb 2024012476.091.78$221
Jan 202409573.023.30$313
Dec 2023010171.262.61$264
Nov 2023010577.892.81$295
Oct 2023011385.443.09$349
Sep 2023011489.042.74$312
Aug 2023012980.522.67$345
Jul 2023012774.852.64$336
Jun 2023012268.962.26$276
May 2023011770.622.23$261
Apr 2023012678.122.24$282
Mar 2023013072.852.39$311
Feb 2023011775.112.47$288
Jan 2023011076.533.39$373
Dec 202206976.415.73$395
Nov 202206585.005.65$367
Oct 202204487.185.86$258
Sep 202206084.888.16$490
Aug 202207794.529.13$703
Jul 20220119101.587.54$898
Jun 2022079115.097.98$630
May 20220112109.378.43$945
Apr 2022081104.226.84$554
Mar 2022071108.885.08$360
Feb 202206991.054.86$335
Jan 202208081.844.54$363
Dec 202108271.323.90$320
Nov 202107777.435.24$403
Oct 202108379.795.71$474
Sep 202108769.865.35$466
Aug 202108866.024.22$371
Jul 202109270.783.98$366
Jun 202109069.493.38$304
May 202101563.483.02$45
Apr 202101160.362.76$30
Mar 2021013161.302.72$356
Feb 20210757.805.55$39
Jan 2021011550.412.81$323
Dec 202009044.642.68$241
Nov 202003838.772.71$103
Oct 202007036.972.48$173
Sep 202004637.091.99$92
Aug 2020010039.982.39$239
Jul 202009938.371.83$181
Jun 2020016234.901.69$274
May 2020022816.921.81$414
Apr 2020021914.751.80$395
Mar 202009630.341.86$178
Feb 2020010349.881.98$204
Jan 2020016657.252.09$348
Dec 2019014959.012.30$343
Nov 2019012755.302.75$349
Oct 2019018253.472.42$440
Sep 2019010555.052.66$279
Aug 2019011453.112.30$263
Jul 2019013556.272.46$332
Jun 201909152.782.49$227
May 2019011858.482.74$323
Apr 201907662.632.75$209
Mar 2019014456.803.06$441
Feb 201903950.852.79$109
Jan 2019010046.033.23$323
Dec 201804946.594.19$205
Nov 201809752.934.24$411
Oct 20184819361.443.40$3,605
Sep 2018016359.543.11$507
Aug 2018013859.403.07$423
Jul 2018027865.142.93$815
Jun 2018021160.183.08$649
May 2018018865.382.90$545
Apr 2018012663.842.90$366
Mar 2018020461.222.79$569
Feb 2018017761.782.77$490
Jan 2018023362.874.01$934
Dec 2017025257.272.92$736
Nov 2017024955.423.12$776
Oct 2017026549.292.98$791
Sep 2017021147.523.09$651
Aug 2017027445.373.00$823
Jul 201701243.873.09$37
Jun 2017029042.493.09$895
May 201705845.373.26$189
Apr 20170647.933.21$19
Mar 2017019546.772.98$582
Feb 2017013350.452.95$393
Jan 2017022749.413.42$776
Dec 2016020948.763.72$778
Nov 2016033442.492.64$883
Oct 2016025746.193.09$794
Sep 2016030141.553.10$933
Aug 2016028841.442.92$842
Jul 2016040641.622.92$1,187
Jun 2016035345.352.69$948
May 2016035542.521.99$707
Apr 2016039736.561.99$790
Mar 2016042833.011.79$768
Feb 2016044126.472.06$910
Jan 2016052227.352.36$1,234
Dec 2015058432.362.00$1,169
Nov 2015045538.792.17$986
Oct 2015027443.552.43$665
Sep 2015017442.992.76$480
Aug 201508640.162.87$247
Jul 201502948.152.95$85
Jun 201505556.152.88$159
May 201505355.212.96$157
Apr 201502849.822.71$76
Mar 201508242.892.93$241
Feb 2015023244.662.98$690
Jan 2015017643.433.10$546
Dec 2014011354.693.59$406
Nov 2014013570.464.25$574
Oct 2014018178.303.90$706
Sep 2014024286.164.05$979
Aug 2014027389.394.04$1,102
Jul 2014028296.564.18$1,179
Jun 2014031398.164.74$1,483
May 2014032194.734.73$1,517
Apr 2014032895.944.81$1,577
Mar 2014024695.895.06$1,244
Feb 2014030197.406.19$1,864
Jan 2014030390.404.86$1,473
Dec 2013030791.824.35$1,337
Nov 2013021588.853.74$804
Oct 2013025097.423.78$945
Sep 20130277104.113.72$1,030
Aug 20130359104.253.52$1,265
Jul 20130235102.523.72$874
Jun 2013045594.403.93$1,790
May 2013027294.834.15$1,129
Apr 2013026593.964.28$1,135
Mar 2013038493.623.91$1,503
Feb 2013055091.233.42$1,881
Jan 2013047691.603.42$1,628
Dec 2012051186.773.42$1,748
Nov 2012048386.953.62$1,751
Oct 201208489.383.40$286
Sep 2012054694.672.92$1,593
Aug 2012040992.662.91$1,189
Jul 2012063085.133.02$1,903
Jun 2012056979.822.52$1,433
May 2012056591.612.49$1,406
Apr 20120404101.652.00$807
Mar 20120530105.052.22$1,178
Feb 20120374101.102.57$961
Jan 2012044698.092.73$1,219
Dec 2011060396.873.24$1,954
Nov 2011056695.723.31$1,874
Oct 2011060884.983.65$2,218
Sep 2011053883.623.99$2,144
Aug 2011061383.404.15$2,544
Jul 2011052394.144.52$2,363
Jun 2011028692.904.64$1,327
May 2011061098.134.40$2,687
Apr 20110489105.964.33$2,119
Mar 2011062096.364.06$2,516
Feb 2011052085.644.18$2,174
Jan 2011065386.504.59$2,996
Dec 2010045785.734.35$1,987
Nov 2010040280.843.80$1,526
Oct 2010051278.103.51$1,797
Sep 2010036272.633.98$1,441
Aug 2010062673.684.42$2,767
Jul 2010062872.554.74$2,975
Jun 2010043170.364.91$2,116
May 2010062571.124.24$2,647
Apr 2010052581.694.12$2,164
Mar 2010070278.394.39$3,081
Feb 2010041073.585.44$2,231
Jan 2010051674.365.96$3,077
Dec 2009058171.445.48$3,186
Nov 2009038874.593.75$1,456
Oct 2009056872.544.11$2,335
Sep 2009052665.543.06$1,612
Aug 2009021867.423.22$702
Jul 2009044361.133.46$1,535
Jun 2009044666.163.90$1,737
May 2009038254.743.93$1,500
Apr 2009036546.773.59$1,309
Mar 2009048842.144.06$1,981
Feb 2009052132.814.63$2,414
Jan 2009041035.865.37$2,202
Dec 2008049137.105.98$2,935
Nov 2008035355.496.86$2,422
Oct 2008066675.246.92$4,610
Sep 20080441101.767.88$3,474
Aug 20080569114.228.48$4,827
Jul 20080601131.0811.39$6,845
Jun 20080588131.3313.03$7,663
May 20080576123.1711.57$6,667
Apr 20080518110.3110.45$5,416
Mar 20080602101.909.66$5,818
Feb 20081147292.538.77$5,158
Jan 2008065990.388.21$5,408
Dec 2007060888.337.30$4,440
Nov 2007053491.677.29$3,894
Oct 2007061682.856.92$4,264
Sep 2007058875.846.24$3,672
Aug 2007088669.066.39$5,660
Jul 2007078670.906.39$5,021
Jun 2007080962.007.55$6,107
May 2007082358.747.85$6,457
Apr 2007078959.617.81$6,158
Mar 2007082656.927.30$6,031
Feb 2007051055.108.22$4,190
Jan 2007089450.306.73$6,014
Dec 2006077656.656.92$5,369
Nov 2006076154.207.62$5,797
Oct 2006072854.906.01$4,378
Sep 2006068460.085.04$3,445
Aug 2006075568.717.34$5,542
Jul 2006069569.376.34$4,408
Jun 2006069966.286.38$4,462
May 2006069866.016.42$4,485
Apr 2006064764.397.36$4,762
Mar 2006073656.707.08$5,213
Feb 2006054557.597.75$4,224
Jan 2006059560.598.93$5,315
Dec 2005059354.9413.42$7,955
Nov 2005065754.6910.59$6,957
Oct 2005069958.3413.80$9,643
Sep 2005059661.4512.08$7,199
Aug 2005060761.519.80$5,947
Jul 2005058255.697.84$4,565
Jun 2005056552.337.38$4,170
May 2005057045.226.65$3,791
Apr 2005067549.207.36$4,968
Mar 2005075350.377.15$5,388
Feb 20052680945.226.31$6,282
Jan 2005073143.166.32$4,622
Dec 2004085539.866.75$5,772
Nov 2004090445.286.33$5,723
Oct 200401,13849.706.52$7,414
Sep 2004096343.245.28$5,088
Aug 2004079842.375.55$4,429
Jul 2004075338.286.08$4,581
Jun 2004082836.106.43$5,327
May 2004097737.486.49$6,345
Apr 2004078834.475.86$4,616
Mar 2004088434.365.53$4,889
Feb 20043976232.455.51$5,464
Jan 2004076132.036.30$4,794
Dec 2003075030.266.30$4,726
Nov 2003074928.804.60$3,442
Oct 20032884128.174.76$4,792
Sep 2003081426.314.75$3,866
Aug 2003081529.765.13$4,181
Jul 2003073129.415.17$3,780
Jun 2003075128.565.98$4,493
May 2003072326.595.97$4,318
Apr 2003081926.675.41$4,429
Mar 2003087931.146.10$5,358
Feb 2003069333.487.93$5,493
Jan 2003076430.315.58$4,265
Dec 20024185526.914.85$5,253
Nov 2002074024.664.14$3,061
Oct 2002080226.464.23$3,392
Sep 20023384827.443.64$3,988
Aug 2002076925.963.16$2,433
Jul 2002082424.583.06$2,523
Jun 2002069623.733.34$2,323
May 2002084024.663.58$3,011
Apr 2002091123.653.51$3,200
Mar 2002087822.003.10$2,724
Feb 20024181918.222.38$2,693
Jan 2002090517.172.38$2,150
Dec 2001090316.932.36$2,135
Nov 2001094418.072.41$2,271
Oct 2001092519.782.53$2,339
Sep 2001311,05724.262.25$3,132
Aug 200101,14024.873.05$3,481
Jul 200101,21523.933.20$3,884
Jun 200101,13524.563.82$4,340
May 2001211,20525.524.31$5,726
Apr 200101,16124.685.34$6,194
Mar 2001131,19424.545.38$6,738
Feb 200101,06427.755.77$6,136
Jan 20011579327.478.40$7,072
Dec 2000084426.889.12$7,699
Nov 2000161,28032.215.66$7,758
Oct 2000221,37331.235.15$7,752
Sep 200001,34831.875.19$6,991
Aug 200001,50429.644.54$6,829
Jul 200041,46928.534.09$6,122
Jun 200001,44729.304.40$6,363
May 200001,45827.263.68$5,365
Apr 200001,42124.513.12$4,428
Mar 20001243128.422.86$1,574
Feb 200001,32727.622.73$3,618
Jan 2000171,36525.272.48$3,815
Dec 199901,01424.282.42$2,458
Nov 199991,36823.192.43$3,538
Oct 199901,38320.982.80$3,878
Sep 199951,36921.752.62$3,694
Aug 199901,57019.262.88$4,515
Jul 1999171,60017.892.37$4,100
Jun 199901,60615.942.36$3,794
May 199901,57515.792.32$3,656
Apr 199951,53415.102.21$3,463
Mar 199901,67812.471.84$3,085
Feb 199901,4559.981.82$2,645
Jan 1999101,50810.381.90$2,969
Dec 1998101,4099.201.77$2,591
Nov 199801,46610.892.19$3,204
Oct 1998201,69412.421.97$3,584
Sep 199801,66312.592.08$3,463
Aug 199801,67411.301.91$3,193
Jul 1998131,26211.742.24$2,976
Jun 199801,58611.242.24$3,548
May 199801,85312.622.21$4,088
Apr 1998251,84913.042.51$4,958
Mar 1998281,80712.802.31$4,532
Feb 1998401,54413.952.30$4,108
Jan 199801,75114.702.15$3,773
Dec 1997531,10016.322.41$3,517
Nov 1997099518.193.09$3,073
Oct 199701,19119.253.15$3,751
Sep 199701,58717.742.95$4,689
Aug 19971011,80217.862.55$6,408
Jul 199701,53117.582.25$3,440
Jun 199701,49117.242.26$3,365
May 199702,24618.972.31$5,185
Apr 199702,15717.882.08$4,493
Mar 1997301,75618.951.94$3,974
Feb 1997441,67320.492.21$4,592
Jan 1997561,90823.483.54$8,069
Dec 1996752,10323.32$1,749
Nov 1996782,15821.97$1,714
Oct 199622,00823.31$47
Sep 1996272,03022.22$600
Aug 199602,19920.26$0
Jul 1996592,48819.55$1,153
Jun 199622,45418.73$37
May 1996422,39919.43$816
Apr 1996142,49121.51$301
Mar 1996112,62319.38$213
Feb 199602,65416.98$0
Jan 1996952,10617.07$1,622
Dec 199502,91717.19$0
Nov 199502,77616.00$0
Oct 1995132,13615.43$201
Sep 199501,64616.18$0
Aug 1995753,30615.92$1,194
Jul 199503,82215.24$0
Jun 199502,98216.41$0
May 1995493,32617.56$860
Apr 1995873,77717.73$1,543
Mar 199504,55716.44$0
Feb 19951094,96116.58$1,807
Jan 19951437,67215.92$2,277
Dec 199409,45815.03$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   71 Mcf  × $  3.05 =       $216

────────────────────────────────────────────────────
Month total                                     $216

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well