HILL-ROUSSELOT "G"

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 152783District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$485 k
Aug 1994 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
382
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111996-02-06133635
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition153 bbl$8,066
GasProduction172,160 Mcf$476,739
Total$484,804

54,296 Mcf of this lease's gas, across 29 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7471, -100.9321. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.74711, -100.93208 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,600 ft.

Completions filed
Aug 1994
1 of 1 wells

1 well

42-4133189438,600 ftAug 1994

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (382)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

382 months

May 2026039106.413.05$119
Apr 202603998.932.87$112
Mar 202604089.753.15$126
Feb 202603663.503.75$135
Jan 202603959.138.00$312
Dec 202503956.664.41$172
Nov 202503858.593.93$149
Oct 202504259.383.30$139
Sep 202504062.743.08$123
Aug 202504263.933.01$127
Jul 202504266.743.32$139
Jun 202504166.483.13$128
May 202504160.553.23$133
Apr 202504362.363.54$152
Mar 202504567.704.27$192
Feb 202503970.884.34$169
Jan 202504274.324.28$180
Dec 202404068.993.12$125
Nov 202404169.052.20$90
Oct 202404371.372.28$98
Sep 202404369.612.36$102
Aug 202404575.632.06$93
Jul 202404579.932.15$97
Jun 202404478.082.63$116
May 202404578.812.20$99
Apr 202404384.451.66$71
Mar 202404480.301.55$68
Feb 202404276.091.78$75
Jan 202404373.023.30$142
Dec 202304171.262.61$107
Nov 202304377.892.81$121
Oct 202304685.443.09$142
Sep 202304489.042.74$120
Aug 202304680.522.67$123
Jul 202304774.852.64$124
Jun 202304668.962.26$104
May 202304870.622.23$107
Apr 202304778.122.24$105
Mar 202304872.852.39$115
Feb 202304475.112.47$108
Jan 202304276.533.39$142
Dec 202204576.415.73$258
Nov 202204485.005.65$248
Oct 202204887.185.86$281
Sep 202204684.888.16$376
Aug 202204894.529.13$438
Jul 2022049101.587.54$370
Jun 2022048115.097.98$383
May 2022052109.378.43$439
Apr 2022051104.226.84$349
Mar 2022050108.885.08$254
Feb 202204691.054.86$224
Jan 202215081.844.54$309
Dec 202115271.323.90$274
Nov 202125077.435.24$417
Oct 202195279.795.71$1,015
Sep 202125269.865.35$418
Aug 202115466.024.22$294
Jul 202106370.783.98$251
Jun 202104669.493.38$156
May 202145263.483.02$411
Apr 202115260.362.76$204
Mar 202125461.302.72$269
Feb 202104757.805.55$261
Jan 202105150.412.81$143
Dec 202005144.642.68$136
Nov 202025238.772.71$218
Oct 202005436.972.48$134
Sep 202015437.091.99$145
Aug 202015739.982.39$176
Jul 202015438.371.83$137
Jun 202025234.901.69$158
May 2020211016.921.81$233
Apr 202014914.751.80$103
Mar 202035030.341.86$184
Feb 202094749.881.98$542
Jan 202014957.252.09$160
Dec 201924959.012.30$231
Nov 201974855.302.75$519
Oct 2019175553.472.42$1,042
Sep 201906655.052.66$175
Aug 201905453.112.30$124
Jul 201905356.272.46$130
Jun 201905052.782.49$125
May 201905158.482.74$140
Apr 201905062.632.75$138
Mar 201915156.803.06$213
Feb 201914650.852.79$179
Jan 201995146.033.23$579
Dec 201894946.594.19$624
Nov 2018164952.934.24$1,055
Oct 201825161.443.40$296
Sep 2018155159.543.11$1,052
Aug 201825359.403.07$281
Jul 201825465.142.93$289
Jun 201825260.183.08$280
May 201815365.382.90$219
Apr 201805263.842.90$151
Mar 201805361.222.79$148
Feb 201804661.782.77$127
Jan 201805562.874.01$221
Dec 201705057.272.92$146
Nov 201715055.423.12$211
Oct 201717149.292.98$261
Sep 201704847.523.09$148
Aug 201705345.373.00$159
Jul 201715343.873.09$208
Jun 201705242.493.09$161
May 201715345.373.26$218
Apr 201715247.933.21$215
Mar 201716246.772.98$232
Feb 201714950.452.95$195
Jan 201715449.413.42$234
Dec 201605548.763.72$205
Nov 201615342.492.64$183
Oct 201606746.193.09$207
Sep 201616041.553.10$228
Aug 201606441.442.92$187
Jul 201606641.622.92$193
Jun 201605945.352.69$158
May 201615542.521.99$152
Apr 201615436.561.99$144
Mar 201605533.011.79$99
Feb 201615326.472.06$136
Jan 201616427.352.36$179
Dec 201516232.362.00$156
Nov 201506338.792.17$137
Oct 201517243.552.43$218
Sep 201517342.992.76$244
Aug 201507940.162.87$227
Jul 201518348.152.95$293
Jun 201508456.152.88$242
May 2015012355.212.96$364
Apr 2015021749.822.71$587
Mar 2015019142.892.93$561
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140389.394.04$12
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 201301191.824.35$48
Nov 201301488.853.74$52
Oct 201302497.423.78$91
Sep 2013022104.113.72$82
Aug 2013018104.253.52$63
Jul 2013023102.523.72$86
Jun 201302394.403.93$90
May 201302494.834.15$100
Apr 201303193.964.28$133
Mar 201302593.623.91$98
Feb 201302591.233.42$86
Jan 20130091.603.42$0
Dec 201208286.773.42$280
Nov 2012012886.953.62$464
Oct 2012013189.383.40$445
Sep 2012012994.672.92$376
Aug 2012013192.662.91$381
Jul 2012012885.133.02$387
Jun 2012012279.822.52$307
May 2012012991.612.49$321
Apr 20120119101.652.00$238
Mar 20120135105.052.22$300
Feb 20120131101.102.57$337
Jan 2012014198.092.73$386
Dec 2011014096.873.24$454
Nov 2011013795.723.31$454
Oct 2011014184.983.65$514
Sep 2011014683.623.99$582
Aug 2011017183.404.15$710
Jul 2011018794.144.52$845
Jun 2011020892.904.64$965
May 2011021898.134.40$960
Apr 20110295105.964.33$1,278
Mar 2011024396.364.06$986
Feb 20110185.644.18$4
Jan 20110486.504.59$18
Dec 20100085.734.35$0
Nov 20100580.843.80$19
Oct 20100178.103.51$4
Sep 20100172.633.98$4
Aug 2010012973.684.42$570
Jul 2010027672.554.74$1,307
Jun 2010030670.364.91$1,503
May 2010031371.124.24$1,326
Apr 2010032781.694.12$1,348
Mar 201005878.394.39$255
Feb 2010022973.585.44$1,246
Jan 201008674.365.96$513
Dec 2009015271.445.48$834
Nov 2009027174.593.75$1,017
Oct 2009036872.544.11$1,513
Sep 2009041065.543.06$1,257
Aug 2009030767.423.22$988
Jul 2009031261.133.46$1,081
Jun 2009050166.163.90$1,951
May 2009024254.743.93$950
Apr 200905946.773.59$212
Mar 2009018642.144.06$755
Feb 2009021632.814.63$1,001
Jan 2009027435.865.37$1,472
Dec 2008022537.105.98$1,345
Nov 2008023955.496.86$1,640
Oct 200806075.246.92$415
Sep 2008086101.767.88$677
Aug 2008093114.228.48$789
Jul 20080173131.0811.39$1,970
Jun 20080228131.3313.03$2,971
May 20080256123.1711.57$2,963
Apr 20080298110.3110.45$3,116
Mar 20080336101.909.66$3,247
Feb 2008034692.538.77$3,035
Jan 2008063190.388.21$5,178
Dec 200703388.337.30$241
Nov 200705591.677.29$401
Oct 2007012782.856.92$879
Sep 2007040775.846.24$2,541
Aug 2007042069.066.39$2,683
Jul 2007040270.906.39$2,568
Jun 2007029662.007.55$2,234
May 2007046058.747.85$3,609
Apr 2007022959.617.81$1,787
Mar 2007021156.927.30$1,541
Feb 2007021855.108.22$1,791
Jan 2007031150.306.73$2,092
Dec 200607456.656.92$512
Nov 2006042954.207.62$3,268
Oct 2006028554.906.01$1,714
Sep 2006039360.085.04$1,980
Aug 2006044268.717.34$3,244
Jul 2006041369.376.34$2,620
Jun 2006042366.286.38$2,700
May 2006047466.016.42$3,045
Apr 2006038564.397.36$2,834
Mar 2006030756.707.08$2,174
Feb 2006024057.597.75$1,860
Jan 2006033860.598.93$3,019
Dec 2005043054.9413.42$5,769
Nov 2005046354.6910.59$4,902
Oct 2005042358.3413.80$5,836
Sep 2005044661.4512.08$5,387
Aug 2005050161.519.80$4,908
Jul 2005045055.697.84$3,530
Jun 2005060952.337.38$4,495
May 2005052645.226.65$3,499
Apr 2005060649.207.36$4,460
Mar 2005058050.377.15$4,150
Feb 2005039445.226.31$2,487
Jan 2005033043.166.32$2,086
Dec 2004017339.866.75$1,168
Nov 2004027745.286.33$1,754
Oct 2004037449.706.52$2,437
Sep 2004039143.245.28$2,066
Aug 2004048842.375.55$2,709
Jul 2004048238.286.08$2,933
Jun 2004044136.106.43$2,837
May 2004048137.486.49$3,124
Apr 2004052234.475.86$3,058
Mar 2004054334.365.53$3,003
Feb 2004054232.455.51$2,986
Jan 2004065932.036.30$4,151
Dec 2003063530.266.30$4,002
Nov 2003059828.804.60$2,748
Oct 2003063228.174.76$3,008
Sep 2003064326.314.75$3,054
Aug 2003063129.765.13$3,237
Jul 2003063229.415.17$3,268
Jun 2003064528.565.98$3,859
May 2003059926.595.97$3,578
Apr 2003057426.675.41$3,104
Mar 2003061831.146.10$3,767
Feb 2003049433.487.93$3,915
Jan 2003059630.315.58$3,327
Dec 2002028426.914.85$1,378
Nov 2002052724.664.14$2,180
Oct 2002062726.464.23$2,652
Sep 2002062827.443.64$2,283
Aug 2002062825.963.16$1,987
Jul 2002064324.583.06$1,969
Jun 2002057523.733.34$1,919
May 2002067724.663.58$2,426
Apr 2002070723.653.51$2,483
Mar 2002071322.003.10$2,212
Feb 2002060918.222.38$1,447
Jan 2002072717.172.38$1,727
Dec 2001077116.932.36$1,823
Nov 2001082818.072.41$1,992
Oct 2001071919.782.53$1,818
Sep 2001065724.262.25$1,479
Aug 2001057424.873.05$1,753
Jul 2001059123.933.20$1,889
Jun 2001055224.563.82$2,111
May 2001071025.524.31$3,058
Apr 2001065724.685.34$3,505
Mar 2001081024.545.38$4,355
Feb 2001074327.755.77$4,285
Jan 2001073327.478.40$6,156
Dec 2000057526.889.12$5,245
Nov 2000065832.215.66$3,723
Oct 2000067631.235.15$3,478
Sep 2000083631.875.19$4,336
Aug 200001,06529.644.54$4,836
Jul 200001,25928.534.09$5,149
Jun 200001,50229.304.40$6,605
May 200001,64927.263.68$6,068
Apr 2000094324.513.12$2,938
Mar 200001,09828.422.86$3,140
Feb 200001,09627.622.73$2,988
Jan 200001,08425.272.48$2,689
Dec 1999095724.282.42$2,320
Nov 199901,03523.192.43$2,519
Oct 199931,36720.982.80$3,896
Sep 199901,07421.752.62$2,813
Aug 199901,32219.262.88$3,802
Jul 199901,06717.892.37$2,531
Jun 199901,06015.942.36$2,504
May 199901,51915.792.32$3,526
Apr 199901,26915.102.21$2,802
Mar 199901,08012.471.84$1,985
Feb 199901,2399.981.82$2,252
Jan 199901,83310.381.90$3,483
Dec 199801,3489.201.77$2,390
Nov 199801,26610.892.19$2,767
Oct 199801,15112.421.97$2,267
Sep 199801,12112.592.08$2,335
Aug 199801,16411.301.91$2,220
Jul 199801,31011.742.24$2,931
Jun 199801,16711.242.24$2,611
May 199801,18812.622.21$2,621
Apr 1998095813.042.51$2,400
Mar 199801,14112.802.31$2,635
Feb 199801,26313.952.30$2,904
Jan 199801,18414.702.15$2,551
Dec 199701,18516.322.41$2,857
Nov 199701,30918.193.09$4,043
Oct 199701,39319.253.15$4,388
Sep 199701,24117.742.95$3,667
Aug 199701,38217.862.55$3,531
Jul 199701,63217.582.25$3,667
Jun 199701,44317.242.26$3,257
May 199701,21118.972.31$2,796
Apr 199701,25217.882.08$2,608
Mar 199701,20618.951.94$2,339
Feb 199701,30220.492.21$2,872
Jan 199701,38523.483.54$4,902
Dec 199601,41223.32$0
Nov 199601,23821.97$0
Oct 199601,24823.31$0
Sep 199601,61022.22$0
Aug 199601,33820.26$0
Jul 199601,51119.55$0
Jun 199601,63718.73$0
May 199601,71219.43$0
Apr 199601,66621.51$0
Mar 199601,85819.38$0
Feb 199601,95116.98$0
Jan 199601,83817.07$0
Dec 199501,47717.19$0
Nov 199501,78616.00$0
Oct 199501,73915.43$0
Sep 199501,71416.18$0
Aug 199501,68315.92$0
Jul 199501,75515.24$0
Jun 199502,04216.41$0
May 199502,26417.56$0
Apr 199501,92317.73$0
Mar 199502,14616.44$0
Feb 199502,46116.58$0
Jan 199502,51615.92$0
Dec 199402,20215.03$0
Nov 199402,42115.90$0
Oct 199402,70015.58$0
Sep 199403,53415.29$0
Aug 1994091416.13$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   39 Mcf  × $  3.05 =       $119

────────────────────────────────────────────────────
Month total                                     $119

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/152783 is the state's own key, not one this site invented.