HILL-ROUSSELOT "H'

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 152819District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$753 k
Sep 1994 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
381
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111995-04-10131848
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition212 bbl$10,248
GasProduction272,590 Mcf$742,922
Total$753,170

90,649 Mcf of this lease's gas, across 28 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7532, -100.9071. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.75321, -100.90707 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,500 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,500 ft.

Completions filed
Sep 1994
1 of 1 wells

1 well

42-4133190038,500 ftSep 1994

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (381)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

381 months

May 2026094106.413.05$286
Apr 202609798.932.87$278
Mar 202609989.753.15$312
Feb 202608963.503.75$334
Jan 202609959.138.00$792
Dec 2025010356.664.41$455
Nov 202509958.593.93$389
Oct 2025010459.383.30$344
Sep 202509962.743.08$305
Aug 2025010163.933.01$304
Jul 2025010466.743.32$345
Jun 202509966.483.13$310
May 202529360.553.23$422
Apr 202509362.363.54$330
Mar 202509667.704.27$410
Feb 202508670.884.34$373
Jan 202509574.324.28$406
Dec 202409668.993.12$300
Nov 202409469.052.20$207
Oct 202409671.372.28$219
Sep 202409269.612.36$218
Aug 202409575.632.06$196
Jul 202409579.932.15$204
Jun 202408978.082.63$234
May 202409278.812.20$202
Apr 202408684.451.66$143
Mar 202408280.301.55$127
Feb 202406776.091.78$120
Jan 202404873.023.30$158
Dec 2023010271.262.61$266
Nov 202308177.892.81$227
Oct 202308785.443.09$269
Sep 202308389.042.74$227
Aug 202308680.522.67$230
Jul 202308574.852.64$225
Jun 202308768.962.26$196
May 202309170.622.23$203
Apr 202308678.122.24$192
Mar 202308572.852.39$203
Feb 202307875.112.47$192
Jan 202308676.533.39$291
Dec 202208876.415.73$504
Nov 202208585.005.65$480
Oct 202208887.185.86$516
Sep 202208184.888.16$661
Aug 202208194.529.13$739
Jul 2022088101.587.54$664
Jun 2022088115.097.98$702
May 2022097109.378.43$818
Apr 2022094104.226.84$643
Mar 2022091108.885.08$462
Feb 202208291.054.86$398
Jan 202219181.844.54$495
Dec 202119671.323.90$446
Nov 202129477.435.24$647
Oct 2021810079.795.71$1,210
Sep 202129969.865.35$669
Aug 2021210466.024.22$571
Jul 2021410570.783.98$701
Jun 2021410369.493.38$626
May 2021010863.483.02$326
Apr 2021010460.362.76$287
Mar 2021011561.302.72$312
Feb 202109557.805.55$527
Jan 202109850.412.81$275
Dec 202019744.642.68$304
Nov 2020710138.772.71$545
Oct 20201711636.972.48$916
Sep 20201111937.091.99$645
Aug 2020210639.982.39$333
Jul 2020210438.371.83$267
Jun 2020410134.901.69$310
May 20201122616.921.81$596
Apr 2020111414.751.80$220
Mar 2020311830.341.86$310
Feb 20201011049.881.98$717
Jan 2020011957.252.09$249
Dec 2019012259.012.30$281
Nov 2019112355.302.75$394
Oct 2019213653.472.42$436
Sep 2019016355.052.66$433
Aug 2019113253.112.30$357
Jul 2019113256.272.46$381
Jun 2019012952.782.49$321
May 2019013358.482.74$364
Apr 2019012862.632.75$352
Mar 2019113156.803.06$458
Feb 2019112150.852.79$389
Jan 2019613546.033.23$712
Dec 2018313646.594.19$709
Nov 2018813852.934.24$1,008
Oct 2018215261.443.40$639
Sep 2018614859.543.11$817
Aug 2018615659.403.07$835
Jul 2018415565.142.93$715
Jun 2018815160.183.08$946
May 2018515865.382.90$785
Apr 2018515463.842.90$766
Mar 2018115761.222.79$499
Feb 2018014461.782.77$398
Jan 2018115962.874.01$700
Dec 2017116357.272.92$533
Nov 2017116855.423.12$579
Oct 2017217849.292.98$630
Sep 2017117447.523.09$585
Aug 2017018545.373.00$556
Jul 2017218643.873.09$662
Jun 2017118642.493.09$617
May 2017219245.373.26$717
Apr 2017218947.933.21$703
Mar 2017219546.772.98$675
Feb 2017217250.452.95$609
Jan 2017219349.413.42$759
Dec 2016119748.763.72$782
Nov 2016220042.492.64$614
Oct 2016122146.193.09$729
Sep 2016221641.553.10$753
Aug 2016223341.442.92$764
Jul 2016224241.622.92$791
Jun 2016123745.352.69$682
May 2016221942.521.99$521
Apr 2016321736.561.99$542
Mar 2016225633.011.79$525
Feb 2016330226.472.06$703
Jan 2016222027.352.36$575
Dec 2015116132.362.00$355
Nov 2015220538.792.17$522
Oct 2015329743.552.43$851
Sep 2015334842.992.76$1,089
Aug 2015135740.162.87$1,066
Jul 2015437448.152.95$1,294
Jun 2015036856.152.88$1,061
May 2015037355.212.96$1,102
Apr 2015036549.822.71$988
Mar 2015032342.892.93$948
Feb 2015032944.662.98$979
Jan 2015036843.433.10$1,141
Dec 2014037454.693.59$1,343
Nov 2014036770.464.25$1,560
Oct 2014035578.303.90$1,385
Sep 2014036886.164.05$1,489
Aug 2014037789.394.04$1,521
Jul 2014039596.564.18$1,651
Jun 2014037998.164.74$1,795
May 2014040994.734.73$1,933
Apr 2014038995.944.81$1,871
Mar 2014040095.895.06$2,023
Feb 2014036497.406.19$2,254
Jan 2014038390.404.86$1,862
Dec 2013039691.824.35$1,724
Nov 2013035488.853.74$1,323
Oct 2013040297.423.78$1,519
Sep 20130363104.113.72$1,350
Aug 20130402104.253.52$1,416
Jul 20130399102.523.72$1,483
Jun 2013040694.403.93$1,597
May 2013048594.834.15$2,012
Apr 2013027893.964.28$1,191
Mar 2013044093.623.91$1,722
Feb 2013039991.233.42$1,365
Jan 2013045091.603.42$1,539
Dec 2012044386.773.42$1,515
Nov 2012045386.953.62$1,642
Oct 2012047489.383.40$1,611
Sep 2012047094.672.92$1,372
Aug 2012050692.662.91$1,472
Jul 2012052985.133.02$1,598
Jun 2012054879.822.52$1,380
May 2012062891.612.49$1,563
Apr 20120774101.652.00$1,546
Mar 20120736105.052.22$1,635
Feb 20120111101.102.57$285
Jan 2012012598.092.73$342
Dec 2011012396.873.24$398
Nov 2011013095.723.31$430
Oct 2011014784.983.65$536
Sep 2011015083.623.99$598
Aug 2011014883.404.15$614
Jul 2011018694.144.52$840
Jun 201104092.904.64$186
May 2011018298.134.40$802
Apr 20110315105.964.33$1,365
Mar 2011033696.364.06$1,363
Feb 2011027985.644.18$1,166
Jan 2011028986.504.59$1,326
Dec 2010031485.734.35$1,365
Nov 2010035080.843.80$1,328
Oct 2010047778.103.51$1,674
Sep 2010060972.633.98$2,424
Aug 2010043773.684.42$1,931
Jul 2010077872.554.74$3,685
Jun 201007770.364.91$378
May 2010050171.124.24$2,122
Apr 2010016081.694.12$660
Mar 2010037278.394.39$1,633
Feb 2010049973.585.44$2,716
Jan 2010036374.365.96$2,165
Dec 2009031871.445.48$1,744
Nov 2009038774.593.75$1,452
Oct 2009020872.544.11$855
Sep 2009026865.543.06$821
Aug 2009018767.423.22$602
Jul 2009019261.133.46$665
Jun 2009033566.163.90$1,305
May 2009047554.743.93$1,865
Apr 2009024746.773.59$886
Mar 2009029042.144.06$1,177
Feb 2009025432.814.63$1,177
Jan 200906835.865.37$365
Dec 200801237.105.98$72
Nov 200806855.496.86$467
Oct 2008018875.246.92$1,301
Sep 20080339101.767.88$2,670
Aug 20080354114.228.48$3,003
Jul 20080379131.0811.39$4,317
Jun 20080408131.3313.03$5,317
May 20080441123.1711.57$5,104
Apr 20080394110.3110.45$4,119
Mar 20080434101.909.66$4,194
Feb 2008038692.538.77$3,385
Jan 2008041790.388.21$3,422
Dec 2007044088.337.30$3,213
Nov 2007049591.677.29$3,609
Oct 2007049382.856.92$3,413
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 2007043770.906.39$2,792
Jun 2007032062.007.55$2,416
May 2007056558.747.85$4,433
Apr 2007055159.617.81$4,301
Mar 2007065356.927.30$4,768
Feb 2007032955.108.22$2,703
Jan 2007047650.306.73$3,202
Dec 2006060756.656.92$4,199
Nov 2006058954.207.62$4,487
Oct 2006044954.906.01$2,700
Sep 2006059360.085.04$2,987
Aug 2006063068.717.34$4,624
Jul 2006063169.376.34$4,002
Jun 2006043166.286.38$2,751
May 2006060466.016.42$3,881
Apr 2006054064.397.36$3,975
Mar 2006052856.707.08$3,740
Feb 2006053557.597.75$4,147
Jan 2006066560.598.93$5,941
Dec 2005048254.9413.42$6,466
Nov 2005046854.6910.59$4,955
Oct 2005048158.3413.80$6,636
Sep 2005081761.4512.08$9,869
Aug 2005089261.519.80$8,739
Jul 2005093455.697.84$7,326
Jun 200501,00152.337.38$7,388
May 200501,00345.226.65$6,671
Apr 2005056949.207.36$4,188
Mar 2005070150.377.15$5,016
Feb 2005057145.226.31$3,604
Jan 2005058143.166.32$3,673
Dec 2004060239.866.75$4,064
Nov 2004031545.286.33$1,994
Oct 2004088949.706.52$5,792
Sep 2004059543.245.28$3,144
Aug 2004041242.375.55$2,287
Jul 2004036338.286.08$2,209
Jun 2004061036.106.43$3,924
May 2004080337.486.49$5,215
Apr 2004054234.475.86$3,175
Mar 2004063734.365.53$3,523
Feb 2004044432.455.51$2,446
Jan 2004078532.036.30$4,945
Dec 200301,02630.266.30$6,465
Nov 2003098328.804.60$4,517
Oct 200301,23528.174.76$5,878
Sep 200301,03626.314.75$4,920
Aug 2003098129.765.13$5,032
Jul 2003063529.415.17$3,283
Jun 200301,07128.565.98$6,408
May 200301,17726.595.97$7,030
Apr 200301,22426.675.41$6,619
Mar 200301,32431.146.10$8,071
Feb 200301,23833.487.93$9,812
Jan 200301,22430.315.58$6,832
Dec 2002052926.914.85$2,568
Nov 200201,21624.664.14$5,031
Oct 200201,25826.464.23$5,320
Sep 200201,10427.443.64$4,013
Aug 2002093725.963.16$2,965
Jul 2002060924.583.06$1,865
Jun 2002092323.733.34$3,081
May 200201,30024.663.58$4,659
Apr 200201,15423.653.51$4,053
Mar 200201,17322.003.10$3,639
Feb 200201,03518.222.38$2,459
Jan 200201,38617.172.38$3,293
Dec 200101,16716.932.36$2,759
Nov 200101,09818.072.41$2,641
Oct 200101,16419.782.53$2,944
Sep 200101,17824.262.25$2,652
Aug 200101,15624.873.05$3,529
Jul 200101,28723.933.20$4,115
Jun 2001087424.563.82$3,342
May 2001066625.524.31$2,869
Apr 2001048624.685.34$2,593
Mar 2001048724.545.38$2,618
Feb 2001055827.755.77$3,218
Jan 2001060427.478.40$5,073
Dec 2000088226.889.12$8,046
Nov 2000077032.215.66$4,357
Oct 200001,51331.235.15$7,785
Sep 200001,32331.875.19$6,862
Aug 200001,39229.644.54$6,321
Jul 2000084728.534.09$3,464
Jun 2000086129.304.40$3,786
May 2000090727.263.68$3,338
Apr 2000092124.513.12$2,870
Mar 200001,03128.422.86$2,948
Feb 200001,20127.622.73$3,275
Jan 200001,33925.272.48$3,321
Dec 199901,06724.282.42$2,586
Nov 199901,14023.192.43$2,775
Oct 199901,21420.982.80$3,404
Sep 199901,16221.752.62$3,043
Aug 199901,21719.262.88$3,500
Jul 199901,29217.892.37$3,065
Jun 199901,22315.942.36$2,889
May 199901,34315.792.32$3,117
Apr 199901,32915.102.21$2,935
Mar 199901,25612.471.84$2,309
Feb 199901,2419.981.82$2,256
Jan 199901,40010.381.90$2,660
Dec 199801,4309.201.77$2,536
Nov 199801,45610.892.19$3,182
Oct 199801,50512.421.97$2,964
Sep 199801,31712.592.08$2,743
Aug 199801,56111.301.91$2,977
Jul 199801,56211.742.24$3,495
Jun 199801,55611.242.24$3,481
May 199801,73312.622.21$3,824
Apr 199801,67213.042.51$4,189
Mar 199801,72112.802.31$3,975
Feb 199801,59413.952.30$3,665
Jan 199801,83014.702.15$3,943
Dec 199701,70316.322.41$4,106
Nov 199701,72518.193.09$5,327
Oct 199701,95919.253.15$6,171
Sep 199701,82617.742.95$5,396
Aug 199701,86617.862.55$4,767
Jul 199702,02417.582.25$4,548
Jun 199702,16917.242.26$4,896
May 199701,79118.972.31$4,135
Apr 199701,91617.882.08$3,991
Mar 199701,90618.951.94$3,696
Feb 199701,77220.492.21$3,909
Jan 199701,84623.483.54$6,534
Dec 199601,90023.32$0
Nov 199601,92521.97$0
Oct 199601,92323.31$0
Sep 199601,86622.22$0
Aug 199602,22520.26$0
Jul 199602,26719.55$0
Jun 199602,21818.73$0
May 199602,38919.43$0
Apr 199602,12521.51$0
Mar 199602,35019.38$0
Feb 199602,17016.98$0
Jan 199602,56417.07$0
Dec 199502,29917.19$0
Nov 199502,53816.00$0
Oct 199502,76515.43$0
Sep 199502,66016.18$0
Aug 199502,85415.92$0
Jul 199502,87315.24$0
Jun 199503,08416.41$0
May 199503,13617.56$0
Apr 199504,19017.73$0
Mar 199505,07116.44$0
Feb 199504,82516.58$0
Jan 199504,69515.92$0
Dec 199405,69715.03$0
Nov 199405,61815.90$0
Oct 1994011,49415.58$0
Sep 1994092815.29$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   94 Mcf  × $  3.05 =       $286

────────────────────────────────────────────────────
Month total                                     $286

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/152819 is the state's own key, not one this site invented.