MILLSPAUGH, AUSTIN "14"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 153572District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$957 k
Jan 1995 – May 2026
Value, last 12 filed months
$29 k
at the published price for each month
Months reported
377
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111995-06-22132191
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition54 bbl$3,440
GasProduction266,099 Mcf$953,634
Total$957,074

43,999 Mcf of this lease's gas, across 23 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5386, -101.4477. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.53862, -101.44768 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,455 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,455 ft.

Completions filed
Jan 1995
1 of 1 wells

1 well

42-1053659357,455 ftJan 1995

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (377)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

377 months

May 20260445106.413.05$1,355
Apr 2026258498.932.87$1,874
Mar 20260089.753.15$0
Feb 2026342263.503.75$1,773
Jan 2026448959.138.00$4,148
Dec 2025649656.664.41$2,529
Nov 2025550158.593.93$2,260
Oct 2025347559.383.30$1,748
Sep 2025251762.743.08$1,716
Aug 2025572563.933.01$2,505
Jul 202561,45166.743.32$5,211
Jun 202541,09066.483.13$3,676
May 2025880760.553.23$3,093
Apr 2025219562.363.54$816
Mar 20250067.704.27$0
Feb 2025425270.884.34$1,377
Jan 20250074.324.28$0
Dec 2024049468.993.12$1,542
Nov 2024050969.052.20$1,119
Oct 2024064871.372.28$1,478
Sep 2024033869.612.36$799
Aug 2024051775.632.06$1,067
Jul 2024052379.932.15$1,123
Jun 2024051678.082.63$1,359
May 2024053978.812.20$1,185
Apr 2024052784.451.66$874
Mar 2024055680.301.55$859
Feb 2024053076.091.78$945
Jan 2024057973.023.30$1,909
Dec 2023058071.262.61$1,514
Nov 2023061277.892.81$1,718
Oct 2023068385.443.09$2,109
Sep 2023057489.042.74$1,570
Aug 2023034180.522.67$911
Jul 2023033874.852.64$893
Jun 2023033068.962.26$745
May 2023032370.622.23$719
Apr 2023031478.122.24$703
Mar 2023032672.852.39$780
Feb 2023029775.112.47$732
Jan 2023032776.533.39$1,108
Dec 2022031876.415.73$1,822
Nov 2022031785.005.65$1,790
Oct 2022033287.185.86$1,947
Sep 2022031984.888.16$2,604
Aug 2022035194.529.13$3,204
Jul 20220427101.587.54$3,220
Jun 20220230115.097.98$1,835
May 20220327109.378.43$2,758
Apr 20220392104.226.84$2,680
Mar 20220347108.885.08$1,762
Feb 2022035791.054.86$1,735
Jan 2022033781.844.54$1,529
Dec 2021037771.323.90$1,470
Nov 2021031377.435.24$1,639
Oct 2021045079.795.71$2,571
Sep 2021031569.865.35$1,686
Aug 2021038066.024.22$1,604
Jul 2021041070.783.98$1,633
Jun 2021035269.493.38$1,190
May 2021030163.483.02$908
Apr 2021037260.362.76$1,026
Mar 2021038261.302.72$1,038
Feb 2021036257.805.55$2,008
Jan 2021036050.412.81$1,012
Dec 2020034644.642.68$926
Nov 2020037338.772.71$1,010
Oct 2020039536.972.48$979
Sep 2020033737.091.99$671
Aug 2020037239.982.39$887
Jul 2020037738.371.83$688
Jun 2020037634.901.69$636
May 2020039716.921.81$720
Apr 2020044014.751.80$794
Mar 2020044030.341.86$817
Feb 2020043949.881.98$870
Jan 2020044657.252.09$934
Dec 2019041259.012.30$949
Nov 2019043755.302.75$1,202
Oct 2019045353.472.42$1,096
Sep 2019043155.052.66$1,145
Aug 2019038353.112.30$883
Jul 2019042756.272.46$1,050
Jun 2019041752.782.49$1,039
May 2019045758.482.74$1,252
Apr 2019045062.632.75$1,238
Mar 2019047356.803.06$1,448
Feb 2019040950.852.79$1,142
Jan 2019046346.033.23$1,495
Dec 2018044646.594.19$1,867
Nov 2018043352.934.24$1,835
Oct 2018046861.443.40$1,590
Sep 2018043159.543.11$1,340
Aug 2018036259.403.07$1,110
Jul 2018044865.142.93$1,313
Jun 2018044060.183.08$1,354
May 2018044465.382.90$1,288
Apr 2018045363.842.90$1,314
Mar 2018043661.222.79$1,215
Feb 2018044061.782.77$1,217
Jan 2018043362.874.01$1,736
Dec 2017043657.272.92$1,274
Nov 2017047755.423.12$1,487
Oct 2017036449.292.98$1,086
Sep 2017045647.523.09$1,408
Aug 2017044645.373.00$1,340
Jul 2017044843.873.09$1,383
Jun 2017043142.493.09$1,331
May 2017049745.373.26$1,622
Apr 2017047147.933.21$1,513
Mar 2017042846.772.98$1,277
Feb 2017044850.452.95$1,323
Jan 2017039249.413.42$1,340
Dec 2016044948.763.72$1,672
Nov 2016039642.492.64$1,047
Oct 2016047246.193.09$1,459
Sep 2016046641.553.10$1,445
Aug 2016049341.442.92$1,442
Jul 2016047041.622.92$1,374
Jun 2016051245.352.69$1,375
May 2016051042.521.99$1,015
Apr 2016056036.561.99$1,115
Mar 2016047333.011.79$849
Feb 2016038126.472.06$786
Jan 2016039527.352.36$934
Dec 2015052732.362.00$1,055
Nov 2015046438.792.17$1,006
Oct 2015057443.552.43$1,393
Sep 2015059742.992.76$1,647
Aug 2015052740.162.87$1,514
Jul 2015042648.152.95$1,255
Jun 2015047256.152.88$1,361
May 2015065555.212.96$1,936
Apr 2015063649.822.71$1,721
Mar 2015035242.892.93$1,033
Feb 2015049944.662.98$1,485
Jan 2015055043.433.10$1,705
Dec 2014057654.693.59$2,069
Nov 2014052270.464.25$2,219
Oct 2014052778.303.90$2,056
Sep 2014047086.164.05$1,901
Aug 2014043989.394.04$1,771
Jul 2014046096.564.18$1,923
Jun 2014045398.164.74$2,146
May 2014048694.734.73$2,297
Apr 2014036995.944.81$1,775
Mar 2014044695.895.06$2,255
Feb 2014038697.406.19$2,390
Jan 2014050790.404.86$2,464
Dec 2013021891.824.35$949
Nov 2013040388.853.74$1,507
Oct 2013041997.423.78$1,584
Sep 20130420104.113.72$1,561
Aug 20130535104.253.52$1,885
Jul 20130585102.523.72$2,175
Jun 2013056294.403.93$2,211
May 2013049094.834.15$2,033
Apr 2013059693.964.28$2,552
Mar 2013039393.623.91$1,538
Feb 2013054791.233.42$1,871
Jan 2013055891.603.42$1,908
Dec 2012056586.773.42$1,932
Nov 2012049686.953.62$1,798
Oct 2012054689.383.40$1,856
Sep 2012054294.672.92$1,582
Aug 2012050292.662.91$1,460
Jul 2012050485.133.02$1,522
Jun 2012053979.822.52$1,358
May 2012064891.612.49$1,612
Apr 20120575101.652.00$1,148
Mar 20120590105.052.22$1,311
Feb 20120572101.102.57$1,470
Jan 2012057898.092.73$1,580
Dec 2011063596.873.24$2,057
Nov 2011058195.723.31$1,924
Oct 2011062284.983.65$2,269
Sep 2011059383.623.99$2,364
Aug 2011048383.404.15$2,004
Jul 2011048394.144.52$2,182
Jun 2011049392.904.64$2,287
May 2011060998.134.40$2,683
Apr 20110579105.964.33$2,509
Mar 2011055996.364.06$2,268
Feb 2011058685.644.18$2,449
Jan 2011063586.504.59$2,914
Dec 2010063685.734.35$2,765
Nov 2010062380.843.80$2,364
Oct 2010065678.103.51$2,302
Sep 2010065072.633.98$2,587
Aug 2010066373.684.42$2,930
Jul 2010066272.554.74$3,136
Jun 2010062470.364.91$3,064
May 2010067771.124.24$2,867
Apr 2010057981.694.12$2,387
Mar 2010068778.394.39$3,015
Feb 2010060973.585.44$3,314
Jan 2010069574.365.96$4,145
Dec 2009070971.445.48$3,888
Nov 2009071474.593.75$2,679
Oct 2009068172.544.11$2,799
Sep 2009068465.543.06$2,096
Aug 2009069067.423.22$2,221
Jul 2009072561.133.46$2,512
Jun 2009071766.163.90$2,793
May 2009074354.743.93$2,917
Apr 2009070846.773.59$2,540
Mar 2009070342.144.06$2,853
Feb 2009063432.814.63$2,937
Jan 2009072435.865.37$3,889
Dec 2008073837.105.98$4,411
Nov 2008071355.496.86$4,891
Oct 2008074875.246.92$5,178
Sep 20080502101.767.88$3,954
Aug 20080711114.228.48$6,031
Jul 20080715131.0811.39$8,143
Jun 20080703131.3313.03$9,162
May 20080722123.1711.57$8,357
Apr 20080714110.3110.45$7,465
Mar 20080660101.909.66$6,378
Feb 2008066592.538.77$5,832
Jan 2008073290.388.21$6,007
Dec 2007072488.337.30$5,287
Nov 2007072491.677.29$5,279
Oct 2007074082.856.92$5,122
Sep 2007072175.846.24$4,502
Aug 2007076269.066.39$4,868
Jul 2007075470.906.39$4,817
Jun 2007074462.007.55$5,616
May 2007076658.747.85$6,010
Apr 2007071859.617.81$5,604
Mar 2007077756.927.30$5,674
Feb 2007069355.108.22$5,694
Jan 2007075350.306.73$5,065
Dec 2006081956.656.92$5,666
Nov 2006076954.207.62$5,858
Oct 2006081254.906.01$4,883
Sep 2006075560.085.04$3,803
Aug 2006081768.717.34$5,997
Jul 2006083169.376.34$5,271
Jun 2006081966.286.38$5,228
May 2006082766.016.42$5,313
Apr 2006079964.397.36$5,881
Mar 2006084956.707.08$6,013
Feb 2006075457.597.75$5,844
Jan 2006075560.598.93$6,745
Dec 2005072954.9413.42$9,780
Nov 2005063654.6910.59$6,734
Oct 2005082858.3413.80$11,423
Sep 2005084761.4512.08$10,231
Aug 2005089861.519.80$8,798
Jul 2005078255.697.84$6,134
Jun 2005062252.337.38$4,591
May 2005062845.226.65$4,177
Apr 2005064749.207.36$4,762
Mar 2005067750.377.15$4,844
Feb 2005058445.226.31$3,686
Jan 2005057543.166.32$3,635
Dec 2004064539.866.75$4,354
Nov 2004064245.286.33$4,064
Oct 2004067649.706.52$4,404
Sep 2004075743.245.28$4,000
Aug 2004083142.375.55$4,613
Jul 2004065138.286.08$3,961
Jun 2004056736.106.43$3,648
May 2004059537.486.49$3,864
Apr 2004058334.475.86$3,415
Mar 2004083634.365.53$4,623
Feb 2004074032.455.51$4,077
Jan 2004080832.036.30$5,090
Dec 2003074830.266.30$4,714
Nov 2003072328.804.60$3,322
Oct 2003068928.174.76$3,279
Sep 2003062026.314.75$2,945
Aug 2003082429.765.13$4,227
Jul 2003062629.415.17$3,237
Jun 2003072928.565.98$4,362
May 2003081326.595.97$4,856
Apr 2003083026.675.41$4,488
Mar 2003082231.146.10$5,011
Feb 2003083033.487.93$6,578
Jan 2003098130.315.58$5,476
Dec 2002089826.914.85$4,359
Nov 2002081724.664.14$3,380
Oct 2002075326.464.23$3,185
Sep 2002081927.443.64$2,977
Aug 2002082325.963.16$2,604
Jul 2002085224.583.06$2,609
Jun 2002082923.733.34$2,767
May 2002092324.663.58$3,308
Apr 2002088423.653.51$3,105
Mar 2002086522.003.10$2,684
Feb 2002080218.222.38$1,905
Jan 2002081017.172.38$1,924
Dec 2001084616.932.36$2,000
Nov 2001088118.072.41$2,119
Oct 2001093519.782.53$2,365
Sep 2001096024.262.25$2,161
Aug 2001098724.873.05$3,013
Jul 2001094723.933.20$3,028
Jun 2001085624.563.82$3,273
May 2001094525.524.31$4,070
Apr 2001094924.685.34$5,063
Mar 200101,05824.545.38$5,688
Feb 2001095327.755.77$5,496
Jan 200101,13227.478.40$9,507
Dec 2000071426.889.12$6,513
Nov 2000062032.215.66$3,508
Oct 2000088731.235.15$4,564
Sep 2000087431.875.19$4,533
Aug 2000078729.644.54$3,574
Jul 2000098228.534.09$4,016
Jun 2000095329.304.40$4,191
May 2000095427.263.68$3,510
Apr 2000092324.513.12$2,876
Mar 2000099428.422.86$2,843
Feb 2000091627.622.73$2,497
Jan 2000099525.272.48$2,468
Dec 199901,04524.282.42$2,533
Nov 1999086623.192.43$2,108
Oct 1999074620.982.80$2,092
Sep 1999080321.752.62$2,103
Aug 1999077319.262.88$2,223
Jul 1999073217.892.37$1,737
Jun 1999072315.942.36$1,708
May 1999085215.792.32$1,978
Apr 1999079815.102.21$1,762
Mar 1999079812.471.84$1,467
Feb 199907519.981.82$1,365
Jan 1999093310.381.90$1,773
Dec 199809149.201.77$1,621
Nov 1998095810.892.19$2,094
Oct 199801,01612.421.97$2,001
Sep 199801,01412.592.08$2,112
Aug 1998089311.301.91$1,703
Jul 199801,06111.742.24$2,374
Jun 1998076811.242.24$1,718
May 1998093812.622.21$2,070
Apr 1998098313.042.51$2,463
Mar 199801,13612.802.31$2,624
Feb 1998098013.952.30$2,253
Jan 199801,09414.702.15$2,357
Dec 199701,13716.322.41$2,741
Nov 199701,11618.193.09$3,447
Oct 199701,16119.253.15$3,657
Sep 199701,11017.742.95$3,280
Aug 199701,11817.862.55$2,856
Jul 199701,03617.582.25$2,328
Jun 199701,21617.242.26$2,745
May 199701,05418.972.31$2,433
Apr 199701,34617.882.08$2,803
Mar 199701,26518.951.94$2,453
Feb 199701,14820.492.21$2,532
Jan 199701,26423.483.54$4,474
Dec 199601,27523.32$0
Nov 199601,57321.97$0
Oct 199601,54223.31$0
Sep 199601,39722.22$0
Aug 199601,53120.26$0
Jul 199601,41719.55$0
Jun 199601,29418.73$0
May 199601,12819.43$0
Apr 199601,31121.51$0
Mar 199601,30919.38$0
Feb 199601,52416.98$0
Jan 199601,79917.07$0
Dec 199501,84017.19$0
Nov 199501,79116.00$0
Oct 199501,95615.43$0
Sep 199502,02316.18$0
Aug 199502,26215.92$0
Jul 199502,39515.24$0
Jun 199502,35216.41$0
May 199502,65317.56$0
Apr 199502,87817.73$0
Mar 199503,45116.44$0
Feb 199503,29816.58$0
Jan 19950015.92$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  445 Mcf  × $  3.05 =     $1,355

────────────────────────────────────────────────────
Month total                                   $1,355

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/153572 is the state's own key, not one this site invented.