MILLSPAUGH, SARAH C. "14D"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 153622District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$803 k
Feb 1995 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
376
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111995-07-21132329
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8 bbl$509
GasProduction244,221 Mcf$802,173
Total$802,682

61,752 Mcf of this lease's gas, across 20 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5134, -101.4936. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.51341, -101.49360 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,200 ft.

Completions filed
Feb 1995
1 of 1 wells

1 well

42-1053676947,200 ftFeb 1995

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (376)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

376 months

May 20260126106.413.05$384
Apr 2026012098.932.87$344
Mar 20260089.753.15$0
Feb 2026115363.503.75$637
Jan 202617459.138.00$651
Dec 202503956.664.41$172
Nov 202515758.593.93$282
Oct 202505959.383.30$195
Sep 202507662.743.08$234
Aug 202502563.933.01$75
Jul 2025112066.743.32$465
Jun 202506466.483.13$200
May 202516460.553.23$267
Apr 202514562.363.54$222
Mar 202517467.704.27$384
Feb 202519970.884.34$501
Jan 20250074.324.28$0
Dec 202409568.993.12$297
Nov 202409769.052.20$213
Oct 202408571.372.28$194
Sep 202407169.612.36$168
Aug 202402875.632.06$58
Jul 202408779.932.15$187
Jun 20240078.082.63$0
May 202408478.812.20$185
Apr 2024024384.451.66$403
Mar 2024017280.301.55$266
Feb 202407176.091.78$127
Jan 202406573.023.30$214
Dec 202301471.262.61$37
Nov 2023013877.892.81$387
Oct 2023012785.443.09$392
Sep 2023013289.042.74$361
Aug 2023014380.522.67$382
Jul 2023010674.852.64$280
Jun 202307568.962.26$169
May 2023015170.622.23$336
Apr 202307478.122.24$166
Mar 2023015072.852.39$359
Feb 2023017575.112.47$431
Jan 2023016176.533.39$545
Dec 2022014076.415.73$802
Nov 2022016685.005.65$937
Oct 202208987.185.86$522
Sep 202205884.888.16$473
Aug 202208594.529.13$776
Jul 20220186101.587.54$1,403
Jun 20220128115.097.98$1,021
May 20220138109.378.43$1,164
Apr 20220125104.226.84$855
Mar 2022058108.885.08$294
Feb 2022013191.054.86$637
Jan 202204581.844.54$204
Dec 20210471.323.90$16
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190853.472.42$19
Sep 201901855.052.66$48
Aug 20190953.112.30$21
Jul 20190956.272.46$22
Jun 201901152.782.49$27
May 201901258.482.74$33
Apr 201906762.632.75$184
Mar 2019037256.803.06$1,139
Feb 2019034450.852.79$961
Jan 2019021146.033.23$681
Dec 2018014746.594.19$615
Nov 2018031252.934.24$1,322
Oct 2018045861.443.40$1,556
Sep 2018055159.543.11$1,713
Aug 2018014859.403.07$454
Jul 2018015565.142.93$454
Jun 2018010960.183.08$335
May 2018015865.382.90$458
Apr 2018013063.842.90$377
Mar 2018014561.222.79$404
Feb 2018013861.782.77$382
Jan 2018016062.874.01$641
Dec 2017016157.272.92$470
Nov 2017012555.423.12$390
Oct 2017013949.292.98$415
Sep 2017014447.523.09$445
Aug 2017026845.373.00$805
Jul 2017028543.873.09$880
Jun 2017028442.493.09$877
May 2017017345.373.26$565
Apr 2017015047.933.21$482
Mar 2017016846.772.98$501
Feb 2017015750.452.95$464
Jan 2017018749.413.42$639
Dec 2016020548.763.72$763
Nov 2016019342.492.64$510
Oct 2016017346.193.09$535
Sep 2016021341.553.10$660
Aug 2016017441.442.92$509
Jul 2016023841.622.92$696
Jun 2016024445.352.69$655
May 2016018142.521.99$360
Apr 2016023436.561.99$466
Mar 2016025233.011.79$452
Feb 2016024226.472.06$499
Jan 2016026927.352.36$636
Dec 2015025432.362.00$508
Nov 2015023238.792.17$503
Oct 2015021643.552.43$524
Sep 2015021142.992.76$582
Aug 2015027840.162.87$799
Jul 2015030048.152.95$884
Jun 2015018656.152.88$536
May 2015019955.212.96$588
Apr 2015014849.822.71$401
Mar 2015018842.892.93$552
Feb 2015016744.662.98$497
Jan 2015017543.433.10$543
Dec 2014016554.693.59$593
Nov 2014016970.464.25$719
Oct 2014014978.303.90$581
Sep 2014015286.164.05$615
Aug 2014014789.394.04$593
Jul 201409496.564.18$393
Jun 201409398.164.74$441
May 2014016694.734.73$785
Apr 2014016595.944.81$794
Mar 2014021495.895.06$1,082
Feb 2014023397.406.19$1,443
Jan 2014022290.404.86$1,079
Dec 2013023391.824.35$1,015
Nov 2013021988.853.74$819
Oct 2013017997.423.78$677
Sep 20130245104.113.72$911
Aug 20130243104.253.52$856
Jul 20130231102.523.72$859
Jun 2013028694.403.93$1,125
May 2013025994.834.15$1,075
Apr 2013024793.964.28$1,058
Mar 2013020293.623.91$790
Feb 2013023291.233.42$793
Jan 2013017891.603.42$609
Dec 2012018186.773.42$619
Nov 2012014586.953.62$526
Oct 2012016589.383.40$561
Sep 2012019494.672.92$566
Aug 2012012492.662.91$361
Jul 2012013385.133.02$402
Jun 2012015079.822.52$378
May 2012018691.612.49$463
Apr 20120221101.652.00$441
Mar 20120244105.052.22$542
Feb 20120249101.102.57$640
Jan 2012027198.092.73$741
Dec 2011028896.873.24$933
Nov 2011023795.723.31$785
Oct 2011041184.983.65$1,500
Sep 2011044283.623.99$1,762
Aug 2011049883.404.15$2,066
Jul 2011050994.144.52$2,299
Jun 2011050092.904.64$2,320
May 2011053598.134.40$2,357
Apr 20110494105.964.33$2,141
Mar 2011048296.364.06$1,956
Feb 2011046585.644.18$1,944
Jan 2011053186.504.59$2,437
Dec 2010051385.734.35$2,230
Nov 2010050080.843.80$1,898
Oct 2010052478.103.51$1,839
Sep 2010051672.633.98$2,053
Aug 2010054073.684.42$2,386
Jul 2010056772.554.74$2,686
Jun 2010055870.364.91$2,740
May 2010061171.124.24$2,588
Apr 2010050881.694.12$2,094
Mar 2010057678.394.39$2,528
Feb 2010048973.585.44$2,661
Jan 2010048074.365.96$2,863
Dec 2009050371.445.48$2,758
Nov 2009053774.593.75$2,015
Oct 2009057072.544.11$2,343
Sep 2009056365.543.06$1,725
Aug 2009058367.423.22$1,876
Jul 2009059361.133.46$2,054
Jun 2009059966.163.90$2,333
May 2009062854.743.93$2,465
Apr 2009059646.773.59$2,138
Mar 2009058642.144.06$2,379
Feb 2009055732.814.63$2,581
Jan 2009053335.865.37$2,863
Dec 2008061637.105.98$3,682
Nov 2008056755.496.86$3,890
Oct 2008063275.246.92$4,375
Sep 20080417101.767.88$3,285
Aug 20080616114.228.48$5,226
Jul 20080669131.0811.39$7,620
Jun 20080622131.3313.03$8,106
May 20080677123.1711.57$7,836
Apr 20080544110.3110.45$5,687
Mar 20080620101.909.66$5,992
Feb 2008060992.538.77$5,341
Jan 2008068190.388.21$5,588
Dec 2007069688.337.30$5,082
Nov 2007065091.677.29$4,740
Oct 2007063682.856.92$4,402
Sep 2007044675.846.24$2,785
Aug 2007040469.066.39$2,581
Jul 2007069770.906.39$4,452
Jun 2007051962.007.55$3,918
May 2007062658.747.85$4,912
Apr 2007056059.617.81$4,371
Mar 2007066056.927.30$4,819
Feb 2007058655.108.22$4,815
Jan 2007070550.306.73$4,742
Dec 2006073256.656.92$5,064
Nov 2006068654.207.62$5,226
Oct 2006075954.906.01$4,564
Sep 2006056560.085.04$2,846
Aug 2006060068.717.34$4,404
Jul 2006071569.376.34$4,535
Jun 2006070066.286.38$4,469
May 2006079266.016.42$5,089
Apr 2006059964.397.36$4,409
Mar 2006063156.707.08$4,469
Feb 2006055657.597.75$4,310
Jan 2006067660.598.93$6,039
Dec 2005077654.9413.42$10,410
Nov 2005069854.6910.59$7,391
Oct 2005077158.3413.80$10,637
Sep 2005080361.4512.08$9,699
Aug 2005086761.519.80$8,494
Jul 2005085255.697.84$6,683
Jun 2005068752.337.38$5,071
May 2005067045.226.65$4,456
Apr 2005082449.207.36$6,065
Mar 2005071450.377.15$5,109
Feb 2005059145.226.31$3,730
Jan 2005075743.166.32$4,786
Dec 2004076239.866.75$5,144
Nov 2004081345.286.33$5,147
Oct 2004081049.706.52$5,277
Sep 2004075743.245.28$4,000
Aug 2004084742.375.55$4,701
Jul 2004088538.286.08$5,385
Jun 2004092136.106.43$5,925
May 2004063637.486.49$4,131
Apr 2004056234.475.86$3,292
Mar 2004090734.365.53$5,016
Feb 2004076832.455.51$4,231
Jan 2004089432.036.30$5,632
Dec 2003080930.266.30$5,098
Nov 2003087828.804.60$4,035
Oct 2003094528.174.76$4,498
Sep 2003091226.314.75$4,331
Aug 2003094329.765.13$4,837
Jul 2003096229.415.17$4,974
Jun 2003090528.565.98$5,415
May 2003092626.595.97$5,531
Apr 2003090426.675.41$4,888
Mar 2003095131.146.10$5,797
Feb 2003086133.487.93$6,824
Jan 2003095430.315.58$5,325
Dec 2002097226.914.85$4,718
Nov 2002099624.664.14$4,120
Oct 200201,03626.464.23$4,381
Sep 200201,01027.443.64$3,672
Aug 2002099825.963.16$3,158
Jul 200201,10924.583.06$3,395
Jun 200201,01623.733.34$3,392
May 200201,06824.663.58$3,828
Apr 200201,04823.653.51$3,681
Mar 200201,01422.003.10$3,146
Feb 2002092718.222.38$2,202
Jan 200201,06717.172.38$2,535
Dec 2001092616.932.36$2,189
Nov 2001092618.072.41$2,228
Oct 200101,10419.782.53$2,792
Sep 2001090224.262.25$2,031
Aug 2001097424.873.05$2,974
Jul 200101,04223.933.20$3,331
Jun 2001091324.563.82$3,491
May 2001099725.524.31$4,294
Apr 2001094224.685.34$5,026
Mar 200101,03224.545.38$5,548
Feb 200101,04427.755.77$6,021
Jan 200101,10727.478.40$9,297
Dec 200001,02526.889.12$9,351
Nov 2000094932.215.66$5,369
Oct 200001,14331.235.15$5,881
Sep 200001,10131.875.19$5,710
Aug 200001,03629.644.54$4,704
Jul 200001,03628.534.09$4,237
Jun 200001,00029.304.40$4,397
May 200001,09727.263.68$4,037
Apr 200001,10324.513.12$3,437
Mar 200001,10328.422.86$3,154
Feb 200001,13227.622.73$3,086
Jan 200001,13925.272.48$2,825
Dec 199901,16724.282.42$2,828
Nov 199901,09523.192.43$2,665
Oct 199901,11720.982.80$3,132
Sep 199901,04521.752.62$2,737
Aug 199901,22819.262.88$3,531
Jul 199901,24317.892.37$2,949
Jun 199901,21515.942.36$2,870
May 199901,29015.792.32$2,994
Apr 199901,03415.102.21$2,283
Mar 199901,25212.471.84$2,302
Feb 199901,1419.981.82$2,074
Jan 199901,24110.381.90$2,358
Dec 199801,2619.201.77$2,236
Nov 199801,28510.892.19$2,809
Oct 199801,32612.421.97$2,611
Sep 199801,36912.592.08$2,851
Aug 199801,51511.301.91$2,890
Jul 199801,61311.742.24$3,609
Jun 199801,40611.242.24$3,146
May 199801,48612.622.21$3,279
Apr 199801,49513.042.51$3,745
Mar 199801,51812.802.31$3,506
Feb 199801,41513.952.30$3,253
Jan 199801,36914.702.15$2,950
Dec 199701,77716.322.41$4,285
Nov 199701,44318.193.09$4,456
Oct 199701,36219.253.15$4,290
Sep 199701,64617.742.95$4,864
Aug 199701,80017.862.55$4,599
Jul 199701,75617.582.25$3,946
Jun 199701,45817.242.26$3,291
May 199701,60418.972.31$3,703
Apr 199701,60217.882.08$3,337
Mar 199702,02218.951.94$3,921
Feb 199701,89720.492.21$4,185
Jan 199702,16923.483.54$7,678
Dec 199602,23023.32$0
Nov 199602,23421.97$0
Oct 199602,32123.31$0
Sep 199602,27622.22$0
Aug 199602,34720.26$0
Jul 199602,53819.55$0
Jun 199602,81318.73$0
May 199603,00819.43$0
Apr 199603,40321.51$0
Mar 199602,85819.38$0
Feb 199602,36816.98$0
Jan 19960017.07$0
Dec 199502,30417.19$0
Nov 199502,34716.00$0
Oct 199502,95615.43$0
Sep 199503,22116.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 199504,20916.41$0
May 199504,77117.56$0
Apr 199505,28717.73$0
Mar 199507,19416.44$0
Feb 199501,06716.58$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  126 Mcf  × $  3.05 =       $384

────────────────────────────────────────────────────
Month total                                     $384

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/153622 is the state's own key, not one this site invented.