Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA, NE. (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 154290District 7CField 679980752 tax incentive programmesGasSaveExport
Value, all time
$213 k
Mar 1995 – May 2026
Value, last 12 filed months
$689
at the published price for each month
Months reported
375
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 800 leases and 804 wells, and the rule below applies to all of them.

Discovered
1995-10-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1997-02-27.

The Commission's schedule remark for this field reads: 38. DOCKET 7C-0214353 EFF 2/27/97 SIGNED 2/4/97

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111995-08-03132408
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction69,834 Mcf$212,902
Total$212,902

19,653 Mcf of this lease's gas, across 21 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7108, -101.1710. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.71075, -101.17100 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,700 ft.

Completions filed
Mar 1995
1 of 1 wells

1 well

42-1053675356,700 ftMar 1995

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (375)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

375 months

May 202618106.413.05$55
Apr 20261698.932.87$46
Mar 2026089.753.15$0
Feb 20261563.503.75$56
Jan 20261659.138.00$128
Dec 20251856.664.41$79
Nov 20251758.593.93$67
Oct 2025459.383.30$13
Sep 20252162.743.08$65
Aug 20252963.933.01$87
Jul 2025866.743.32$27
Jun 20252166.483.13$66
May 20252060.553.23$65
Apr 20255062.363.54$177
Mar 20254867.704.27$205
Feb 202510770.884.34$464
Jan 202512874.324.28$548
Dec 202416168.993.12$503
Nov 202415369.052.20$336
Oct 20247271.372.28$164
Sep 20242769.612.36$64
Aug 20241975.632.06$39
Jul 20242579.932.15$54
Jun 20245478.082.63$142
May 20242478.812.20$53
Apr 20246184.451.66$101
Mar 202414380.301.55$221
Feb 202414276.091.78$253
Jan 202414673.023.30$481
Dec 20232771.262.61$70
Nov 20233777.892.81$104
Oct 20233985.443.09$120
Sep 20232189.042.74$57
Aug 20231180.522.67$29
Jul 20231774.852.64$45
Jun 20232168.962.26$47
May 20238870.622.23$196
Apr 202318578.122.24$414
Mar 20233072.852.39$72
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 20221676.415.73$92
Nov 2022485.005.65$23
Oct 202270887.185.86$4,152
Sep 202270584.888.16$5,755
Aug 202272894.529.13$6,645
Jul 2022753101.587.54$5,679
Jun 2022684115.097.98$5,456
May 2022762109.378.43$6,426
Apr 2022685104.226.84$4,684
Mar 2022675108.885.08$3,427
Feb 202253791.054.86$2,609
Jan 202253581.844.54$2,428
Dec 202112171.323.90$472
Nov 2021077.435.24$0
Oct 2021979.795.71$51
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021670.783.98$24
Jun 20211169.493.38$37
May 20211863.483.02$54
Apr 20211760.362.76$47
Mar 20211561.302.72$41
Feb 20211657.805.55$89
Jan 20211150.412.81$31
Dec 20201044.642.68$27
Nov 20201438.772.71$38
Oct 20201436.972.48$35
Sep 2020937.091.99$18
Aug 2020439.982.39$10
Jul 2020238.371.83$4
Jun 2020534.901.69$8
May 20201016.921.81$18
Apr 20201414.751.80$25
Mar 2020830.341.86$15
Feb 2020049.881.98$0
Jan 20201357.252.09$27
Dec 20193859.012.30$88
Nov 20191855.302.75$50
Oct 20194353.472.42$104
Sep 20196855.052.66$181
Aug 2019653.112.30$14
Jul 2019856.272.46$20
Jun 2019952.782.49$22
May 20192458.482.74$66
Apr 2019362.632.75$8
Mar 20192856.803.06$86
Feb 20192750.852.79$75
Jan 20195146.033.23$165
Dec 2018046.594.19$0
Nov 20185352.934.24$225
Oct 20185361.443.40$180
Sep 20184959.543.11$152
Aug 20184959.403.07$150
Jul 20184965.142.93$144
Jun 20184560.183.08$138
May 20185365.382.90$154
Apr 20185363.842.90$154
Mar 20185561.222.79$153
Feb 20185061.782.77$138
Jan 20185662.874.01$225
Dec 20175457.272.92$158
Nov 20176355.423.12$196
Oct 20176249.292.98$185
Sep 20175747.523.09$176
Aug 20175945.373.00$177
Jul 20175743.873.09$176
Jun 20175442.493.09$167
May 20175645.373.26$183
Apr 20175847.933.21$186
Mar 20176046.772.98$179
Feb 20175550.452.95$162
Jan 20176149.413.42$209
Dec 20166248.763.72$231
Nov 20166142.492.64$161
Oct 20166046.193.09$185
Sep 20165941.553.10$183
Aug 20165941.442.92$173
Jul 20165241.622.92$152
Jun 2016745.352.69$19
May 20161542.521.99$30
Apr 20163236.561.99$64
Mar 20164533.011.79$81
Feb 20162626.472.06$54
Jan 20163527.352.36$83
Dec 20153832.362.00$76
Nov 20154138.792.17$89
Oct 20153943.552.43$95
Sep 20151642.992.76$44
Aug 20152940.162.87$83
Jul 20153448.152.95$100
Jun 2015056.152.88$0
May 20152055.212.96$59
Apr 20154049.822.71$108
Mar 20152542.892.93$73
Feb 20152544.662.98$74
Jan 20153643.433.10$112
Dec 20143054.693.59$108
Nov 20143170.464.25$132
Oct 20143678.303.90$140
Sep 20142586.164.05$101
Aug 20142689.394.04$105
Jul 20142196.564.18$88
Jun 20142398.164.74$109
May 20143894.734.73$180
Apr 20143495.944.81$164
Mar 20143595.895.06$177
Feb 20143097.406.19$186
Jan 20143290.404.86$156
Dec 20133391.824.35$144
Nov 20133588.853.74$131
Oct 20133197.423.78$117
Sep 201320104.113.72$74
Aug 201320104.253.52$70
Jul 201328102.523.72$104
Jun 20132794.403.93$106
May 20136094.834.15$249
Apr 20135093.964.28$214
Mar 20135693.623.91$219
Feb 20133791.233.42$127
Jan 20134491.603.42$150
Dec 20125386.773.42$181
Nov 20129286.953.62$334
Oct 2012089.383.40$0
Sep 20122294.672.92$64
Aug 2012492.662.91$12
Jul 2012885.133.02$24
Jun 2012579.822.52$13
May 20121791.612.49$42
Apr 201220101.652.00$40
Mar 201225105.052.22$56
Feb 201235101.102.57$90
Jan 20123598.092.73$96
Dec 20115496.873.24$175
Nov 20113195.723.31$103
Oct 20112284.983.65$80
Sep 20111383.623.99$52
Aug 2011583.404.15$21
Jul 2011594.144.52$23
Jun 2011692.904.64$28
May 20111898.134.40$79
Apr 201116105.964.33$69
Mar 20113896.364.06$154
Feb 20113885.644.18$159
Jan 20113986.504.59$179
Dec 20105085.734.35$217
Nov 20103680.843.80$137
Oct 20103978.103.51$137
Sep 20103372.633.98$131
Aug 20102773.684.42$119
Jul 20103572.554.74$166
Jun 20102670.364.91$128
May 20102771.124.24$114
Apr 20103781.694.12$153
Mar 20103878.394.39$167
Feb 20104573.585.44$245
Jan 20103774.365.96$221
Dec 20094471.445.48$241
Nov 20093574.593.75$131
Oct 20092772.544.11$111
Sep 20092765.543.06$83
Aug 20092267.423.22$71
Jul 20092761.133.46$94
Jun 20093566.163.90$136
May 20094754.743.93$185
Apr 20094246.773.59$151
Mar 20094242.144.06$170
Feb 20094032.814.63$185
Jan 20095035.865.37$269
Dec 20082137.105.98$126
Nov 20082555.496.86$172
Oct 20083675.246.92$249
Sep 200830101.767.88$236
Aug 200868114.228.48$577
Jul 200855131.0811.39$626
Jun 200852131.3313.03$678
May 200852123.1711.57$602
Apr 200848110.3110.45$502
Mar 200884101.909.66$812
Feb 20081892.538.77$158
Jan 20083290.388.21$263
Dec 20073688.337.30$263
Nov 20077191.677.29$518
Oct 200712382.856.92$851
Sep 20073775.846.24$231
Aug 200710969.066.39$696
Jul 200716870.906.39$1,073
Jun 200712162.007.55$913
May 20079658.747.85$753
Apr 20078959.617.81$695
Mar 200712356.927.30$898
Feb 20073955.108.22$320
Jan 20076150.306.73$410
Dec 20066656.656.92$457
Nov 20067154.207.62$541
Oct 20067854.906.01$469
Sep 200610160.085.04$509
Aug 20067768.717.34$565
Jul 200611769.376.34$742
Jun 200614066.286.38$894
May 200614266.016.42$912
Apr 200613964.397.36$1,023
Mar 200612456.707.08$878
Feb 200613757.597.75$1,062
Jan 200613060.598.93$1,161
Dec 200512354.9413.42$1,650
Nov 200512954.6910.59$1,366
Oct 2005058.3413.80$0
Sep 20051561.4512.08$181
Aug 2005061.519.80$0
Jul 20052355.697.84$180
Jun 200511652.337.38$856
May 200511745.226.65$778
Apr 20055149.207.36$375
Mar 20057850.377.15$558
Feb 200512045.226.31$757
Jan 200511043.166.32$695
Dec 20048039.866.75$540
Nov 20045645.286.33$355
Oct 20047349.706.52$476
Sep 200416043.245.28$845
Aug 200410742.375.55$594
Jul 200416638.286.08$1,010
Jun 200428836.106.43$1,853
May 200415537.486.49$1,007
Apr 200425234.475.86$1,476
Mar 200436434.365.53$2,013
Feb 200443032.455.51$2,369
Jan 200425532.036.30$1,606
Dec 200324430.266.30$1,538
Nov 200329528.804.60$1,356
Oct 200314528.174.76$690
Sep 200321226.314.75$1,007
Aug 200328929.765.13$1,482
Jul 200335629.415.17$1,841
Jun 200330028.565.98$1,795
May 200330226.595.97$1,804
Apr 200336026.675.41$1,947
Mar 200332231.146.10$1,963
Feb 200332433.487.93$2,568
Jan 200329030.315.58$1,619
Dec 200230926.914.85$1,500
Nov 200233724.664.14$1,394
Oct 200232026.464.23$1,353
Sep 200219027.443.64$691
Aug 200224425.963.16$772
Jul 200235524.583.06$1,087
Jun 200231023.733.34$1,035
May 200215224.663.58$545
Apr 20028423.653.51$295
Mar 200224622.003.10$763
Feb 200217218.222.38$409
Jan 200219317.172.38$459
Dec 200115416.932.36$364
Nov 200114818.072.41$356
Oct 200132119.782.53$812
Sep 200121124.262.25$475
Aug 200133724.873.05$1,029
Jul 200124123.933.20$771
Jun 200123824.563.82$910
May 200142425.524.31$1,826
Apr 200141624.685.34$2,219
Mar 200131624.545.38$1,699
Feb 200119027.755.77$1,096
Jan 200120427.478.40$1,713
Dec 200030726.889.12$2,801
Nov 200029332.215.66$1,658
Oct 200031931.235.15$1,641
Sep 200034731.875.19$1,800
Aug 200036429.644.54$1,653
Jul 200025528.534.09$1,043
Jun 200020929.304.40$919
May 200015227.263.68$559
Apr 200018624.513.12$580
Mar 200019728.422.86$563
Feb 200020627.622.73$562
Jan 200031525.272.48$781
Dec 199924924.282.42$604
Nov 199928223.192.43$686
Oct 199927020.982.80$757
Sep 199936121.752.62$945
Aug 199934719.262.88$998
Jul 199934017.892.37$807
Jun 199932415.942.36$765
May 199941315.792.32$959
Apr 199939115.102.21$863
Mar 199943412.471.84$798
Feb 19994349.981.82$789
Jan 199945310.381.90$861
Dec 19982949.201.77$521
Nov 199837210.892.19$813
Oct 199830912.421.97$608
Sep 199821212.592.08$442
Aug 199822311.301.91$425
Jul 199837111.742.24$830
Jun 199847411.242.24$1,060
May 199855912.622.21$1,233
Apr 199849013.042.51$1,228
Mar 199857012.802.31$1,316
Feb 199858413.952.30$1,343
Jan 199856814.702.15$1,224
Dec 199756116.322.41$1,353
Nov 199758018.193.09$1,791
Oct 199756519.253.15$1,780
Sep 199754017.742.95$1,596
Aug 199753517.862.55$1,367
Jul 199763317.582.25$1,422
Jun 199764817.242.26$1,463
May 199773918.972.31$1,706
Apr 199779217.882.08$1,650
Mar 19971,04618.951.94$2,028
Feb 199770820.492.21$1,562
Jan 199775623.483.54$2,676
Dec 199674323.32$0
Nov 199698021.97$0
Oct 199688623.31$0
Sep 199685622.22$0
Aug 199676920.26$0
Jul 199689519.55$0
Jun 19961,03918.73$0
May 19961,16519.43$0
Apr 19961,08821.51$0
Mar 199681719.38$0
Feb 199679716.98$0
Jan 199689917.07$0
Dec 19951,17317.19$0
Nov 199566616.00$0
Oct 19951,13815.43$0
Sep 199511416.18$0
Aug 199590215.92$0
Jul 19951,19015.24$0
Jun 19951,29016.41$0
May 19951,56817.56$0
Apr 199567817.73$0
Mar 1995016.44$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                   18 Mcf  × $  3.05 =        $55

────────────────────────────────────────────────────
Month total                                      $55

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/154290 is the state's own key, not one this site invented.