WARD, RIP

Operated by OZARK EXPLORATION, INC. (P-5 630611) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 154852District 7CField 81267333CondensateGasSaveExport
Value, all time
$360 k
Jun 1995 – Sep 2019
Value, last 12 filed months
$0
at the published price for each month
Months reported
292
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition315 bbl$6,268
GasProduction107,675 Mcf$353,780
Total$360,049

29,164 Mcf of this lease's gas, across 19 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5600, -100.6629. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.55999, -100.66293 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,420 ft
1 wells filed one
Completion to plug
24.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,420 ft.

Completions filed
Jun 1995
1 of 1 wells
Plug dates filed
Sep 2019
1 of 1 wells

Last completion to plug: a median of 24.3 years across the 1 well that filed both dates, with the middle half between 24.3 years and 24.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4353451430926,420 ftJun 1995Sep 2019Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (292)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

292 months

Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160141.442.92$3
Jul 20160141.622.92$3
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160127.352.36$2
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150140.162.87$3
Jul 20150048.152.95$0
Jun 20150556.152.88$14
May 201501455.212.96$41
Apr 20150649.822.71$16
Mar 20150042.892.93$0
Feb 20150144.662.98$3
Jan 20150143.433.10$3
Dec 20140154.693.59$4
Nov 20140170.464.25$4
Oct 20140178.303.90$4
Sep 20140186.164.05$4
Aug 20140089.394.04$0
Jul 20140196.564.18$4
Jun 20140198.164.74$5
May 20140194.734.73$5
Apr 20140195.944.81$5
Mar 20140195.895.06$5
Feb 20140197.406.19$6
Jan 20140290.404.86$10
Dec 20130291.824.35$9
Nov 20130288.853.74$7
Oct 20130297.423.78$8
Sep 201303104.113.72$11
Aug 201301104.253.52$4
Jul 201302102.523.72$7
Jun 20130194.403.93$4
May 20130194.834.15$4
Apr 20130193.964.28$4
Mar 20130193.623.91$4
Feb 20130191.233.42$3
Jan 20130291.603.42$7
Dec 20120186.773.42$3
Nov 20120186.953.62$4
Oct 20120189.383.40$3
Sep 20120294.672.92$6
Aug 201201292.662.91$35
Jul 20120485.133.02$12
Jun 20120679.822.52$15
May 20120691.612.49$15
Apr 201201101.652.00$2
Mar 201207105.052.22$16
Feb 201208101.102.57$21
Jan 201201198.092.73$30
Dec 20110096.873.24$0
Nov 20110295.723.31$7
Oct 20110484.983.65$15
Sep 201101083.623.99$40
Aug 201101183.404.15$46
Jul 201101394.144.52$59
Jun 201103092.904.64$139
May 201102498.134.40$106
Apr 2011043105.964.33$186
Mar 201103396.364.06$134
Feb 201104985.644.18$205
Jan 201106686.504.59$303
Dec 201005985.734.35$257
Nov 201008580.843.80$323
Oct 201008178.103.51$284
Sep 2010010172.633.98$402
Aug 201009973.684.42$438
Jul 201007572.554.74$355
Jun 201007970.364.91$388
May 201008271.124.24$347
Apr 201009581.694.12$392
Mar 2010012178.394.39$531
Feb 2010011573.585.44$626
Jan 2010011474.365.96$680
Dec 2009011471.445.48$625
Nov 2009010574.593.75$394
Oct 200908972.544.11$366
Sep 200908065.543.06$245
Aug 2009012967.423.22$415
Jul 2009013861.133.46$478
Jun 2009010966.163.90$425
May 2009014454.743.93$565
Apr 2009014446.773.59$517
Mar 2009015442.144.06$625
Feb 2009014032.814.63$649
Jan 2009015335.865.37$822
Dec 2008016037.105.98$956
Nov 2008017255.496.86$1,180
Oct 2008018375.246.92$1,267
Sep 20080197101.767.88$1,552
Aug 20080185114.228.48$1,569
Jul 20080184131.0811.39$2,096
Jun 20080165131.3313.03$2,150
May 20080193123.1711.57$2,234
Apr 20080193110.3110.45$2,018
Mar 20080215101.909.66$2,078
Feb 2008019192.538.77$1,675
Jan 2008020590.388.21$1,682
Dec 2007018288.337.30$1,329
Nov 2007022391.677.29$1,626
Oct 2007022882.856.92$1,578
Sep 2007024775.846.24$1,542
Aug 2007026069.066.39$1,661
Jul 2007028070.906.39$1,789
Jun 2007030362.007.55$2,287
May 2007029658.747.85$2,323
Apr 2007049759.617.81$3,879
Mar 2007062756.927.30$4,578
Feb 2007050155.108.22$4,116
Jan 2007054150.306.73$3,639
Dec 2006050256.656.92$3,473
Nov 2006031654.207.62$2,407
Oct 2006034654.906.01$2,081
Sep 2006036060.085.04$1,813
Aug 2006032368.717.34$2,371
Jul 2006026969.376.34$1,706
Jun 2006030766.286.38$1,960
May 2006015166.016.42$970
Apr 2006026664.397.36$1,958
Mar 2006034156.707.08$2,415
Feb 2006034657.597.75$2,682
Jan 2006033260.598.93$2,966
Dec 2005044054.9413.42$5,903
Nov 2005044954.6910.59$4,754
Oct 2005038558.3413.80$5,311
Sep 2005041861.4512.08$5,049
Aug 2005055361.519.80$5,418
Jul 2005051855.697.84$4,063
Jun 2005044352.337.38$3,270
May 2005042345.226.65$2,813
Apr 2005056349.207.36$4,144
Mar 2005048850.377.15$3,492
Feb 2005036645.226.31$2,310
Jan 2005044643.166.32$2,820
Dec 2004075139.866.75$5,070
Nov 2004057245.286.33$3,621
Oct 2004041149.706.52$2,678
Sep 2004064143.245.28$3,387
Aug 2004266642.375.55$3,781
Jul 2004043538.286.08$2,647
Jun 2004090436.106.43$5,815
May 2004058137.486.49$3,773
Apr 2004049434.475.86$2,894
Mar 2004069334.365.53$3,832
Feb 2004066432.455.51$3,658
Jan 2004045032.036.30$2,835
Dec 2003044430.266.30$2,798
Nov 2003062628.804.60$2,877
Oct 2003044028.174.76$2,094
Sep 2003054726.314.75$2,598
Aug 2003049629.765.13$2,544
Jul 2003069929.415.17$3,614
Jun 2003048228.565.98$2,884
May 2003039326.595.97$2,347
Apr 2003035626.675.41$1,925
Mar 2003037431.146.10$2,280
Feb 2003050633.487.93$4,011
Jan 2003059030.315.58$3,293
Dec 2002050526.914.85$2,451
Nov 2002056224.664.14$2,325
Oct 2002063926.464.23$2,702
Sep 2002043827.443.64$1,592
Aug 2002143425.963.16$1,399
Jul 2002124224.583.06$766
Jun 2002032023.733.34$1,068
May 2002117424.663.58$648
Apr 2002021823.653.51$766
Mar 2002221022.003.10$696
Feb 200219318.222.38$239
Jan 2002228317.172.38$707
Dec 2001334216.932.36$859
Nov 2001115518.072.41$391
Oct 2001130219.782.53$784
Sep 2001256724.262.25$1,325
Aug 2001355824.873.05$1,778
Jul 2001144423.933.20$1,443
Jun 2001023024.563.82$880
May 2001140725.524.31$1,779
Apr 2001346724.685.34$2,566
Mar 2001249124.545.38$2,689
Feb 2001073927.755.77$4,262
Jan 2001027427.478.40$2,301
Dec 2000237626.889.12$3,484
Nov 2000267532.215.66$3,884
Oct 2000167831.235.15$3,520
Sep 2000347931.875.19$2,580
Aug 2000258129.644.54$2,697
Jul 2000187828.534.09$3,619
Jun 2000052729.304.40$2,317
May 2000252427.263.68$1,983
Apr 2000140924.513.12$1,299
Mar 2000141628.422.86$1,218
Feb 2000144827.622.73$1,249
Jan 2000058225.272.48$1,444
Dec 1999254924.282.42$1,379
Nov 1999255223.192.43$1,390
Oct 1999057420.982.80$1,609
Sep 1999062221.752.62$1,629
Aug 1999153019.262.88$1,543
Jul 1999058317.892.37$1,383
Jun 1999257315.942.36$1,385
May 1999084315.792.32$1,957
Apr 1999485315.102.21$1,944
Mar 199911,09312.471.84$2,022
Feb 199907939.981.82$1,442
Jan 1999097010.381.90$1,843
Dec 199808109.201.77$1,436
Nov 199801,15310.892.19$2,520
Oct 199881,06612.421.97$2,199
Sep 199841,02212.592.08$2,179
Aug 199801,15311.301.91$2,199
Jul 199811,04911.742.24$2,359
Jun 1998191111.242.24$2,049
May 199851,19512.622.21$2,700
Apr 1998299513.042.51$2,519
Mar 199821,01212.802.31$2,363
Feb 199801,14413.952.30$2,630
Jan 1998452014.702.15$1,179
Dec 1997688716.322.41$2,237
Nov 1997788718.193.09$2,867
Oct 199751,00919.253.15$3,274
Sep 1997382117.742.95$2,479
Aug 1997179017.862.55$2,036
Jul 1997258817.582.25$1,356
Jun 1997359217.242.26$1,388
May 1997254118.972.31$1,287
Apr 1997289317.882.08$1,896
Mar 1997697918.951.94$2,012
Feb 199701,00820.492.21$2,224
Jan 199701,27823.483.54$4,524
Dec 19961180823.32$257
Nov 19963486921.97$747
Oct 1996251,20223.31$583
Sep 199641,18922.22$89
Aug 199631,29620.26$61
Jul 1996201,24419.55$391
Jun 199611,31718.73$19
May 199671,50419.43$136
Apr 1996221,30121.51$473
Mar 199681,74619.38$155
Feb 1996151,15716.98$255
Jan 1996132,27617.07$222
Dec 1995112,26117.19$189
Nov 1995221,48416.00$352
Oct 199501,89915.43$0
Sep 199501,93216.18$0
Aug 199501,89315.92$0
Jul 199503,23515.24$0
Jun 1995055116.41$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2016 — as filed, then multipliedworked
Condensate             0 bbl  × $ 41.44 =         $0
Gas                    1 Mcf  × $  2.92 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/154852 is the state's own key, not one this site invented.