HELBING, RUBY 25A

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA, NE. (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 156787District 7CField 679980752 tax incentive programmesCondensateGasSaveExport
Value, all time
$778 k
Oct 1995 – May 2026
Value, last 12 filed months
$12 k
at the published price for each month
Months reported
368
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 800 leases and 804 wells, and the rule below applies to all of them.

Discovered
1995-10-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1997-02-27.

The Commission's schedule remark for this field reads: 38. DOCKET 7C-0214353 EFF 2/27/97 SIGNED 2/4/97

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111996-03-05134193
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition678 bbl$40,985
GasProduction211,511 Mcf$736,568
Total$777,553

35,838 Mcf of this lease's gas, across 15 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6234, -101.2404. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.62336, -101.24042 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,800 ft.

Completions filed
Oct 1995
1 of 1 wells

1 well

42-1053679726,800 ftOct 1995

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (368)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

368 months

May 20262286106.413.05$1,084
Apr 2026034398.932.87$984
Mar 20260089.753.15$0
Feb 2026421863.503.75$1,072
Jan 2026224859.138.00$2,102
Dec 2025225356.664.41$1,230
Nov 2025228958.593.93$1,252
Oct 2025214459.383.30$595
Sep 2025024562.743.08$754
Aug 2025227363.933.01$951
Jul 2025226066.743.32$995
Jun 2025225566.483.13$931
May 2025026260.553.23$847
Apr 2025019762.363.54$698
Mar 2025033667.704.27$1,434
Feb 2025024970.884.34$1,081
Jan 2025425574.324.28$1,388
Dec 20241231468.993.12$1,808
Nov 2024632069.052.20$1,118
Oct 2024533471.372.28$1,119
Sep 2024025169.612.36$593
Aug 2024633775.632.06$1,149
Jul 2024533379.932.15$1,114
Jun 2024632778.082.63$1,330
May 2024633578.812.20$1,209
Apr 2024632484.451.66$1,044
Mar 2024631180.301.55$962
Feb 2024625776.091.78$915
Jan 20241226073.023.30$1,734
Dec 2023629371.262.61$1,193
Nov 20231225377.892.81$1,645
Oct 2023621685.443.09$1,179
Sep 2023525789.042.74$1,148
Aug 2023625480.522.67$1,162
Jul 2023025074.852.64$660
Jun 2023624268.962.26$960
May 20231225170.622.23$1,407
Apr 2023624778.122.24$1,021
Mar 2023624972.852.39$1,033
Feb 20231222475.112.47$1,454
Jan 2023624676.533.39$1,293
Dec 2022623676.415.73$1,811
Nov 2022624585.005.65$1,893
Oct 2022525287.185.86$1,914
Sep 2022524984.888.16$2,457
Aug 2022625694.529.13$2,904
Jul 20226258101.587.54$2,555
Jun 20225259115.097.98$2,642
May 20220272109.378.43$2,294
Apr 20226242104.226.84$2,280
Mar 202213268108.885.08$2,776
Feb 2022624191.054.86$1,717
Jan 2022626081.844.54$1,671
Dec 2021626571.323.90$1,461
Nov 20211126677.435.24$2,245
Oct 2021027679.795.71$1,577
Sep 2021525469.865.35$1,708
Aug 2021625266.024.22$1,460
Jul 2021626370.783.98$1,472
Jun 2021626069.493.38$1,296
May 2021624563.483.02$1,120
Apr 2021626060.362.76$1,079
Mar 20211028261.302.72$1,379
Feb 2021615757.805.55$1,218
Jan 2021625850.412.81$1,028
Dec 20201225744.642.68$1,223
Nov 2020625138.772.71$912
Oct 2020626736.972.48$884
Sep 2020626237.091.99$744
Aug 2020526639.982.39$834
Jul 2020026438.371.83$482
Jun 2020526334.901.69$619
May 2020528316.921.81$598
Apr 2020523814.751.80$503
Mar 2020624430.341.86$635
Feb 20201225749.881.98$1,108
Jan 2020626157.252.09$890
Dec 20191227359.012.30$1,337
Nov 2019626755.302.75$1,066
Oct 2019627553.472.42$986
Sep 2019626955.052.66$1,045
Aug 2019627953.112.30$962
Jul 2019526956.272.46$943
Jun 2019530252.782.49$1,016
May 2019550858.482.74$1,684
Apr 201904062.632.75$110
Mar 2019526856.803.06$1,105
Feb 2019529550.852.79$1,078
Jan 20191129646.033.23$1,462
Dec 2018033246.594.19$1,390
Nov 2018529652.934.24$1,519
Oct 2018532361.443.40$1,405
Sep 2018033259.543.11$1,032
Aug 2018534659.403.07$1,358
Jul 2018333665.142.93$1,181
Jun 2018029760.183.08$914
May 2018531365.382.90$1,235
Apr 2018534363.842.90$1,314
Mar 2018336661.222.79$1,204
Feb 20181136461.782.77$1,686
Jan 20181131962.874.01$1,971
Dec 20171132057.272.92$1,565
Nov 2017533455.423.12$1,319
Oct 2017032249.292.98$961
Sep 2017326647.523.09$964
Aug 2017325645.373.00$905
Jul 2017326543.873.09$950
Jun 2017324842.493.09$893
May 2017425645.373.26$1,017
Apr 2017826247.933.21$1,225
Mar 20171130446.772.98$1,422
Feb 2017528050.452.95$1,079
Jan 2017528849.413.42$1,232
Dec 20161129748.763.72$1,642
Nov 20161328042.492.64$1,293
Oct 20161128146.193.09$1,376
Sep 2016928141.553.10$1,245
Aug 2016028141.442.92$822
Jul 2016027341.622.92$798
Jun 2016034045.352.69$913
May 2016025042.521.99$498
Apr 2016028636.561.99$569
Mar 2016032333.011.79$579
Feb 2016034726.472.06$716
Jan 2016035427.352.36$837
Dec 2015036332.362.00$727
Nov 2015035038.792.17$759
Oct 2015035943.552.43$871
Sep 2015038542.992.76$1,062
Aug 2015044740.162.87$1,284
Jul 2015047248.152.95$1,390
Jun 2015055256.152.88$1,591
May 2015028855.212.96$851
Apr 2015042549.822.71$1,150
Mar 2015053642.892.93$1,573
Feb 2015049944.662.98$1,485
Jan 2015064343.433.10$1,994
Dec 2014053554.693.59$1,921
Nov 2014060270.464.25$2,560
Oct 2014049978.303.90$1,947
Sep 2014050686.164.05$2,047
Aug 2014050489.394.04$2,034
Jul 2014049296.564.18$2,056
Jun 2014042198.164.74$1,994
May 2014047994.734.73$2,264
Apr 2014048395.944.81$2,323
Mar 2014046695.895.06$2,356
Feb 2014041697.406.19$2,576
Jan 2014051990.404.86$2,523
Dec 2013059291.824.35$2,578
Nov 2013054088.853.74$2,019
Oct 2013056797.423.78$2,143
Sep 20130482104.113.72$1,792
Aug 20130459104.253.52$1,617
Jul 20130473102.523.72$1,758
Jun 2013032494.403.93$1,274
May 2013035494.834.15$1,469
Apr 2013045093.964.28$1,927
Mar 2013041093.623.91$1,604
Feb 2013026991.233.42$920
Jan 2013033991.603.42$1,159
Dec 2012026886.773.42$917
Nov 2012029986.953.62$1,084
Oct 2012031189.383.40$1,057
Sep 2012029694.672.92$864
Aug 2012031592.662.91$916
Jul 2012031285.133.02$942
Jun 2012032979.822.52$829
May 2012030891.612.49$766
Apr 20120310101.652.00$619
Mar 20120338105.052.22$751
Feb 20120338101.102.57$869
Jan 2012036198.092.73$987
Dec 2011037296.873.24$1,205
Nov 2011036195.723.31$1,195
Oct 2011039284.983.65$1,430
Sep 2011038283.623.99$1,523
Aug 2011035883.404.15$1,485
Jul 2011036894.144.52$1,662
Jun 2011036192.904.64$1,675
May 2011044998.134.40$1,978
Apr 20110272105.964.33$1,179
Mar 2011036796.364.06$1,489
Feb 2011033285.644.18$1,388
Jan 2011035786.504.59$1,638
Dec 2010037585.734.35$1,630
Nov 2010036980.843.80$1,400
Oct 2010037278.103.51$1,305
Sep 2010036172.633.98$1,437
Aug 2010038573.684.42$1,701
Jul 2010038472.554.74$1,819
Jun 2010041470.364.91$2,033
May 2010041471.124.24$1,753
Apr 2010040981.694.12$1,686
Mar 2010040878.394.39$1,791
Feb 2010035873.585.44$1,948
Jan 2010038274.365.96$2,278
Dec 2009042571.445.48$2,331
Nov 2009039374.593.75$1,474
Oct 2009039372.544.11$1,615
Sep 2009039565.543.06$1,211
Aug 2009045967.423.22$1,477
Jul 2009051661.133.46$1,788
Jun 2009050566.163.90$1,967
May 2009054554.743.93$2,140
Apr 2009047546.773.59$1,704
Mar 2009054742.144.06$2,220
Feb 2009051832.814.63$2,400
Jan 2009047435.865.37$2,546
Dec 2008049737.105.98$2,971
Nov 2008050855.496.86$3,485
Oct 2008055175.246.92$3,814
Sep 20080469101.767.88$3,694
Aug 20080551114.228.48$4,674
Jul 20080502131.0811.39$5,717
Jun 20080431131.3313.03$5,617
May 20080472123.1711.57$5,463
Apr 20080461110.3110.45$4,820
Mar 20080452101.909.66$4,368
Feb 2008042492.538.77$3,719
Jan 2008042890.388.21$3,512
Dec 2007044988.337.30$3,279
Nov 2007046291.677.29$3,369
Oct 2007045282.856.92$3,129
Sep 2007047375.846.24$2,953
Aug 2007046269.066.39$2,951
Jul 2007045870.906.39$2,926
Jun 2007041362.007.55$3,118
May 2007045058.747.85$3,531
Apr 2007046459.617.81$3,622
Mar 2007051156.927.30$3,731
Feb 2007041055.108.22$3,369
Jan 2007053450.306.73$3,592
Dec 2006047656.656.92$3,293
Nov 2006051854.207.62$3,946
Oct 2006055854.906.01$3,356
Sep 2006054860.085.04$2,760
Aug 2006026868.717.34$1,967
Jul 2006049869.376.34$3,159
Jun 2006058566.286.38$3,735
May 2006066966.016.42$4,298
Apr 2006064464.397.36$4,740
Mar 2006056956.707.08$4,030
Feb 2006053257.597.75$4,124
Jan 2006053560.598.93$4,779
Dec 2005070754.9413.42$9,485
Nov 2005098154.6910.59$10,387
Oct 2005055458.3413.80$7,643
Sep 2005063761.4512.08$7,694
Aug 2005065661.519.80$6,427
Jul 2005073255.697.84$5,742
Jun 2005079452.337.38$5,861
May 2005084245.226.65$5,600
Apr 2005054149.207.36$3,982
Mar 2005060950.377.15$4,357
Feb 2005055345.226.31$3,490
Jan 2005061343.166.32$3,876
Dec 2004062939.866.75$4,246
Nov 2004057345.286.33$3,627
Oct 2004064349.706.52$4,189
Sep 2004054943.245.28$2,901
Aug 2004054942.375.55$3,047
Jul 2004060738.286.08$3,693
Jun 2004059636.106.43$3,834
May 2004056537.486.49$3,669
Apr 2004056534.475.86$3,310
Mar 2004059734.365.53$3,301
Feb 2004072132.455.51$3,972
Jan 2004089432.036.30$5,632
Dec 2003078730.266.30$4,959
Nov 2003078028.804.60$3,584
Oct 2003055128.174.76$2,623
Sep 2003056226.314.75$2,669
Aug 2003063829.765.13$3,273
Jul 2003062129.415.17$3,211
Jun 2003079628.565.98$4,762
May 2003068526.595.97$4,091
Apr 2003063926.675.41$3,455
Mar 2003062031.146.10$3,780
Feb 2003059033.487.93$4,676
Jan 2003052030.315.58$2,903
Dec 2002052826.914.85$2,563
Nov 2002054324.664.14$2,246
Oct 2002060326.464.23$2,550
Sep 2002057227.443.64$2,079
Aug 200201,05725.963.16$3,345
Jul 200201,08224.583.06$3,313
Jun 2002088823.733.34$2,964
May 2002093124.663.58$3,337
Apr 2002055123.653.51$1,935
Mar 2002056822.003.10$1,762
Feb 2002060218.222.38$1,430
Jan 2002055617.172.38$1,321
Dec 200101,53616.932.36$3,632
Nov 2001054918.072.41$1,321
Oct 2001062719.782.53$1,586
Sep 2001054024.262.25$1,216
Aug 2001059524.873.05$1,817
Jul 2001067123.933.20$2,145
Jun 2001056624.563.82$2,164
May 2001051125.524.31$2,201
Apr 2001050224.685.34$2,678
Mar 2001067824.545.38$3,645
Feb 2001053127.755.77$3,062
Jan 2001052327.478.40$4,393
Dec 2000063926.889.12$5,829
Nov 2000093032.215.66$5,262
Oct 2000068631.235.15$3,530
Sep 2000067531.875.19$3,501
Aug 2000067329.644.54$3,056
Jul 2000069228.534.09$2,830
Jun 2000065729.304.40$2,889
May 2000065727.263.68$2,418
Apr 2000065724.513.12$2,047
Mar 2000075928.422.86$2,171
Feb 2000062227.622.73$1,696
Jan 2000043925.272.48$1,089
Dec 1999053124.282.42$1,287
Nov 1999073823.192.43$1,796
Oct 1999089520.982.80$2,509
Sep 1999085021.752.62$2,226
Aug 1999084819.262.88$2,439
Jul 1999090117.892.37$2,138
Jun 1999093515.942.36$2,209
May 1999059215.792.32$1,374
Apr 1999079315.102.21$1,751
Mar 1999085412.471.84$1,570
Feb 199908409.981.82$1,527
Jan 1999093810.381.90$1,782
Dec 199801,2059.201.77$2,137
Nov 1998099410.892.19$2,173
Oct 199801,20112.421.97$2,365
Sep 199801,36312.592.08$2,839
Aug 199801,45411.301.91$2,773
Jul 199801,22911.742.24$2,750
Jun 199801,13011.242.24$2,528
May 199801,20612.622.21$2,661
Apr 199801,15313.042.51$2,889
Mar 199801,15612.802.31$2,670
Feb 199801,01313.952.30$2,329
Jan 1998096114.702.15$2,071
Dec 1997097816.322.41$2,358
Nov 199701,01118.193.09$3,122
Oct 199701,15319.253.15$3,632
Sep 199701,36817.742.95$4,042
Aug 199701,34417.862.55$3,434
Jul 199701,84117.582.25$4,137
Jun 199701,50617.242.26$3,399
May 199701,81718.972.31$4,195
Apr 199701,79117.882.08$3,730
Mar 199701,72918.951.94$3,353
Feb 199701,20020.492.21$2,647
Jan 199701,35823.483.54$4,807
Dec 199601,80723.32$0
Nov 199601,11521.97$0
Oct 199601,22823.31$0
Sep 199601,26922.22$0
Aug 199601,52320.26$0
Jul 199601,96019.55$0
Jun 199601,58618.73$0
May 199602,46019.43$0
Apr 199602,11321.51$0
Mar 199621,99219.38$39
Feb 199602,10316.98$0
Jan 199613,30817.07$17
Dec 199514,17017.19$17
Nov 1995435,65016.00$688
Oct 199503,55415.43$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             2 bbl  × $106.41 =       $213
Gas                  286 Mcf  × $  3.05 =       $871

────────────────────────────────────────────────────
Month total                                   $1,084

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/156787 is the state's own key, not one this site invented.