HOOVER 49

Operated by EXTEX OPERATING COMPANY (P-5 257062) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 158818District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.4 M
May 1996 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
361
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas221996-08-13 – 1996-12-022 dockets
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition596 bbl$10,826
GasProduction349,532 Mcf$1,405,896
Total$1,416,722

19,780 Mcf of this lease's gas, across 7 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4479, -101.5226. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.44794, -101.52264 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,250 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,250 ft.

Completions filed
May 1996
1 of 1 wells

1 well

42-1053725657,250 ftMay 1996

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (361)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

361 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 202601589.753.15$47
Feb 2026046163.503.75$1,729
Jan 2026054059.138.00$4,319
Dec 2025076856.664.41$3,389
Nov 202507258.593.93$283
Oct 202502759.383.30$89
Sep 2025059462.743.08$1,828
Aug 2025035863.933.01$1,079
Jul 2025020966.743.32$693
Jun 2025021166.483.13$660
May 2025023260.553.23$750
Apr 2025054662.363.54$1,935
Mar 2025032067.704.27$1,366
Feb 2025044670.884.34$1,936
Jan 2025051774.324.28$2,212
Dec 2024070568.993.12$2,201
Nov 2024038069.052.20$835
Oct 2024031671.372.28$721
Sep 2024030969.612.36$731
Aug 202408775.632.06$180
Jul 2024013079.932.15$279
Jun 2024014978.082.63$392
May 202406678.812.20$145
Apr 202408684.451.66$143
Mar 2024032780.301.55$505
Feb 2024034676.091.78$617
Jan 2024030173.023.30$993
Dec 2023037371.262.61$974
Nov 2023052477.892.81$1,471
Oct 2023051085.443.09$1,575
Sep 2023051089.042.74$1,395
Aug 2023056080.522.67$1,497
Jul 2023045074.852.64$1,189
Jun 2023049768.962.26$1,122
May 2023057570.622.23$1,281
Apr 2023059378.122.24$1,327
Mar 2023069772.852.39$1,668
Feb 2023050775.112.47$1,250
Jan 2023025476.533.39$860
Dec 2022035876.415.73$2,051
Nov 2022038685.005.65$2,179
Oct 2022038187.185.86$2,234
Sep 2022031084.888.16$2,531
Aug 2022036694.529.13$3,341
Jul 20220577101.587.54$4,352
Jun 20220537115.097.98$4,284
May 20220568109.378.43$4,790
Apr 20220582104.226.84$3,979
Mar 20220604108.885.08$3,066
Feb 2022054891.054.86$2,663
Jan 2022065081.844.54$2,949
Dec 2021060471.323.90$2,355
Nov 2021086377.435.24$4,519
Oct 2021041479.795.71$2,366
Sep 2021031269.865.35$1,669
Aug 2021038566.024.22$1,625
Jul 2021036870.783.98$1,465
Jun 2021031769.493.38$1,072
May 2021041963.483.02$1,264
Apr 2021057460.362.76$1,583
Mar 2021040961.302.72$1,111
Feb 2021031957.805.55$1,770
Jan 2021054750.412.81$1,537
Dec 2020047844.642.68$1,279
Nov 2020055138.772.71$1,491
Oct 2020064736.972.48$1,604
Sep 2020066337.091.99$1,320
Aug 2020079339.982.39$1,891
Jul 2020041838.371.83$763
Jun 2020036434.901.69$615
May 2020027016.921.81$490
Apr 2020030414.751.80$549
Mar 2020061330.341.86$1,138
Feb 2020064849.881.98$1,283
Jan 2020055857.252.09$1,169
Dec 2019039559.012.30$910
Nov 2019042755.302.75$1,175
Oct 2019067253.472.42$1,625
Sep 2019053455.052.66$1,419
Aug 2019042253.112.30$972
Jul 2019039056.272.46$959
Jun 2019041152.782.49$1,024
May 2019062658.482.74$1,715
Apr 2019062462.632.75$1,716
Mar 2019066256.803.06$2,027
Feb 2019060650.852.79$1,692
Jan 2019067746.033.23$2,185
Dec 2018066146.594.19$2,767
Nov 2018046852.934.24$1,983
Oct 2018063561.443.40$2,158
Sep 2018045559.543.11$1,414
Aug 2018051659.403.07$1,582
Jul 2018066365.142.93$1,944
Jun 2018065360.183.08$2,009
May 2018060565.382.90$1,755
Apr 2018066163.842.90$1,917
Mar 2018069661.222.79$1,940
Feb 2018060961.782.77$1,685
Jan 2018068462.874.01$2,742
Dec 2017070357.272.92$2,054
Nov 2017068455.423.12$2,133
Oct 2017069049.292.98$2,059
Sep 2017065447.523.09$2,019
Aug 2017070745.373.00$2,124
Jul 2017061743.873.09$1,905
Jun 2017065942.493.09$2,035
May 2017067945.373.26$2,216
Apr 2017067247.933.21$2,158
Mar 2017073046.772.98$2,178
Feb 2017077150.452.95$2,276
Jan 2017049749.413.42$1,699
Dec 2016043248.763.72$1,608
Nov 2016066142.492.64$1,748
Oct 2016069546.193.09$2,148
Sep 2016069241.553.10$2,146
Aug 2016077441.442.92$2,263
Jul 2016088141.622.92$2,576
Jun 2016052845.352.69$1,418
May 2016080242.521.99$1,597
Apr 2016032336.561.99$643
Mar 2016032533.011.79$583
Feb 2016060626.472.06$1,251
Jan 2016050427.352.36$1,192
Dec 2015058232.362.00$1,165
Nov 2015070438.792.17$1,526
Oct 2015075543.552.43$1,832
Sep 2015072342.992.76$1,994
Aug 2015072240.162.87$2,074
Jul 2015073648.152.95$2,168
Jun 2015073756.152.88$2,125
May 2015080855.212.96$2,388
Apr 2015070249.822.71$1,900
Mar 2015056942.892.93$1,670
Feb 2015043544.662.98$1,295
Jan 2015061743.433.10$1,913
Dec 2014053054.693.59$1,903
Nov 2014069070.464.25$2,934
Oct 2014075178.303.90$2,930
Sep 2014070986.164.05$2,868
Aug 2014078689.394.04$3,172
Jul 2014079596.564.18$3,323
Jun 2014077698.164.74$3,676
May 2014078994.734.73$3,729
Apr 2014079995.944.81$3,842
Mar 2014068795.895.06$3,474
Feb 2014063397.406.19$3,920
Jan 2014073790.404.86$3,582
Dec 2013075391.824.35$3,279
Nov 2013079688.853.74$2,976
Oct 2013081297.423.78$3,069
Sep 20130448104.113.72$1,666
Aug 20130792104.253.52$2,790
Jul 20130806102.523.72$2,997
Jun 2013082794.403.93$3,253
May 2013073894.834.15$3,062
Apr 2013089193.964.28$3,816
Mar 2013050393.623.91$1,968
Feb 2013067791.233.42$2,315
Jan 2013085391.603.42$2,917
Dec 2012080586.773.42$2,753
Nov 2012078886.953.62$2,856
Oct 2012085789.383.40$2,914
Sep 2012083294.672.92$2,428
Aug 2012084192.662.91$2,446
Jul 2012085185.133.02$2,571
Jun 2012086779.822.52$2,184
May 2012091191.612.49$2,267
Apr 20120824101.652.00$1,645
Mar 20120940105.052.22$2,089
Feb 20120867101.102.57$2,228
Jan 2012095498.092.73$2,608
Dec 201101,01196.873.24$3,275
Nov 201101,07195.723.31$3,546
Oct 2011083084.983.65$3,028
Sep 2011060683.623.99$2,415
Aug 2011062683.404.15$2,597
Jul 2011050294.144.52$2,268
Jun 2011086192.904.64$3,995
May 2011077198.134.40$3,396
Apr 20110910105.964.33$3,943
Mar 201101,07396.364.06$4,354
Feb 2011074185.644.18$3,097
Jan 2011076386.504.59$3,501
Dec 2010082385.734.35$3,578
Nov 201001,03980.843.80$3,943
Oct 201001,12078.103.51$3,930
Sep 2010058272.633.98$2,316
Aug 2010082773.684.42$3,655
Jul 201001,15772.554.74$5,480
Jun 2010084470.364.91$4,144
May 2010086371.124.24$3,655
Apr 2010057581.694.12$2,371
Mar 2010059978.394.39$2,629
Feb 201001,01373.585.44$5,513
Jan 2010081074.365.96$4,831
Dec 200901,05071.445.48$5,758
Nov 2009065874.593.75$2,468
Oct 2009084272.544.11$3,461
Sep 2009062965.543.06$1,928
Aug 2009084467.423.22$2,716
Jul 2009059561.133.46$2,061
Jun 2009087066.163.90$3,389
May 2009044654.743.93$1,751
Apr 2009059446.773.59$2,131
Mar 2009065142.144.06$2,642
Feb 2009058632.814.63$2,715
Jan 2009052235.865.37$2,804
Dec 2008079137.105.98$4,728
Nov 2008093855.496.86$6,435
Oct 200801,02175.246.92$7,067
Sep 20080610101.767.88$4,805
Aug 20080921114.228.48$7,813
Jul 20080855131.0811.39$9,738
Jun 20080846131.3313.03$11,026
May 20080915123.1711.57$10,590
Apr 20080891110.3110.45$9,315
Mar 20080945101.909.66$9,133
Feb 2008089592.538.77$7,850
Jan 2008095590.388.21$7,836
Dec 2007097088.337.30$7,083
Nov 2007093891.677.29$6,840
Oct 2007097682.856.92$6,756
Sep 2007094775.846.24$5,913
Aug 2007098069.066.39$6,260
Jul 2007096870.906.39$6,184
Jun 2007096862.007.55$7,307
May 200701,00258.747.85$7,862
Apr 200701,01759.617.81$7,938
Mar 2007083056.927.30$6,061
Feb 2007091055.108.22$7,477
Jan 2007096050.306.73$6,458
Dec 200601,00756.656.92$6,967
Nov 200601,08054.207.62$8,227
Oct 2006068354.906.01$4,107
Sep 2006095960.085.04$4,831
Aug 2006098968.717.34$7,259
Jul 200601,00169.376.34$6,349
Jun 2006098466.286.38$6,282
May 200601,04666.016.42$6,721
Apr 200601,05664.397.36$7,773
Mar 200601,10856.707.08$7,848
Feb 2006097457.597.75$7,550
Jan 200601,16260.598.93$10,381
Dec 200501,26954.9413.42$17,024
Nov 200501,02154.6910.59$10,811
Oct 200501,18658.3413.80$16,362
Sep 200501,16961.4512.08$14,120
Aug 200501,11761.519.80$10,943
Jul 200501,22255.697.84$9,585
Jun 200501,25052.337.38$9,226
May 200501,19945.226.65$7,975
Apr 200501,23449.207.36$9,083
Mar 200501,15350.377.15$8,250
Feb 200501,17045.226.31$7,385
Jan 200501,25543.166.32$7,934
Dec 200401,24739.866.75$8,419
Nov 200401,22245.286.33$7,736
Oct 200401,29949.706.52$8,463
Sep 200401,27843.245.28$6,753
Aug 200401,36542.375.55$7,577
Jul 200401,31638.286.08$8,007
Jun 200401,35136.106.43$8,691
May 200401,43237.486.49$9,300
Apr 200401,30134.475.86$7,622
Mar 200401,26634.365.53$7,001
Feb 200401,16432.455.51$6,413
Jan 200401,27932.036.30$8,057
Dec 200301,19430.266.30$7,524
Nov 200301,11628.804.60$5,128
Oct 200301,31228.174.76$6,245
Sep 200301,26026.314.75$5,984
Aug 200301,44629.765.13$7,418
Jul 200301,36029.415.17$7,032
Jun 200301,32128.565.98$7,903
May 200301,43526.595.97$8,571
Apr 200301,37826.675.41$7,451
Mar 200301,44131.146.10$8,784
Feb 200301,24133.487.93$9,836
Jan 200301,48830.315.58$8,306
Dec 200201,28826.914.85$6,252
Nov 200201,24324.664.14$5,142
Oct 200201,47626.464.23$6,242
Sep 200201,37627.443.64$5,002
Aug 200201,46125.963.16$4,623
Jul 200201,53724.583.06$4,706
Jun 200201,39223.733.34$4,647
May 200201,56524.663.58$5,609
Apr 200201,48523.653.51$5,216
Mar 200201,45622.003.10$4,518
Feb 200201,21518.222.38$2,886
Jan 200201,62817.172.38$3,868
Dec 200101,42516.932.36$3,369
Nov 200101,46718.072.41$3,529
Oct 200101,53819.782.53$3,889
Sep 200101,55424.262.25$3,499
Aug 200101,52024.873.05$4,641
Jul 200101,51623.933.20$4,847
Jun 200101,65024.563.82$6,310
May 200101,60425.524.31$6,909
Apr 200101,57224.685.34$8,387
Mar 200101,65724.545.38$8,909
Feb 200101,26927.755.77$7,318
Jan 200101,30327.478.40$10,944
Dec 200001,36126.889.12$12,416
Nov 200001,57632.215.66$8,917
Oct 200001,76731.235.15$9,092
Sep 200001,72131.875.19$8,926
Aug 200001,68129.644.54$7,633
Jul 200001,63028.534.09$6,666
Jun 200001,62629.304.40$7,150
May 200001,75827.263.68$6,469
Apr 200001,60624.513.12$5,004
Mar 200001,66628.422.86$4,764
Feb 200001,60927.622.73$4,387
Jan 200001,74425.272.48$4,326
Dec 199901,63224.282.42$3,956
Nov 199901,83423.192.43$4,464
Oct 199901,89620.982.80$5,316
Sep 199901,88221.752.62$4,929
Aug 199901,84119.262.88$5,294
Jul 199901,88417.892.37$4,470
Jun 199901,87815.942.36$4,436
May 199901,90115.792.32$4,412
Apr 199901,92115.102.21$4,242
Mar 199902,03912.471.84$3,748
Feb 199901,5479.981.82$2,812
Jan 199901,71210.381.90$3,253
Dec 199801,7519.201.77$3,105
Nov 199801,72910.892.19$3,779
Oct 199801,85012.421.97$3,643
Sep 199801,72812.592.08$3,599
Aug 199801,92311.301.91$3,668
Jul 199802,17411.742.24$4,864
Jun 199832,09511.242.24$4,721
May 1998231,25712.622.21$3,064
Apr 1998241,41813.042.51$3,866
Mar 1998331,50512.802.31$3,898
Feb 1998241,01213.952.30$2,662
Jan 1998521,98214.702.15$5,035
Dec 1997331,73016.322.41$4,710
Nov 1997421,92418.193.09$6,706
Oct 1997512,44219.253.15$8,674
Sep 1997141,92517.742.95$5,937
Aug 1997102,22817.862.55$5,871
Jul 1997232,57417.582.25$6,188
Jun 1997152,04317.242.26$4,870
May 1997162,46318.972.31$5,989
Apr 1997122,30717.882.08$5,020
Mar 1997152,43918.951.94$5,014
Feb 1997162,29020.492.21$5,379
Jan 1997242,57923.483.54$9,692
Dec 1996182,27623.32$420
Nov 1996292,26821.97$637
Oct 1996362,55923.31$839
Sep 1996263,62122.22$578
Aug 1996263,64720.26$527
Jul 1996234,34019.55$450
Jun 199681,06918.73$150
May 19960019.43$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 89.75 =         $0
Gas                   15 Mcf  × $  3.15 =        $47

────────────────────────────────────────────────────
Month total                                      $47

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/158818 is the state's own key, not one this site invented.