HENDERSON, JOHN W. III "N"

Operated by DJH OIL & GAS LLC (P-5 221734) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 161009District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.7 M
Sep 1996 – May 2024
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
333
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111997-03-17136337
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,023 bbl$116,553
GasProduction396,277 Mcf$1,534,257
Total$1,650,810

15,837 Mcf of this lease's gas, across 2 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5319, -101.4017. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.53195, -101.40174 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,950 ft
1 wells filed one
Completion to plug
27.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,950 ft.

Completions filed
Sep 1996
1 of 1 wells
Plug dates filed
Dec 2023
1 of 1 wells

Last completion to plug: a median of 27.3 years across the 1 well that filed both dates, with the middle half between 27.3 years and 27.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-10537332458,950 ftSep 1996Dec 2023Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (333)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

333 months

May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20232071.262.61$143
Nov 2023018777.892.81$525
Oct 2023035885.443.09$1,105
Sep 2023051589.042.74$1,409
Aug 2023020680.522.67$551
Jul 2023047674.852.64$1,258
Jun 2023449968.962.26$1,403
May 2023043770.622.23$973
Apr 2023049678.122.24$1,110
Mar 2023050872.852.39$1,216
Feb 2023050475.112.47$1,243
Jan 2023049476.533.39$1,674
Dec 2022040176.415.73$2,297
Nov 2022046585.005.65$2,625
Oct 2022038387.185.86$2,246
Sep 2022035584.888.16$2,898
Aug 2022038494.529.13$3,505
Jul 20220331101.587.54$2,496
Jun 20220397115.097.98$3,167
May 20220424109.378.43$3,576
Apr 20220500104.226.84$3,419
Mar 202201,225108.885.08$6,219
Feb 2022053791.054.86$2,609
Jan 2022423481.844.54$1,389
Dec 2021024171.323.90$940
Nov 2021022277.435.24$1,163
Oct 2021035979.795.71$2,051
Sep 2021042269.865.35$2,258
Aug 2021044966.024.22$1,895
Jul 2021051670.783.98$2,055
Jun 2021039569.493.38$1,335
May 2021048763.483.02$1,470
Apr 2021042560.362.76$1,172
Mar 2021042661.302.72$1,157
Feb 2021030857.805.55$1,709
Jan 2021442450.412.81$1,393
Dec 2020047044.642.68$1,257
Nov 2020039438.772.71$1,066
Oct 2020038836.972.48$962
Sep 2020036837.091.99$733
Aug 2020039639.982.39$945
Jul 2020043138.371.83$787
Jun 2020028334.901.69$478
May 2020036416.921.81$661
Apr 2020040914.751.80$738
Mar 2020045230.341.86$839
Feb 2020042349.881.98$838
Jan 2020444357.252.09$1,157
Dec 2019042459.012.30$977
Nov 2019036055.302.75$990
Oct 2019037753.472.42$912
Sep 2019035455.052.66$941
Aug 2019034353.112.30$790
Jul 2019032656.272.46$802
Jun 2019033252.782.49$827
May 2019037458.482.74$1,025
Apr 2019039262.632.75$1,078
Mar 2019039256.803.06$1,200
Feb 2019034550.852.79$963
Jan 2019040446.033.23$1,304
Dec 2018038446.594.19$1,607
Nov 2018435852.934.24$1,729
Oct 2018028661.443.40$972
Sep 2018030859.543.11$957
Aug 2018035359.403.07$1,083
Jul 2018046565.142.93$1,363
Jun 2018040360.183.08$1,240
May 2018042265.382.90$1,224
Apr 2018037463.842.90$1,085
Mar 2018045261.222.79$1,260
Feb 2018043061.782.77$1,189
Jan 2018045862.874.01$1,836
Dec 2017045957.272.92$1,341
Nov 2017040555.423.12$1,263
Oct 2017436849.292.98$1,295
Sep 2017039647.523.09$1,223
Aug 2017042345.373.00$1,271
Jul 2017042743.873.09$1,318
Jun 2017048942.493.09$1,510
May 2017051045.373.26$1,664
Apr 2017046747.933.21$1,500
Mar 2017054746.772.98$1,632
Feb 2017047550.452.95$1,402
Jan 2017049249.413.42$1,682
Dec 2016445948.763.72$1,904
Nov 2016049042.492.64$1,296
Oct 2016048146.193.09$1,486
Sep 2016056441.553.10$1,749
Aug 2016055341.442.92$1,617
Jul 2016052941.622.92$1,547
Jun 2016056645.352.69$1,520
May 2016040742.521.99$810
Apr 2016453936.561.99$1,219
Mar 2016053133.011.79$953
Feb 2016054926.472.06$1,133
Jan 2016061227.352.36$1,447
Dec 2015453432.362.00$1,198
Nov 2015053838.792.17$1,166
Oct 2015059843.552.43$1,451
Sep 2015054442.992.76$1,501
Aug 2015059540.162.87$1,709
Jul 2015057448.152.95$1,690
Jun 2015064656.152.88$1,862
May 2015025555.212.96$754
Apr 2015443549.822.71$1,377
Mar 2015043642.892.93$1,280
Feb 2015036744.662.98$1,092
Jan 2015042443.433.10$1,315
Dec 2014039354.693.59$1,411
Nov 2014446770.464.25$2,267
Oct 2014047378.303.90$1,845
Sep 2014043886.164.05$1,772
Aug 2014048389.394.04$1,949
Jul 2014043096.564.18$1,797
Jun 2014049198.164.74$2,326
May 2014051794.734.73$2,444
Apr 2014054095.944.81$2,597
Mar 2014052395.895.06$2,645
Feb 2014454897.406.19$3,783
Jan 2014059390.404.86$2,882
Dec 2013061791.824.35$2,687
Nov 2013447888.853.74$2,142
Oct 2013059997.423.78$2,264
Sep 20130621104.113.72$2,309
Aug 20130770104.253.52$2,712
Jul 20130755102.523.72$2,807
Jun 2013069794.403.93$2,742
May 2013063794.834.15$2,643
Apr 2013463693.964.28$3,100
Mar 2013058693.623.91$2,293
Feb 2013054191.233.42$1,850
Jan 2013460091.603.42$2,418
Dec 2012062986.773.42$2,151
Nov 2012050186.953.62$1,816
Oct 2012062589.383.40$2,125
Sep 2012451094.672.92$1,867
Aug 2012049392.662.91$1,434
Jul 2012050985.133.02$1,538
Jun 2012044379.822.52$1,116
May 2012049491.612.49$1,229
Apr 20120578101.652.00$1,154
Mar 20120677105.052.22$1,504
Feb 20120542101.102.57$1,393
Jan 2012060198.092.73$1,643
Dec 2011458296.873.24$2,273
Nov 2011075595.723.31$2,500
Oct 2011070384.983.65$2,565
Sep 2011051583.623.99$2,053
Aug 2011076983.404.15$3,191
Jul 2011079494.144.52$3,587
Jun 2011059292.904.64$2,747
May 2011483198.134.40$4,053
Apr 20110629105.964.33$2,726
Mar 2011080496.364.06$3,262
Feb 2011065585.644.18$2,738
Jan 2011462586.504.59$3,214
Dec 2010071285.734.35$3,096
Nov 2010461380.843.80$2,650
Oct 2010064978.103.51$2,277
Sep 2010070772.633.98$2,813
Aug 2010078473.684.42$3,465
Jul 2010068072.554.74$3,221
Jun 2010054970.364.91$2,696
May 2010470171.124.24$3,253
Apr 2010082781.694.12$3,409
Mar 2010078478.394.39$3,441
Feb 2010072173.585.44$3,924
Jan 2010471374.365.96$4,550
Dec 2009076471.445.48$4,190
Nov 20092083074.593.75$4,606
Oct 2009070672.544.11$2,902
Sep 2009084665.543.06$2,593
Aug 2009087867.423.22$2,826
Jul 2009083861.133.46$2,903
Jun 2009077066.163.90$2,999
May 2009087454.743.93$3,431
Apr 20092895846.773.59$4,746
Mar 2009081242.144.06$3,296
Feb 20092876932.814.63$4,481
Jan 2009096435.865.37$5,178
Dec 20082995037.105.98$6,754
Nov 200801,01855.496.86$6,984
Oct 2008231,04275.246.92$8,943
Sep 20080713101.767.88$5,616
Aug 20080866114.228.48$7,346
Jul 20080939131.0811.39$10,695
Jun 200801,017131.3313.03$13,254
May 20080922123.1711.57$10,672
Apr 20080894110.3110.45$9,347
Mar 20080954101.909.66$9,220
Feb 2008085892.538.77$7,525
Jan 200801,01790.388.21$8,345
Dec 2007097388.337.30$7,105
Nov 2007094391.677.29$6,876
Oct 2007095382.856.92$6,597
Sep 2007083675.846.24$5,220
Aug 2007096569.066.39$6,164
Jul 2007087770.906.39$5,602
Jun 2007091762.007.55$6,922
May 200701,00558.747.85$7,886
Apr 2007089459.617.81$6,978
Mar 200701,06556.927.30$7,777
Feb 2007089955.108.22$7,386
Jan 200701,15750.306.73$7,783
Dec 200601,17656.656.92$8,136
Nov 200601,20654.207.62$9,187
Oct 200601,23354.906.01$7,415
Sep 200601,14260.085.04$5,752
Aug 200601,15768.717.34$8,492
Jul 200601,18269.376.34$7,497
Jun 200601,13266.286.38$7,227
May 200601,17866.016.42$7,569
Apr 200601,11864.397.36$8,229
Mar 200601,27356.707.08$9,017
Feb 200601,07057.597.75$8,294
Jan 200601,18760.598.93$10,604
Dec 200501,22054.9413.42$16,367
Nov 200501,25654.6910.59$13,299
Oct 200501,41258.3413.80$19,480
Sep 200531,27661.4512.08$15,597
Aug 200501,19061.519.80$11,658
Jul 2005094755.697.84$7,428
Jun 20051691952.337.38$7,620
May 2005097345.226.65$6,472
Apr 200501,09549.207.36$8,060
Mar 2005201,12950.377.15$9,085
Feb 20052095645.226.31$6,939
Jan 2005201,07443.166.32$7,653
Dec 2004201,29939.866.75$9,567
Nov 2004401,21345.286.33$9,490
Oct 200411,32449.706.52$8,676
Sep 2004191,30643.245.28$7,722
Aug 2004201,36042.375.55$8,396
Jul 200401,50938.286.08$9,181
Jun 2004211,38936.106.43$9,694
May 2004201,45037.486.49$10,167
Apr 2004201,26034.475.86$8,071
Mar 2004121,18134.365.53$6,943
Feb 2004121,33632.455.51$7,750
Jan 2004121,56632.036.30$10,250
Dec 2003111,61830.266.30$10,529
Nov 200301,62628.804.60$7,472
Oct 2003111,49728.174.76$7,435
Sep 200311,52026.314.75$7,245
Aug 2003111,40229.765.13$7,519
Jul 200301,44229.415.17$7,456
Jun 2003121,45028.565.98$9,018
May 200301,67526.595.97$10,004
Apr 2003221,62426.675.41$9,368
Mar 2003111,63731.146.10$10,322
Feb 2003111,38133.487.93$11,314
Jan 2003131,67930.315.58$9,766
Dec 2002241,63526.914.85$8,582
Nov 2002111,52124.664.14$6,564
Oct 2002222,36326.464.23$10,576
Sep 2002111,51427.443.64$5,806
Aug 2002111,66225.963.16$5,544
Jul 2002111,58424.583.06$5,120
Jun 2002121,63823.733.34$5,753
May 2002122,03224.663.58$7,579
Apr 2002392,02323.653.51$8,028
Mar 2002392,28922.003.10$7,960
Feb 2002292,00218.222.38$5,284
Jan 2002332,00117.172.38$5,320
Dec 2001501,97416.932.36$5,514
Nov 2001512,02118.072.41$5,783
Oct 2001682,43719.782.53$7,508
Sep 2001551,81324.262.25$5,416
Aug 2001431,13024.873.05$4,519
Jul 2001701,17623.933.20$5,435
Jun 2001692,06424.563.82$9,588
May 2001931,92425.524.31$10,661
Apr 2001631,86124.685.34$11,484
Mar 2001921,99524.545.38$12,984
Feb 20011071,59927.755.77$12,191
Jan 2001721,69727.478.40$16,231
Dec 20001571,54626.889.12$18,324
Nov 20001231,71932.215.66$13,688
Oct 2000801,74631.235.15$11,482
Sep 2000371,97931.875.19$11,443
Aug 200002,11929.644.54$9,622
Jul 2000392,22128.534.09$10,196
Jun 2000392,16329.304.40$10,654
May 2000512,16527.263.68$9,357
Apr 2000401,97624.513.12$7,138
Mar 2000392,23228.422.86$7,491
Feb 2000392,19427.622.73$7,059
Jan 2000792,22525.272.48$7,515
Dec 1999402,19424.282.42$6,289
Nov 1999382,13823.192.43$6,085
Oct 1999402,21320.982.80$7,044
Sep 1999392,22421.752.62$6,673
Aug 1999402,68919.262.88$8,503
Jul 1999392,68517.892.37$7,068
Jun 1999402,90915.942.36$7,509
May 1999632,87415.792.32$7,665
Apr 1999392,95915.102.21$7,123
Mar 1999803,04912.471.84$6,603
Feb 1999403,3299.981.82$6,451
Jan 1999812,60310.381.90$5,786
Dec 1998813,0339.201.77$6,124
Nov 1998802,66210.892.19$6,690
Oct 1998832,69912.421.97$6,346
Sep 1998803,11212.592.08$7,488
Aug 1998823,89111.301.91$8,348
Jul 1998823,30511.742.24$8,357
Jun 1998772,65811.242.24$6,812
May 19981102,70512.622.21$7,356
Apr 1998393,16313.042.51$8,433
Mar 1998403,40212.802.31$8,369
Feb 1998803,12313.952.30$8,296
Jan 1998393,70314.702.15$8,552
Dec 1997794,31016.322.41$11,681
Nov 1997775,07018.193.09$17,058
Oct 1997794,97719.253.15$17,197
Sep 1997385,49917.742.95$16,923
Aug 1997775,92117.862.55$16,502
Jul 1997395,45317.582.25$12,938
Jun 1997785,45617.242.26$13,660
May 1997766,09418.972.31$15,510
Apr 19971185,98217.882.08$14,569
Mar 19971156,59018.951.94$14,958
Feb 19971574,84520.492.21$13,905
Jan 1997764,41323.483.54$17,405
Dec 19961137,78523.32$2,635
Nov 1996428,05221.97$923
Oct 19960023.31$0
Sep 19960022.22$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2023 — as filed, then multipliedworked
Condensate             2 bbl  × $ 71.26 =       $143
Gas                    0 Mcf  × $  2.61 =         $0

────────────────────────────────────────────────────
Month total                                     $143

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/161009 is the state's own key, not one this site invented.