LINTHICUM "1223"

Operated by BRECK OPERATING CORP. (P-5 89974) in the LAVAN (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 163542District 7CField 52368480CondensateGasSaveExport
Value, all time
$1.0 M
Jun 1997 – Nov 2018
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
258
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 66 leases and 76 wells, and the rule below applies to all of them.

Discovered
1992-07-06
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1995-08-01.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA ADDMINISTRATIVELY SUPENDED 11/1/95

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition540 bbl$11,830
GasProduction281,367 Mcf$993,575
Total$1,005,405

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.1315, -101.1047. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.13146, -101.10468 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,735 ft
1 wells filed one
Completion to plug
21.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,735 ft.

Completions filed
Jun 1997
1 of 1 wells
Plug dates filed
Aug 2018
1 of 1 wells

Last completion to plug: a median of 21.2 years across the 1 well that filed both dates, with the middle half between 21.2 years and 21.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2353362216,735 ftJun 1997Aug 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (258)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

258 months

Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20186620959.403.07$4,561
Jul 2018019465.142.93$569
Jun 2018018160.183.08$557
May 201808865.382.90$255
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170742.493.09$22
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160942.492.64$24
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160533.011.79$9
Feb 2016016026.472.06$330
Jan 2016028727.352.36$679
Dec 2015037632.362.00$753
Nov 20150938.792.17$20
Oct 2015020443.552.43$495
Sep 2015026242.992.76$723
Aug 2015030040.162.87$862
Jul 2015023248.152.95$683
Jun 2015012456.152.88$357
May 2015014455.212.96$426
Apr 2015014949.822.71$403
Mar 201502442.892.93$70
Feb 201501844.662.98$54
Jan 201502043.433.10$62
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140589.394.04$20
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 201402494.734.73$113
Apr 20140795.944.81$34
Mar 201401195.895.06$56
Feb 201401397.406.19$81
Jan 201403690.404.86$175
Dec 201303191.824.35$135
Nov 201305188.853.74$191
Oct 20130797.423.78$26
Sep 201308104.113.72$30
Aug 2013024104.253.52$85
Jul 2013094102.523.72$349
Jun 2013015094.403.93$590
May 2013025994.834.15$1,075
Apr 2013039493.964.28$1,687
Mar 2013041493.623.91$1,620
Feb 2013034691.233.42$1,183
Jan 2013024691.603.42$841
Dec 2012018286.773.42$622
Nov 2012020986.953.62$758
Oct 2012026889.383.40$911
Sep 2012019694.672.92$572
Aug 201209192.662.91$265
Jul 2012013785.133.02$414
Jun 2012018679.822.52$469
May 2012019391.612.49$480
Apr 20120209101.652.00$417
Mar 20120127105.052.22$282
Feb 2012084101.102.57$216
Jan 2012010098.092.73$273
Dec 2011019696.873.24$635
Nov 2011021495.723.31$709
Oct 2011022784.983.65$828
Sep 2011022383.623.99$889
Aug 2011022783.404.15$942
Jul 2011023094.144.52$1,039
Jun 2011023592.904.64$1,090
May 2011024398.134.40$1,070
Apr 20110238105.964.33$1,031
Mar 2011028796.364.06$1,164
Feb 2011025385.644.18$1,058
Jan 2011033786.504.59$1,546
Dec 2010022285.734.35$965
Nov 2010022280.843.80$843
Oct 2010024278.103.51$849
Sep 2010024272.633.98$963
Aug 2010026273.684.42$1,158
Jul 2010026172.554.74$1,236
Jun 2010026470.364.91$1,296
May 2010027471.124.24$1,160
Apr 2010026381.694.12$1,084
Mar 2010027778.394.39$1,216
Feb 2010024173.585.44$1,312
Jan 2010027874.365.96$1,658
Dec 2009028971.445.48$1,585
Nov 2009029574.593.75$1,107
Oct 2009030972.544.11$1,270
Sep 2009029965.543.06$916
Aug 2009031367.423.22$1,007
Jul 2009031361.133.46$1,084
Jun 2009032666.163.90$1,270
May 2009035054.743.93$1,374
Apr 2009032346.773.59$1,159
Mar 2009036142.144.06$1,465
Feb 2009032532.814.63$1,506
Jan 2009037535.865.37$2,014
Dec 2008038037.105.98$2,271
Nov 2008039155.496.86$2,682
Oct 2008050475.246.92$3,489
Sep 20080284101.767.88$2,237
Aug 20080501114.228.48$4,250
Jul 20080572131.0811.39$6,515
Jun 20080280131.3313.03$3,649
May 20080145123.1711.57$1,678
Apr 20080164110.3110.45$1,715
Mar 200801,731101.909.66$16,729
Feb 2008084992.538.77$7,446
Jan 2008046590.388.21$3,816
Dec 2007073688.337.30$5,374
Nov 2007082491.677.29$6,008
Oct 2007061282.856.92$4,236
Sep 2007052375.846.24$3,266
Aug 2007064269.066.39$4,101
Jul 2007046670.906.39$2,977
Jun 2007021162.007.55$1,593
May 2007035458.747.85$2,778
Apr 2007039259.617.81$3,060
Mar 2007039556.927.30$2,884
Feb 2007032355.108.22$2,654
Jan 2007041950.306.73$2,819
Dec 2006044956.656.92$3,106
Nov 2006041754.207.62$3,176
Oct 2006039654.906.01$2,381
Sep 2006034460.085.04$1,733
Aug 2006046968.717.34$3,442
Jul 2006047769.376.34$3,026
Jun 2006046966.286.38$2,994
May 2006051966.016.42$3,335
Apr 2006036664.397.36$2,694
Mar 2006038356.707.08$2,713
Feb 2006042957.597.75$3,325
Jan 2006046260.598.93$4,127
Dec 2005045954.9413.42$6,158
Nov 2005045154.6910.59$4,775
Oct 2005048058.3413.80$6,622
Sep 2005048661.4512.08$5,870
Aug 2005058061.519.80$5,682
Jul 2005049355.697.84$3,867
Jun 2005050952.337.38$3,757
May 2005054845.226.65$3,645
Apr 2005055549.207.36$4,085
Mar 2005059950.377.15$4,286
Feb 2005058845.226.31$3,711
Jan 2005061043.166.32$3,857
Dec 2004063939.866.75$4,314
Nov 2004061845.286.33$3,912
Oct 2004062149.706.52$4,046
Sep 2004051943.245.28$2,742
Aug 2004058342.375.55$3,236
Jul 2004049638.286.08$3,018
Jun 2004069636.106.43$4,477
May 2004053037.486.49$3,442
Apr 2004061334.475.86$3,591
Mar 2004062634.365.53$3,462
Feb 2004059432.455.51$3,273
Jan 2004065032.036.30$4,095
Dec 2003065630.266.30$4,134
Nov 2003064528.804.60$2,964
Oct 2003070728.174.76$3,365
Sep 2003075426.314.75$3,581
Aug 2003082329.765.13$4,222
Jul 2003096529.415.17$4,990
Jun 2003069028.565.98$4,128
May 2003091526.595.97$5,465
Apr 2003085626.675.41$4,629
Mar 2003090731.146.10$5,529
Feb 2003083233.487.93$6,594
Jan 2003094330.315.58$5,264
Dec 2002096826.914.85$4,698
Nov 2002097024.664.14$4,013
Oct 200201,04226.464.23$4,407
Sep 2002099227.443.64$3,606
Aug 200201,06325.963.16$3,364
Jul 200201,11524.583.06$3,414
Jun 200201,11023.733.34$3,705
May 200201,20724.663.58$4,326
Apr 200201,15023.653.51$4,039
Mar 200201,21922.003.10$3,782
Feb 200201,11518.222.38$2,649
Jan 200201,43217.172.38$3,402
Dec 200101,50116.932.36$3,549
Nov 200101,44618.072.41$3,478
Oct 200101,42519.782.53$3,604
Sep 200101,56724.262.25$3,528
Aug 200101,68024.873.05$5,129
Jul 200101,77723.933.20$5,681
Jun 200101,72724.563.82$6,604
May 200101,64725.524.31$7,094
Apr 200101,69024.685.34$9,017
Mar 200101,77224.545.38$9,527
Feb 2001471,70027.755.77$11,108
Jan 2001831,95227.478.40$18,674
Dec 200001,93626.889.12$17,661
Nov 200002,02632.215.66$11,463
Oct 200002,21731.235.15$11,408
Sep 200002,14731.875.19$11,135
Aug 200002,36029.644.54$10,716
Jul 200002,41428.534.09$9,873
Jun 200002,40829.304.40$10,589
May 200002,59127.263.68$9,534
Apr 200002,53224.513.12$7,890
Mar 200002,33128.422.86$6,666
Feb 200002,51927.622.73$6,868
Jan 200002,87025.272.48$7,119
Dec 199902,87024.282.42$6,956
Nov 199902,54223.192.43$6,187
Oct 199903,12520.982.80$8,762
Sep 199903,13721.752.62$8,215
Aug 199903,27719.262.88$9,423
Jul 199903,32717.892.37$7,893
Jun 199903,10015.942.36$7,323
May 199903,26915.792.32$7,587
Apr 199903,26915.102.21$7,218
Mar 199903,00712.471.84$5,528
Feb 199902,8989.981.82$5,268
Jan 199903,43910.381.90$6,534
Dec 19981813,2979.201.77$7,512
Nov 199803,61610.892.19$7,904
Oct 199804,11212.421.97$8,097
Sep 199804,20112.592.08$8,749
Aug 199804,44811.301.91$8,484
Jul 199805,26011.742.24$11,768
Jun 199805,25211.242.24$11,750
May 199805,54412.622.21$12,232
Apr 199805,76813.042.51$14,451
Mar 199806,35812.802.31$14,683
Feb 199807,15813.952.30$16,457
Jan 199807,15814.702.15$15,424
Dec 19971637,76516.322.41$21,382
Nov 199708,29018.193.09$25,602
Oct 199709,62119.253.15$30,304
Sep 1997010,22417.742.95$30,211
Aug 1997010,63017.862.55$27,157
Jul 1997014,27917.582.25$32,084
Jun 199701,98917.242.26$4,490

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2018 — as filed, then multipliedworked
Condensate            66 bbl  × $ 59.40 =     $3,920
Gas                  209 Mcf  × $  3.07 =       $641

────────────────────────────────────────────────────
Month total                                   $4,561

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/163542 is the state's own key, not one this site invented.