HOOVER ESTATE "19A"

Operated by EPIC PERMIAN OPERATING, LLC (P-5 253404) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 164549District 7CField 679952002 tax incentive programmesGasSaveExport
Value, all time
$249 k
May 1997 – Jun 2023
Value, last 12 filed months
$79
at the published price for each month
Months reported
314
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111997-10-27137374
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction61,692 Mcf$248,740
Total$248,740

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4090, -101.5721. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.40898, -101.57215 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,324 ft
1 wells filed one
Completion to plug
26.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,324 ft.

Completions filed
May 1997
1 of 1 wells
Plug dates filed
Jun 2023
1 of 1 wells

Last completion to plug: a median of 26.1 years across the 1 well that filed both dates, with the middle half between 26.1 years and 26.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1053753357,324 ftMay 1997Jun 2023Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (314)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

314 months

Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 20221485.005.65$79
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022291.054.86$10
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 20213277.435.24$168
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 20217763.483.02$232
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 20192053.472.42$48
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019656.272.46$15
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 20181552.934.24$64
Oct 201814961.443.40$506
Sep 201814959.543.11$463
Aug 201810859.403.07$331
Jul 20186365.142.93$185
Jun 20181060.183.08$31
May 20187665.382.90$220
Apr 20187363.842.90$212
Mar 20187761.222.79$215
Feb 20186961.782.77$191
Jan 20186562.874.01$261
Dec 20179857.272.92$286
Nov 20177355.423.12$228
Oct 20178449.292.98$251
Sep 20179847.523.09$303
Aug 20179145.373.00$273
Jul 201710143.873.09$312
Jun 201710042.493.09$309
May 201712145.373.26$395
Apr 201713247.933.21$424
Mar 201713346.772.98$397
Feb 201711150.452.95$328
Jan 201713049.413.42$444
Dec 201612948.763.72$480
Nov 201612542.492.64$331
Oct 201612046.193.09$371
Sep 201612741.553.10$394
Aug 201614741.442.92$430
Jul 201615041.622.92$439
Jun 201613845.352.69$371
May 201614742.521.99$293
Apr 201613536.561.99$269
Mar 201613833.011.79$248
Feb 201613326.472.06$274
Jan 201614527.352.36$343
Dec 201514332.362.00$286
Nov 201514338.792.17$310
Oct 201514943.552.43$362
Sep 201514342.992.76$394
Aug 201515340.162.87$439
Jul 201514648.152.95$430
Jun 201513256.152.88$381
May 201513955.212.96$411
Apr 201512849.822.71$346
Mar 201513842.892.93$405
Feb 201512544.662.98$372
Jan 201514643.433.10$453
Dec 201412954.693.59$463
Nov 201412770.464.25$540
Oct 201413678.303.90$531
Sep 201412986.164.05$522
Aug 201421289.394.04$855
Jul 201413996.564.18$581
Jun 201413798.164.74$649
May 201414194.734.73$666
Apr 201415895.944.81$760
Mar 201410895.895.06$546
Feb 20149797.406.19$601
Jan 201412090.404.86$583
Dec 201311791.824.35$509
Nov 201312288.853.74$456
Oct 201316097.423.78$605
Sep 201385104.113.72$316
Aug 201377104.253.52$271
Jul 201396102.523.72$357
Jun 20139494.403.93$370
May 201312394.834.15$510
Apr 201313893.964.28$591
Mar 201311393.623.91$442
Feb 201311291.233.42$383
Jan 201314191.603.42$482
Dec 201215386.773.42$523
Nov 201214786.953.62$533
Oct 201214889.383.40$503
Sep 201215294.672.92$444
Aug 201214992.662.91$433
Jul 201215285.133.02$459
Jun 201214979.822.52$375
May 201215991.612.49$396
Apr 2012148101.652.00$296
Mar 2012155105.052.22$344
Feb 2012150101.102.57$386
Jan 201215798.092.73$429
Dec 201115696.873.24$505
Nov 201115195.723.31$500
Oct 201116184.983.65$587
Sep 201110883.623.99$430
Aug 201112283.404.15$506
Jul 201112194.144.52$547
Jun 201111992.904.64$552
May 201112398.134.40$542
Apr 2011131105.964.33$568
Mar 201110296.364.06$414
Feb 201110285.644.18$426
Jan 201113486.504.59$615
Dec 201014185.734.35$613
Nov 201012980.843.80$490
Oct 201013278.103.51$463
Sep 201012672.633.98$501
Aug 201014873.684.42$654
Jul 201014572.554.74$687
Jun 201014570.364.91$712
May 201015071.124.24$635
Apr 201012981.694.12$532
Mar 201017778.394.39$777
Feb 201016373.585.44$887
Jan 20104574.365.96$268
Dec 200914871.445.48$812
Nov 200915674.593.75$585
Oct 200915372.544.11$629
Sep 200916565.543.06$506
Aug 200914367.423.22$460
Jul 200917061.133.46$589
Jun 200918266.163.90$709
May 200918254.743.93$714
Apr 200918146.773.59$649
Mar 200918642.144.06$755
Feb 200918232.814.63$843
Jan 200919335.865.37$1,037
Dec 200818137.105.98$1,082
Nov 200818855.496.86$1,290
Oct 200817075.246.92$1,177
Sep 2008155101.767.88$1,221
Aug 2008191114.228.48$1,620
Jul 2008226131.0811.39$2,574
Jun 2008191131.3313.03$2,489
May 2008213123.1711.57$2,465
Apr 2008186110.3110.45$1,945
Mar 2008104101.909.66$1,005
Feb 200814692.538.77$1,281
Jan 200815790.388.21$1,288
Dec 20077488.337.30$540
Nov 200716191.677.29$1,174
Oct 200716282.856.92$1,121
Sep 200715475.846.24$962
Aug 200710569.066.39$671
Jul 20074370.906.39$275
Jun 2007062.007.55$0
May 20074558.747.85$353
Apr 20073959.617.81$304
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 20079650.306.73$646
Dec 200613956.656.92$962
Nov 200615854.207.62$1,204
Oct 200620354.906.01$1,221
Sep 200610060.085.04$504
Aug 200616468.717.34$1,204
Jul 200619269.376.34$1,218
Jun 200622466.286.38$1,430
May 200620566.016.42$1,317
Apr 200619064.397.36$1,398
Mar 200618256.707.08$1,289
Feb 200617357.597.75$1,341
Jan 200618160.598.93$1,617
Dec 200512854.9413.42$1,717
Nov 200521454.6910.59$2,266
Oct 200520758.3413.80$2,856
Sep 200518661.4512.08$2,247
Aug 200527161.519.80$2,655
Jul 200524455.697.84$1,914
Jun 200524152.337.38$1,779
May 200519145.226.65$1,270
Apr 200519149.207.36$1,406
Mar 200514350.377.15$1,023
Feb 200518645.226.31$1,174
Jan 200510643.166.32$670
Dec 200422139.866.75$1,492
Nov 200424145.286.33$1,526
Oct 200421849.706.52$1,420
Sep 200425843.245.28$1,363
Aug 200429942.375.55$1,660
Jul 200426238.286.08$1,594
Jun 200428036.106.43$1,801
May 200419737.486.49$1,279
Apr 200428634.475.86$1,676
Mar 200431734.365.53$1,753
Feb 200431732.455.51$1,747
Jan 20048832.036.30$554
Dec 20037330.266.30$460
Nov 200325028.804.60$1,149
Oct 200320528.174.76$976
Sep 200327126.314.75$1,287
Aug 200331529.765.13$1,616
Jul 200337029.415.17$1,913
Jun 200315128.565.98$903
May 20032326.595.97$137
Apr 200325126.675.41$1,357
Mar 200329131.146.10$1,774
Feb 200329133.487.93$2,306
Jan 200329130.315.58$1,624
Dec 200235226.914.85$1,709
Nov 200241024.664.14$1,696
Oct 200233126.464.23$1,400
Sep 200232927.443.64$1,196
Aug 200242825.963.16$1,354
Jul 200236024.583.06$1,102
Jun 200238923.733.34$1,299
May 200221624.663.58$774
Apr 200230423.653.51$1,068
Mar 200235322.003.10$1,095
Feb 200231618.222.38$751
Jan 200241917.172.38$995
Dec 200141916.932.36$991
Nov 200133418.072.41$803
Oct 200132219.782.53$814
Sep 200131924.262.25$718
Aug 200122024.873.05$672
Jul 200124123.933.20$771
Jun 200127624.563.82$1,055
May 200133625.524.31$1,447
Apr 200125724.685.34$1,371
Mar 200134624.545.38$1,860
Feb 200125827.755.77$1,488
Jan 200140327.478.40$3,385
Dec 200032626.889.12$2,974
Nov 200055532.215.66$3,140
Oct 200054531.235.15$2,804
Sep 200048131.875.19$2,495
Aug 200038929.644.54$1,766
Jul 200044128.534.09$1,804
Jun 200038829.304.40$1,706
May 200046127.263.68$1,696
Apr 200045924.513.12$1,430
Mar 200038228.422.86$1,092
Feb 200041727.622.73$1,137
Jan 200051025.272.48$1,265
Dec 199945924.282.42$1,112
Nov 199944223.192.43$1,076
Oct 199946120.982.80$1,293
Sep 199952221.752.62$1,367
Aug 199946719.262.88$1,343
Jul 199922617.892.37$536
Jun 199955615.942.36$1,313
May 199943815.792.32$1,017
Apr 199947015.102.21$1,038
Mar 199957012.471.84$1,048
Feb 19996309.981.82$1,145
Jan 199955410.381.90$1,053
Dec 19988449.201.77$1,497
Nov 199851710.892.19$1,130
Oct 199848612.421.97$957
Sep 199846612.592.08$971
Aug 199893611.301.91$1,785
Jul 199871911.742.24$1,609
Jun 199872011.242.24$1,611
May 199862612.622.21$1,381
Apr 199877313.042.51$1,937
Mar 199883112.802.31$1,919
Feb 199861113.952.30$1,405
Jan 199868014.702.15$1,465
Dec 199774816.322.41$1,804
Nov 199763018.193.09$1,946
Oct 199772719.253.15$2,290
Sep 199771817.742.95$2,122
Aug 199781817.862.55$2,090
Jul 199781817.582.25$1,838
Jun 19971,13817.242.26$2,569
May 1997018.972.31$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2022 — as filed, then multipliedworked
Gas                   14 Mcf  × $  5.65 =        $79

────────────────────────────────────────────────────
Month total                                      $79

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/164549 is the state's own key, not one this site invented.