Operated by PRIMAL ENERGY CORPORATION (P-5 677741) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 164726District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$106 k
Jun 1997 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
348
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111998-02-17137456
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition17 bbl$1,405
GasProduction25,898 Mcf$104,182
Total$105,587

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4773, -101.3259. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.47732, -101.32586 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,608 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,608 ft.

Completions filed
Jun 1997
1 of 1 wells

1 well

42-1053763276,608 ftJun 1997

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (348)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

348 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 2024025980.301.55$400
Feb 202401,02276.091.78$1,823
Jan 202408173.023.30$267
Dec 2023047471.262.61$1,237
Nov 2023027577.892.81$772
Oct 2023055885.443.09$1,723
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 202201,27476.415.73$7,299
Nov 2022023085.005.65$1,299
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 2022015104.226.84$103
Mar 202201,353108.885.08$6,868
Feb 2022054791.054.86$2,658
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 202103660.362.76$99
Mar 2021338761.302.72$1,235
Feb 2021010757.805.55$594
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 201901452.782.49$35
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180463.842.90$12
Mar 201811261.222.79$95
Feb 20180461.782.77$11
Jan 20180562.874.01$20
Dec 20170557.272.92$15
Nov 20170755.423.12$22
Oct 20170949.292.98$27
Sep 20170747.523.09$22
Aug 201701445.373.00$42
Jul 201702643.873.09$80
Jun 20170842.493.09$25
May 20170345.373.26$10
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160748.763.72$26
Nov 20160542.492.64$13
Oct 20160746.193.09$22
Sep 201611241.553.10$79
Aug 20160441.442.92$12
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160226.472.06$4
Jan 20160127.352.36$2
Dec 20150132.362.00$2
Nov 20150138.792.17$2
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140286.164.05$8
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140494.734.73$19
Apr 20140795.944.81$34
Mar 20140795.895.06$35
Feb 20140697.406.19$37
Jan 201411090.404.86$139
Dec 20130691.824.35$26
Nov 201311288.853.74$134
Oct 20131797.423.78$124
Sep 201307104.113.72$26
Aug 201309104.253.52$32
Jul 2013113102.523.72$151
Jun 201322094.403.93$267
May 20130294.834.15$8
Apr 20131893.964.28$128
Mar 201322093.623.91$266
Feb 201311391.233.42$136
Jan 201311391.603.42$136
Dec 20121486.773.42$100
Nov 20120786.953.62$25
Oct 20120889.383.40$27
Sep 20120894.672.92$23
Aug 20120492.662.91$12
Jul 20120685.133.02$18
Jun 201201079.822.52$25
May 201201891.612.49$45
Apr 2012032101.652.00$64
Mar 2012034105.052.22$76
Feb 2012020101.102.57$51
Jan 2012037898.092.73$1,033
Dec 20110596.873.24$16
Nov 201101495.723.31$46
Oct 20110784.983.65$26
Sep 201102383.623.99$92
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 201006872.633.98$271
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 201001170.364.91$54
May 201001771.124.24$72
Apr 201001981.694.12$78
Mar 201001578.394.39$66
Feb 201001573.585.44$82
Jan 201001974.365.96$113
Dec 200902071.445.48$110
Nov 200901174.593.75$41
Oct 200902272.544.11$90
Sep 200902265.543.06$67
Aug 200902167.423.22$68
Jul 200902361.133.46$80
Jun 200902266.163.90$86
May 200902354.743.93$90
Apr 200902446.773.59$86
Mar 200902242.144.06$89
Feb 200902232.814.63$102
Jan 200902435.865.37$129
Dec 200802037.105.98$120
Nov 200802355.496.86$158
Oct 200803775.246.92$256
Sep 200800101.767.88$0
Aug 2008020114.228.48$170
Jul 2008015131.0811.39$171
Jun 2008021131.3313.03$274
May 2008017123.1711.57$197
Apr 2008022110.3110.45$230
Mar 2008074101.909.66$715
Feb 200803692.538.77$316
Jan 200805090.388.21$410
Dec 200706488.337.30$467
Nov 200705491.677.29$394
Oct 200704482.856.92$305
Sep 200704875.846.24$300
Aug 200706269.066.39$396
Jul 200706270.906.39$396
Jun 200709062.007.55$679
May 200708558.747.85$667
Apr 20070659.617.81$47
Mar 200704356.927.30$314
Feb 200704155.108.22$337
Jan 2007013550.306.73$908
Dec 200603356.656.92$228
Nov 20060254.207.62$15
Oct 200601554.906.01$90
Sep 200602560.085.04$126
Aug 200604468.717.34$323
Jul 200604069.376.34$254
Jun 200603266.286.38$204
May 20060066.016.42$0
Apr 200605664.397.36$412
Mar 200603956.707.08$276
Feb 200609757.597.75$752
Jan 2006012460.598.93$1,108
Dec 2005015854.9413.42$2,120
Nov 2005014254.6910.59$1,504
Oct 200508558.3413.80$1,173
Sep 200508661.4512.08$1,039
Aug 2005014361.519.80$1,401
Jul 2005010055.697.84$784
Jun 200506852.337.38$502
May 200507545.226.65$499
Apr 200504849.207.36$353
Mar 2005010450.377.15$744
Feb 200505045.226.31$316
Jan 200508643.166.32$544
Dec 200405839.866.75$392
Nov 200405045.286.33$317
Oct 200406449.706.52$417
Sep 200404443.245.28$232
Aug 200407642.375.55$422
Jul 2004010138.286.08$615
Jun 200408836.106.43$566
May 200408137.486.49$526
Apr 200403334.475.86$193
Mar 200406034.365.53$332
Feb 200404932.455.51$270
Jan 200403432.036.30$214
Dec 200305830.266.30$366
Nov 200301228.804.60$55
Oct 200305728.174.76$271
Sep 200303926.314.75$185
Aug 200308229.765.13$421
Jul 200305529.415.17$284
Jun 200309328.565.98$556
May 2003010226.595.97$609
Apr 200306226.675.41$335
Mar 200308731.146.10$530
Feb 200309133.487.93$721
Jan 2003011030.315.58$614
Dec 200208326.914.85$403
Nov 2002015024.664.14$621
Oct 2002010526.464.23$444
Sep 200208327.443.64$302
Aug 2002011925.963.16$377
Jul 2002014024.583.06$429
Jun 2002015823.733.34$527
May 2002018524.663.58$663
Apr 2002012923.653.51$453
Mar 200209522.003.10$295
Feb 200208218.222.38$195
Jan 200206517.172.38$154
Dec 200107216.932.36$170
Nov 200106418.072.41$154
Oct 2001010819.782.53$273
Sep 200108124.262.25$182
Aug 2001010924.873.05$333
Jul 200108423.933.20$269
Jun 200108224.563.82$314
May 200108025.524.31$345
Apr 2001010524.685.34$560
Mar 2001012824.545.38$688
Feb 2001014827.755.77$854
Jan 2001015727.478.40$1,319
Dec 2000014726.889.12$1,341
Nov 2000019832.215.66$1,120
Oct 2000016031.235.15$823
Sep 2000018231.875.19$944
Aug 200008329.644.54$377
Jul 2000014728.534.09$601
Jun 2000021129.304.40$928
May 2000020327.263.68$747
Apr 2000016524.513.12$514
Mar 2000021828.422.86$623
Feb 2000023527.622.73$641
Jan 2000027125.272.48$672
Dec 1999029524.282.42$715
Nov 1999021023.192.43$511
Oct 1999022620.982.80$634
Sep 1999021421.752.62$560
Aug 1999018819.262.88$541
Jul 1999014917.892.37$353
Jun 1999020015.942.36$472
May 1999023415.792.32$543
Apr 1999023315.102.21$514
Mar 1999024012.471.84$441
Feb 199902409.981.82$436
Jan 1999020910.381.90$397
Dec 199802459.201.77$434
Nov 1998027710.892.19$605
Oct 1998023512.421.97$463
Sep 199805612.592.08$117
Aug 199809611.301.91$183
Jul 1998033211.742.24$743
Jun 1998035811.242.24$801
May 1998036112.622.21$796
Apr 1998041413.042.51$1,037
Mar 1998044312.802.31$1,023
Feb 1998043013.952.30$989
Jan 1998039014.702.15$840
Dec 1997045716.322.41$1,102
Nov 1997046818.193.09$1,445
Oct 1997051519.253.15$1,622
Sep 1997061217.742.95$1,808
Aug 1997049217.862.55$1,257
Jul 19970017.582.25$0
Jun 19970017.242.26$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 80.30 =         $0
Gas                  259 Mcf  × $  1.55 =       $400

────────────────────────────────────────────────────
Month total                                     $400

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/164726 is the state's own key, not one this site invented.