HOOVER "50"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 166928District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$655 k
Sep 1997 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
345
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111998-04-06137956
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition21 bbl$1,358
GasProduction152,989 Mcf$654,047
Total$655,406

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4480, -101.5382. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.44804, -101.53819 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,300 ft.

Completions filed
Sep 1997
1 of 1 wells

1 well

42-1053782277,300 ftSep 1997

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (345)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

345 months

May 20260196106.413.05$597
Apr 2026119998.932.87$670
Mar 20260089.753.15$0
Feb 2026114363.503.75$600
Jan 2026117259.138.00$1,435
Dec 2025217556.664.41$886
Nov 2025216458.593.93$761
Oct 2025116059.383.30$588
Sep 2025116962.743.08$583
Aug 2025217363.933.01$649
Jul 2025117166.743.32$634
Jun 2025117166.483.13$601
May 2025217160.553.23$674
Apr 2025216162.363.54$695
Mar 2025217267.704.27$870
Feb 2025217870.884.34$914
Jan 20250074.324.28$0
Dec 2024016768.993.12$521
Nov 2024016769.052.20$367
Oct 2024017871.372.28$406
Sep 2024015669.612.36$369
Aug 2024017475.632.06$359
Jul 2024017779.932.15$380
Jun 2024017278.082.63$453
May 2024015078.812.20$330
Apr 2024014384.451.66$237
Mar 2024014780.301.55$227
Feb 2024013576.091.78$241
Jan 2024015473.023.30$508
Dec 2023015471.262.61$402
Nov 2023014177.892.81$396
Oct 2023012685.443.09$389
Sep 2023014089.042.74$383
Aug 2023019180.522.67$511
Jul 2023019774.852.64$520
Jun 2023020068.962.26$452
May 2023013270.622.23$294
Apr 2023018278.122.24$407
Mar 2023019072.852.39$455
Feb 2023017275.112.47$424
Jan 2023019376.533.39$654
Dec 2022018876.415.73$1,077
Nov 2022019185.005.65$1,078
Oct 2022019687.185.86$1,149
Sep 2022019784.888.16$1,608
Aug 2022020894.529.13$1,898
Jul 20220227101.587.54$1,712
Jun 2022073115.097.98$582
May 20220120109.378.43$1,012
Apr 20220216104.226.84$1,477
Mar 20220106108.885.08$538
Feb 202207791.054.86$374
Jan 2022019381.844.54$876
Dec 2021021071.323.90$819
Nov 2021020077.435.24$1,047
Oct 2021021979.795.71$1,251
Sep 2021021669.865.35$1,156
Aug 2021020966.024.22$882
Jul 2021022270.783.98$884
Jun 2021023069.493.38$778
May 2021016863.483.02$507
Apr 2021022360.362.76$615
Mar 2021023861.302.72$647
Feb 2021022157.805.55$1,226
Jan 2021024750.412.81$694
Dec 2020015944.642.68$425
Nov 2020017238.772.71$466
Oct 2020018236.972.48$451
Sep 2020015537.091.99$309
Aug 2020017139.982.39$408
Jul 2020017338.371.83$316
Jun 2020017334.901.69$292
May 2020018216.921.81$330
Apr 2020020214.751.80$364
Mar 2020021230.341.86$394
Feb 2020019249.881.98$380
Jan 2020023257.252.09$486
Dec 2019023759.012.30$546
Nov 2019023755.302.75$652
Oct 2019019653.472.42$474
Sep 2019020655.052.66$547
Aug 2019024753.112.30$569
Jul 2019023356.272.46$573
Jun 2019023352.782.49$580
May 2019024658.482.74$674
Apr 2019023562.632.75$646
Mar 2019024556.803.06$750
Feb 2019022150.852.79$617
Jan 2019024846.033.23$801
Dec 2018025346.594.19$1,059
Nov 2018021752.934.24$919
Oct 2018024261.443.40$822
Sep 2018024359.543.11$755
Aug 2018020059.403.07$613
Jul 2018025265.142.93$739
Jun 2018024560.183.08$754
May 2018025365.382.90$734
Apr 2018024963.842.90$722
Mar 2018025661.222.79$713
Feb 2018023561.782.77$650
Jan 2018025962.874.01$1,038
Dec 2017026757.272.92$780
Nov 2017026055.423.12$811
Oct 2017026849.292.98$800
Sep 2017026147.523.09$806
Aug 2017025245.373.00$757
Jul 2017025943.873.09$800
Jun 2017016742.493.09$516
May 2017024645.373.26$803
Apr 201706247.933.21$199
Mar 2017017246.772.98$513
Feb 2017033750.452.95$995
Jan 2017026749.413.42$913
Dec 2016027048.763.72$1,005
Nov 2016026442.492.64$698
Oct 2016027746.193.09$856
Sep 2016027841.553.10$862
Aug 2016022741.442.92$664
Jul 2016025841.622.92$754
Jun 2016019345.352.69$518
May 2016025142.521.99$500
Apr 2016013936.561.99$277
Mar 2016023633.011.79$423
Feb 2016021826.472.06$450
Jan 2016025827.352.36$610
Dec 2015029432.362.00$588
Nov 2015023238.792.17$503
Oct 2015024543.552.43$595
Sep 2015024242.992.76$668
Aug 2015021540.162.87$618
Jul 2015027348.152.95$804
Jun 2015026356.152.88$758
May 2015027755.212.96$819
Apr 2015026249.822.71$709
Mar 2015026742.892.93$784
Feb 2015025244.662.98$750
Jan 2015026143.433.10$809
Dec 2014027354.693.59$980
Nov 2014026170.464.25$1,110
Oct 2014028178.303.90$1,096
Sep 2014027186.164.05$1,096
Aug 2014029689.394.04$1,194
Jul 2014029896.564.18$1,246
Jun 2014029198.164.74$1,378
May 2014030494.734.73$1,437
Apr 2014029795.944.81$1,428
Mar 2014023995.895.06$1,209
Feb 2014026797.406.19$1,653
Jan 2014029090.404.86$1,410
Dec 2013028491.824.35$1,237
Nov 2013028988.853.74$1,080
Oct 2013029897.423.78$1,126
Sep 20130289104.113.72$1,074
Aug 20130305104.253.52$1,074
Jul 20130312102.523.72$1,160
Jun 2013033894.403.93$1,329
May 2013021494.834.15$888
Apr 2013031993.964.28$1,366
Mar 2013024193.623.91$943
Feb 2013028791.233.42$982
Jan 2013031791.603.42$1,084
Dec 2012031686.773.42$1,081
Nov 2012030786.953.62$1,113
Oct 2012032189.383.40$1,091
Sep 2012032494.672.92$946
Aug 2012034392.662.91$998
Jul 2012030685.133.02$924
Jun 2012032079.822.52$806
May 2012036891.612.49$916
Apr 20120234101.652.00$467
Mar 20120315105.052.22$700
Feb 20120298101.102.57$766
Jan 2012029998.092.73$817
Dec 2011030596.873.24$988
Nov 2011030495.723.31$1,007
Oct 2011031384.983.65$1,142
Sep 2011029583.623.99$1,176
Aug 2011031683.404.15$1,311
Jul 2011031894.144.52$1,436
Jun 2011028692.904.64$1,327
May 2011032098.134.40$1,410
Apr 20110304105.964.33$1,317
Mar 2011032196.364.06$1,302
Feb 2011031685.644.18$1,321
Jan 2011032486.504.59$1,487
Dec 2010031285.734.35$1,357
Nov 2010032880.843.80$1,245
Oct 2010032578.103.51$1,140
Sep 2010032472.633.98$1,289
Aug 2010033673.684.42$1,485
Jul 2010036172.554.74$1,710
Jun 2010028870.364.91$1,414
May 2010033971.124.24$1,436
Apr 2010030581.694.12$1,257
Mar 2010037478.394.39$1,641
Feb 2010034673.585.44$1,883
Jan 2010038074.365.96$2,266
Dec 2009038271.445.48$2,095
Nov 2009037174.593.75$1,392
Oct 2009036172.544.11$1,484
Sep 2009036965.543.06$1,131
Aug 2009037667.423.22$1,210
Jul 2009037261.133.46$1,289
Jun 2009036466.163.90$1,418
May 2009037854.743.93$1,484
Apr 2009037846.773.59$1,356
Mar 2009040542.144.06$1,644
Feb 2009040932.814.63$1,895
Jan 2009027335.865.37$1,466
Dec 2008043437.105.98$2,594
Nov 2008043055.496.86$2,950
Oct 200801,99475.246.92$13,802
Sep 20080717101.767.88$5,648
Aug 20080545114.228.48$4,623
Jul 20080461131.0811.39$5,251
Jun 20080455131.3313.03$5,930
May 20080448123.1711.57$5,185
Apr 20080439110.3110.45$4,590
Mar 20080428101.909.66$4,136
Feb 2008044092.538.77$3,859
Jan 2008036790.388.21$3,012
Dec 2007035688.337.30$2,600
Nov 2007033091.677.29$2,406
Oct 2007043882.856.92$3,032
Sep 2007040575.846.24$2,529
Aug 2007040869.066.39$2,606
Jul 2007041370.906.39$2,638
Jun 2007026262.007.55$1,978
May 2007037558.747.85$2,942
Apr 2007031959.617.81$2,490
Mar 2007034556.927.30$2,519
Feb 2007031955.108.22$2,621
Jan 2007046650.306.73$3,135
Dec 2006079356.656.92$5,486
Nov 2006087954.207.62$6,696
Oct 2006086354.906.01$5,190
Sep 2006071460.085.04$3,597
Aug 2006059768.717.34$4,382
Jul 2006061769.376.34$3,913
Jun 2006051266.286.38$3,269
May 2006043866.016.42$2,814
Apr 2006055964.397.36$4,115
Mar 2006047356.707.08$3,350
Feb 2006046657.597.75$3,612
Jan 2006051660.598.93$4,610
Dec 2005053554.9413.42$7,177
Nov 2005048754.6910.59$5,157
Oct 2005042258.3413.80$5,822
Sep 2005040861.4512.08$4,928
Aug 2005049661.519.80$4,859
Jul 2005048155.697.84$3,773
Jun 2005038952.337.38$2,871
May 2005057445.226.65$3,818
Apr 2005053349.207.36$3,923
Mar 2005044850.377.15$3,205
Feb 2005052445.226.31$3,307
Jan 2005058543.166.32$3,698
Dec 2004048839.866.75$3,295
Nov 2004052645.286.33$3,330
Oct 2004062149.706.52$4,046
Sep 2004063943.245.28$3,376
Aug 2004058442.375.55$3,242
Jul 2004069238.286.08$4,210
Jun 2004061236.106.43$3,937
May 2004059437.486.49$3,858
Apr 2004087034.475.86$5,097
Mar 2004027234.365.53$1,504
Feb 2004068332.455.51$3,763
Jan 2004055732.036.30$3,509
Dec 2003060530.266.30$3,812
Nov 2003062328.804.60$2,863
Oct 2003062028.174.76$2,951
Sep 2003042726.314.75$2,028
Aug 2003054529.765.13$2,796
Jul 2003053629.415.17$2,772
Jun 2003062028.565.98$3,709
May 2003073026.595.97$4,360
Apr 2003065926.675.41$3,563
Mar 2003067831.146.10$4,133
Feb 2003051633.487.93$4,090
Jan 2003059930.315.58$3,344
Dec 2002069226.914.85$3,359
Nov 2002069024.664.14$2,855
Oct 2002083826.464.23$3,544
Sep 2002082627.443.64$3,003
Aug 2002086825.963.16$2,746
Jul 2002090724.583.06$2,777
Jun 2002081823.733.34$2,731
May 2002085024.663.58$3,046
Apr 2002086323.653.51$3,031
Mar 2002069222.003.10$2,147
Feb 2002057018.222.38$1,354
Jan 2002073417.172.38$1,744
Dec 2001081816.932.36$1,934
Nov 2001069518.072.41$1,672
Oct 2001068519.782.53$1,732
Sep 2001068024.262.25$1,531
Aug 2001074824.873.05$2,284
Jul 2001071823.933.20$2,296
Jun 2001076224.563.82$2,914
May 2001071025.524.31$3,058
Apr 2001064024.685.34$3,415
Mar 2001078024.545.38$4,194
Feb 2001074227.755.77$4,279
Jan 2001077327.478.40$6,492
Dec 2000072526.889.12$6,614
Nov 2000096932.215.66$5,483
Oct 2000086531.235.15$4,451
Sep 2000078031.875.19$4,045
Aug 2000099829.644.54$4,532
Jul 200001,10228.534.09$4,507
Jun 2000096329.304.40$4,235
May 2000093027.263.68$3,422
Apr 2000081024.513.12$2,524
Mar 200001,00828.422.86$2,883
Feb 200001,14127.622.73$3,111
Jan 2000091525.272.48$2,270
Dec 1999096624.282.42$2,341
Nov 1999089123.192.43$2,169
Oct 199901,03120.982.80$2,891
Sep 1999098821.752.62$2,587
Aug 1999085819.262.88$2,467
Jul 199901,04217.892.37$2,472
Jun 199901,21015.942.36$2,858
May 1999099915.792.32$2,319
Apr 1999098415.102.21$2,173
Mar 1999080612.471.84$1,482
Feb 199909089.981.82$1,651
Jan 199901,15710.381.90$2,198
Dec 199801,2549.201.77$2,224
Nov 199801,27910.892.19$2,796
Oct 199801,34412.421.97$2,647
Sep 199801,47312.592.08$3,068
Aug 199801,72611.301.91$3,292
Jul 199801,40811.742.24$3,150
Jun 199801,78711.242.24$3,998
May 199801,60212.622.21$3,535
Apr 199801,77013.042.51$4,434
Mar 199802,02012.802.31$4,665
Feb 199801,62513.952.30$3,736
Jan 199801,69014.702.15$3,642
Dec 199701,34116.322.41$3,233
Nov 1997097018.193.09$2,996
Oct 1997079519.253.15$2,504
Sep 19970017.742.95$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  196 Mcf  × $  3.05 =       $597

────────────────────────────────────────────────────
Month total                                     $597

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/166928 is the state's own key, not one this site invented.