SUTTON

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 167690District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Feb 1998 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
340
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111998-05-15138611
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition625 bbl$10,110
GasProduction335,134 Mcf$1,328,039
Total$1,338,150

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4814, -101.2695. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.48142, -101.26951 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,564 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,564 ft.

Completions filed
Feb 1998
1 of 1 wells

1 well

42-105379851096,564 ftFeb 1998

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (340)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

340 months

May 20260212106.413.05$646
Apr 2026016998.932.87$485
Mar 20260089.753.15$0
Feb 2026015763.503.75$589
Jan 2026016859.138.00$1,344
Dec 2025016456.664.41$724
Nov 2025017458.593.93$683
Oct 2025015859.383.30$522
Sep 2025015862.743.08$486
Aug 2025016163.933.01$485
Jul 2025016966.743.32$560
Jun 2025015666.483.13$488
May 2025010060.553.23$323
Apr 2025010962.363.54$386
Mar 2025016767.704.27$713
Feb 2025015170.884.34$655
Jan 20250074.324.28$0
Dec 2024022168.993.12$690
Nov 2024016869.052.20$369
Oct 2024015271.372.28$347
Sep 2024016469.612.36$388
Aug 2024023075.632.06$475
Jul 2024024679.932.15$528
Jun 2024020378.082.63$535
May 2024021578.812.20$473
Apr 2024024184.451.66$400
Mar 2024024780.301.55$382
Feb 2024023876.091.78$425
Jan 2024025173.023.30$828
Dec 2023023271.262.61$606
Nov 2023024277.892.81$679
Oct 2023024685.443.09$759
Sep 2023023689.042.74$645
Aug 2023023380.522.67$623
Jul 2023025374.852.64$668
Jun 2023023868.962.26$538
May 2023021870.622.23$486
Apr 2023027278.122.24$609
Mar 2023028872.852.39$689
Feb 2023017675.112.47$434
Jan 2023024776.533.39$837
Dec 2022025476.415.73$1,455
Nov 2022014585.005.65$819
Oct 2022021687.185.86$1,267
Sep 2022020284.888.16$1,649
Aug 2022019694.529.13$1,789
Jul 20220195101.587.54$1,471
Jun 20220221115.097.98$1,763
May 20220216109.378.43$1,822
Apr 20220189104.226.84$1,292
Mar 20220183108.885.08$929
Feb 2022016091.054.86$777
Jan 2022018781.844.54$849
Dec 2021019171.323.90$745
Nov 2021018177.435.24$948
Oct 2021019479.795.71$1,108
Sep 2021020369.865.35$1,086
Aug 2021020566.024.22$865
Jul 2021021470.783.98$852
Jun 2021021069.493.38$710
May 2021018163.483.02$546
Apr 2021031560.362.76$869
Mar 2021045261.302.72$1,228
Feb 2021039657.805.55$2,197
Jan 2021018050.412.81$506
Dec 2020050144.642.68$1,340
Nov 2020049438.772.71$1,337
Oct 2020035036.972.48$867
Sep 2020044937.091.99$894
Aug 2020051039.982.39$1,216
Jul 2020052838.371.83$964
Jun 2020025834.901.69$436
May 2020021916.921.81$397
Apr 2020029314.751.80$529
Mar 2020052430.341.86$973
Feb 2020050549.881.98$1,000
Jan 2020020657.252.09$432
Dec 2019014259.012.30$327
Nov 2019023055.302.75$633
Oct 2019021253.472.42$513
Sep 20190055.052.66$0
Aug 2019032553.112.30$749
Jul 2019032556.272.46$800
Jun 2019039152.782.49$974
May 2019036758.482.74$1,006
Apr 2019020162.632.75$553
Mar 2019021156.803.06$646
Feb 2019033250.852.79$927
Jan 2019017746.033.23$571
Dec 2018012346.594.19$515
Nov 2018015952.934.24$674
Oct 20182020961.443.40$1,939
Sep 2018028059.543.11$870
Aug 2018022959.403.07$702
Jul 2018041565.142.93$1,217
Jun 2018027060.183.08$831
May 2018045165.382.90$1,308
Apr 2018035963.842.90$1,041
Mar 2018038261.222.79$1,065
Feb 2018030861.782.77$852
Jan 2018040662.874.01$1,628
Dec 2017043357.272.92$1,265
Nov 2017042155.423.12$1,313
Oct 2017048949.292.98$1,459
Sep 2017035547.523.09$1,096
Aug 2017049445.373.00$1,484
Jul 2017047243.873.09$1,457
Jun 2017044342.493.09$1,368
May 2017042345.373.26$1,380
Apr 2017043647.933.21$1,400
Mar 2017052046.772.98$1,552
Feb 2017037050.452.95$1,092
Jan 2017040549.413.42$1,385
Dec 2016044348.763.72$1,649
Nov 2016049042.492.64$1,296
Oct 2016053946.193.09$1,666
Sep 2016038241.553.10$1,184
Aug 2016034241.442.92$1,000
Jul 2016039641.622.92$1,158
Jun 2016031445.352.69$843
May 2016034242.521.99$681
Apr 2016028636.561.99$569
Mar 2016025733.011.79$461
Feb 2016029326.472.06$605
Jan 2016036127.352.36$854
Dec 2015048332.362.00$967
Nov 2015033938.792.17$735
Oct 2015046843.552.43$1,136
Sep 2015039242.992.76$1,081
Aug 2015037540.162.87$1,077
Jul 2015023948.152.95$704
Jun 2015041456.152.88$1,194
May 2015042455.212.96$1,253
Apr 2015042749.822.71$1,156
Mar 2015049342.892.93$1,447
Feb 2015044744.662.98$1,330
Jan 2015067843.433.10$2,102
Dec 2014764954.693.59$2,714
Nov 2014062770.464.25$2,666
Oct 2014051678.303.90$2,013
Sep 2014055386.164.05$2,237
Aug 2014083489.394.04$3,365
Jul 2014056796.564.18$2,370
Jun 2014042898.164.74$2,027
May 2014058694.734.73$2,770
Apr 2014034595.944.81$1,659
Mar 2014042995.895.06$2,169
Feb 2014047897.406.19$2,960
Jan 2014061090.404.86$2,965
Dec 2013049791.824.35$2,164
Nov 2013043688.853.74$1,630
Oct 2013032397.423.78$1,221
Sep 20130353104.113.72$1,312
Aug 20130420104.253.52$1,480
Jul 20130535102.523.72$1,989
Jun 2013062694.403.93$2,462
May 2013049094.834.15$2,033
Apr 2013051393.964.28$2,197
Mar 2013041193.623.91$1,608
Feb 2013057891.233.42$1,977
Jan 2013072791.603.42$2,486
Dec 2012056586.773.42$1,932
Nov 2012065486.953.62$2,371
Oct 2012055889.383.40$1,897
Sep 2012063294.672.92$1,844
Aug 2012055592.662.91$1,614
Jul 2012056385.133.02$1,701
Jun 2012050379.822.52$1,267
May 2012047591.612.49$1,182
Apr 20120597101.652.00$1,192
Mar 20120396105.052.22$880
Feb 20120586101.102.57$1,506
Jan 2012060998.092.73$1,665
Dec 2011058896.873.24$1,905
Nov 2011067495.723.31$2,232
Oct 2011056984.983.65$2,076
Sep 2011051383.623.99$2,045
Aug 2011058883.404.15$2,440
Jul 2011071194.144.52$3,212
Jun 2011052592.904.64$2,436
May 2011055498.134.40$2,440
Apr 20110422105.964.33$1,829
Mar 2011040196.364.06$1,627
Feb 2011038585.644.18$1,609
Jan 2011063886.504.59$2,928
Dec 2010072585.734.35$3,152
Nov 2010070280.843.80$2,664
Oct 2010063978.103.51$2,242
Sep 2010036972.633.98$1,468
Aug 2010062373.684.42$2,753
Jul 2010058972.554.74$2,790
Jun 2010051470.364.91$2,524
May 2010050871.124.24$2,151
Apr 2010047981.694.12$1,975
Mar 2010051678.394.39$2,265
Feb 2010041773.585.44$2,269
Jan 2010046574.365.96$2,773
Dec 2009082671.445.48$4,530
Nov 2009076974.593.75$2,885
Oct 2009072972.544.11$2,996
Sep 2009079665.543.06$2,440
Aug 2009085367.423.22$2,745
Jul 2009075061.133.46$2,598
Jun 2009079866.163.90$3,108
May 2009082454.743.93$3,235
Apr 2009072646.773.59$2,605
Mar 2009092342.144.06$3,746
Feb 200901,01832.814.63$4,716
Jan 2009094435.865.37$5,070
Dec 2008093537.105.98$5,589
Nov 2008091255.496.86$6,257
Oct 200801,05375.246.92$7,289
Sep 20080652101.767.88$5,136
Aug 20080981114.228.48$8,322
Jul 200801,037131.0811.39$11,811
Jun 20080570131.3313.03$7,429
May 20080715123.1711.57$8,276
Apr 20080884110.3110.45$9,242
Mar 20080795101.909.66$7,683
Feb 2008086692.538.77$7,595
Jan 2008092490.388.21$7,582
Dec 200701,16288.337.30$8,485
Nov 200701,02191.677.29$7,445
Oct 200701,11882.856.92$7,739
Sep 2007083575.846.24$5,214
Aug 200711,43169.066.39$9,210
Jul 200701,00570.906.39$6,420
Jun 2007054762.007.55$4,129
May 2007049558.747.85$3,884
Apr 2007074259.617.81$5,791
Mar 2007068756.927.30$5,016
Feb 2007069055.108.22$5,669
Jan 2007066050.306.73$4,440
Dec 2006055056.656.92$3,805
Nov 2006062054.207.62$4,723
Oct 2006061954.906.01$3,723
Sep 2006072660.085.04$3,657
Aug 2006078068.717.34$5,725
Jul 2006080869.376.34$5,125
Jun 2006074466.286.38$4,750
May 2006080066.016.42$5,140
Apr 2006086964.397.36$6,396
Mar 200601,03456.707.08$7,324
Feb 2006090057.597.75$6,976
Jan 200601,07060.598.93$9,559
Dec 200501,04754.9413.42$14,046
Nov 2005084554.6910.59$8,947
Oct 2005099958.3413.80$13,782
Sep 2005082961.4512.08$10,013
Aug 2005089061.519.80$8,719
Jul 2005094455.697.84$7,404
Jun 200501,06252.337.38$7,839
May 200501,02545.226.65$6,817
Apr 200501,17049.207.36$8,612
Mar 200501,27450.377.15$9,115
Feb 200501,07445.226.31$6,779
Jan 200501,26643.166.32$8,004
Dec 200401,17139.866.75$7,906
Nov 200401,08245.286.33$6,850
Oct 200401,17249.706.52$7,636
Sep 200401,14043.245.28$6,024
Aug 200401,35342.375.55$7,510
Jul 200401,29938.286.08$7,903
Jun 200401,16836.106.43$7,514
May 200401,17837.486.49$7,651
Apr 200401,12534.475.86$6,591
Mar 200401,52934.365.53$8,456
Feb 200401,40032.455.51$7,713
Jan 200401,38932.036.30$8,750
Dec 200301,64630.266.30$10,373
Nov 200301,51428.804.60$6,957
Oct 200301,67328.174.76$7,963
Sep 200301,46526.314.75$6,958
Aug 200301,43029.765.13$7,336
Jul 200301,27529.415.17$6,593
Jun 200301,26028.565.98$7,539
May 200301,37826.595.97$8,230
Apr 200301,31426.675.41$7,105
Mar 200301,36631.146.10$8,327
Feb 200301,25533.487.93$9,947
Jan 200301,64630.315.58$9,188
Dec 2002171,61826.914.85$8,311
Nov 200201,53424.664.14$6,346
Oct 200201,70226.464.23$7,198
Sep 200201,62327.443.64$5,900
Aug 200201,67125.963.16$5,287
Jul 200201,57824.583.06$4,831
Jun 200201,63923.733.34$5,471
May 200201,71124.663.58$6,132
Apr 200201,54223.653.51$5,416
Mar 200201,61322.003.10$5,005
Feb 200201,75318.222.38$4,165
Jan 200201,78517.172.38$4,241
Dec 2001151,97816.932.36$4,931
Nov 200101,62218.072.41$3,902
Oct 200101,01719.782.53$2,572
Sep 2001042024.262.25$946
Aug 2001064324.873.05$1,963
Jul 200101,02423.933.20$3,274
Jun 2001085724.563.82$3,277
May 200101,33225.524.31$5,737
Apr 200101,02124.685.34$5,447
Mar 200101,66324.545.38$8,941
Feb 2001191,42027.755.77$8,717
Jan 200102,08627.478.40$17,520
Dec 200041,96826.889.12$18,061
Nov 200001,77832.215.66$10,060
Oct 200001,46531.235.15$7,538
Sep 200001,81931.875.19$9,434
Aug 200002,09729.644.54$9,522
Jul 200002,43028.534.09$9,938
Jun 200002,40429.304.40$10,571
May 200002,56027.263.68$9,420
Apr 200002,35424.513.12$7,335
Mar 200002,56828.422.86$7,344
Feb 200002,19027.622.73$5,971
Jan 200003,05325.272.48$7,573
Dec 199902,93724.282.42$7,118
Nov 199902,42623.192.43$5,905
Oct 199903,47820.982.80$9,751
Sep 1999663,07521.752.62$9,488
Aug 199903,33019.262.88$9,576
Jul 199903,92617.892.37$9,314
Jun 199903,45115.942.36$8,152
May 199903,89715.792.32$9,045
Apr 1999792,92415.102.21$7,649
Mar 199903,91412.471.84$7,195
Feb 199903,7559.981.82$6,826
Jan 199903,91010.381.90$7,429
Dec 19981354,6999.201.77$9,575
Nov 199805,25010.892.19$11,475
Oct 199805,48612.421.97$10,803
Sep 199805,72612.592.08$11,925
Aug 199805,83011.301.91$11,120
Jul 19981167,85311.742.24$18,931
Jun 199806,89511.242.24$15,426
May 1998998,23712.622.21$19,423
Apr 1998010,85313.042.51$27,190
Mar 19984712,27712.802.31$28,955
Feb 199802,94113.952.30$6,762

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  212 Mcf  × $  3.05 =       $646

────────────────────────────────────────────────────
Month total                                     $646

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/167690 is the state's own key, not one this site invented.