Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 178733District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$500 k
Jun 2000 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
312
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112000-10-31142519
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition242 bbl$9,455
GasProduction92,517 Mcf$490,280
Total$499,735

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3567, -100.4719. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.35673, -100.47194 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,500 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,500 ft.

Completions filed
Jun 2000
1 of 1 wells

1 well

42-43535109165,500 ftJun 2000

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (312)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

312 months

May 2026035106.413.05$107
Apr 202603398.932.87$95
Mar 202603589.753.15$110
Feb 202603263.503.75$120
Jan 202603659.138.00$288
Dec 202503556.664.41$154
Nov 202503658.593.93$141
Oct 202503159.383.30$102
Sep 202503462.743.08$105
Aug 202503663.933.01$109
Jul 202503666.743.32$119
Jun 202503566.483.13$110
May 202503760.553.23$120
Apr 202503662.363.54$128
Mar 202503767.704.27$158
Feb 202503670.884.34$156
Jan 202502774.324.28$116
Dec 202403868.993.12$119
Nov 202401169.052.20$24
Oct 202402971.372.28$66
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240776.091.78$12
Jan 202402073.023.30$66
Dec 202301671.262.61$42
Nov 202301877.892.81$51
Oct 202301585.443.09$46
Sep 202301689.042.74$44
Aug 202301780.522.67$45
Jul 202301874.852.64$48
Jun 202302068.962.26$45
May 202302170.622.23$47
Apr 202302078.122.24$45
Mar 202302172.852.39$50
Feb 202301875.112.47$44
Jan 202302176.533.39$71
Dec 202202376.415.73$132
Nov 202203285.005.65$181
Oct 202203687.185.86$211
Sep 20220284.888.16$16
Aug 20220094.529.13$0
Jul 202201101.587.54$8
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210379.795.71$17
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210169.493.38$3
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 202001444.642.68$37
Nov 202002338.772.71$62
Oct 202002236.972.48$55
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200738.371.83$13
Jun 20200434.901.69$7
May 202001816.921.81$33
Apr 202002014.751.80$36
Mar 20200930.341.86$17
Feb 202001149.881.98$22
Jan 20200557.252.09$10
Dec 20190959.012.30$21
Nov 201901555.302.75$41
Oct 201902053.472.42$48
Sep 201903155.052.66$82
Aug 201902153.112.30$48
Jul 201902856.272.46$69
Jun 201901852.782.49$45
May 201902058.482.74$55
Apr 201903262.632.75$88
Mar 201903256.803.06$98
Feb 201903050.852.79$84
Jan 201902646.033.23$84
Dec 201802346.594.19$96
Nov 201803752.934.24$157
Oct 201804161.443.40$139
Sep 201804059.543.11$124
Aug 201804159.403.07$126
Jul 201803865.142.93$111
Jun 201804560.183.08$138
May 201804765.382.90$136
Apr 201804763.842.90$136
Mar 201804861.222.79$134
Feb 201804361.782.77$119
Jan 201804762.874.01$188
Dec 201704457.272.92$129
Nov 201704655.423.12$143
Oct 201704949.292.98$146
Sep 201705047.523.09$154
Aug 201704545.373.00$135
Jul 201704943.873.09$151
Jun 201705242.493.09$161
May 201704645.373.26$150
Apr 201705247.933.21$167
Mar 201705446.772.98$161
Feb 201704850.452.95$142
Jan 201705549.413.42$188
Dec 201605448.763.72$201
Nov 201605442.492.64$143
Oct 201605546.193.09$170
Sep 201605541.553.10$171
Aug 201605641.442.92$164
Jul 201605641.622.92$164
Jun 201605745.352.69$153
May 201605942.521.99$117
Apr 201605736.561.99$113
Mar 201605733.011.79$102
Feb 201605326.472.06$109
Jan 201605027.352.36$118
Dec 201507332.362.00$146
Nov 201503338.792.17$72
Oct 201506043.552.43$146
Sep 201506742.992.76$185
Aug 201504440.162.87$126
Jul 201506148.152.95$180
Jun 201506256.152.88$179
May 201506455.212.96$189
Apr 201506049.822.71$162
Mar 201505742.892.93$167
Feb 201504344.662.98$128
Jan 201504343.433.10$133
Dec 201405654.693.59$201
Nov 201405770.464.25$242
Oct 201406578.303.90$254
Sep 201406586.164.05$263
Aug 201406989.394.04$278
Jul 201407096.564.18$293
Jun 201407098.164.74$332
May 201408294.734.73$388
Apr 201406395.944.81$303
Mar 201407095.895.06$354
Feb 201406097.406.19$372
Jan 201406690.404.86$321
Dec 201306291.824.35$270
Nov 201306588.853.74$243
Oct 201306997.423.78$261
Sep 2013069104.113.72$257
Aug 2013069104.253.52$243
Jul 2013073102.523.72$271
Jun 201307294.403.93$283
May 201307794.834.15$319
Apr 201307893.964.28$334
Mar 201308993.623.91$348
Feb 201308491.233.42$287
Jan 2013011291.603.42$383
Dec 2012014586.773.42$496
Nov 201205286.953.62$189
Oct 2012012289.383.40$415
Sep 2012012094.672.92$350
Aug 2012112192.662.91$445
Jul 2012012285.133.02$369
Jun 2012112779.822.52$400
May 201206191.612.49$152
Apr 2012098101.652.00$196
Mar 20120133105.052.22$296
Feb 20121114101.102.57$394
Jan 2012010298.092.73$279
Dec 201109996.873.24$321
Nov 201119795.723.31$417
Oct 2011012484.983.65$452
Sep 2011013183.623.99$522
Aug 201107983.404.15$328
Jul 2011012794.144.52$574
Jun 2011114192.904.64$747
May 2011017698.134.40$775
Apr 20111231105.964.33$1,107
Mar 2011024496.364.06$990
Feb 2011122985.644.18$1,043
Jan 2011027186.504.59$1,244
Dec 2010126385.734.35$1,229
Nov 2010026380.843.80$998
Oct 2010232078.103.51$1,279
Sep 2010028672.633.98$1,138
Aug 2010034273.684.42$1,511
Jul 2010112572.554.74$665
Jun 2010017970.364.91$879
May 2010028371.124.24$1,199
Apr 2010234281.694.12$1,573
Mar 2010035678.394.39$1,562
Feb 2010126073.585.44$1,489
Jan 2010029574.365.96$1,759
Dec 2009029771.445.48$1,629
Nov 2009133674.593.75$1,335
Oct 2009034372.544.11$1,410
Sep 2009033065.543.06$1,011
Aug 2009034267.423.22$1,101
Jul 2009035461.133.46$1,226
Jun 2009234866.163.90$1,488
May 2009034754.743.93$1,362
Apr 2009228146.773.59$1,102
Mar 2009233242.144.06$1,432
Feb 2009033932.814.63$1,571
Jan 2009038235.865.37$2,052
Dec 2008235137.105.98$2,172
Nov 2008037155.496.86$2,545
Oct 2008128775.246.92$2,062
Sep 20081308101.767.88$2,528
Aug 20080338114.228.48$2,867
Jul 20082368131.0811.39$4,453
Jun 20082360131.3313.03$4,954
May 20082445123.1711.57$5,397
Apr 20080371110.3110.45$3,879
Mar 20080361101.909.66$3,489
Feb 2008233492.538.77$3,114
Jan 2008039390.388.21$3,225
Dec 2007038088.337.30$2,775
Nov 2007032491.677.29$2,363
Oct 2007335082.856.92$2,671
Sep 2007044675.846.24$2,785
Aug 2007064769.066.39$4,133
Jul 2007065070.906.39$4,152
Jun 2007445662.007.55$3,690
May 2007353458.747.85$4,366
Apr 2007062459.617.81$4,870
Mar 2007667756.927.30$5,285
Feb 2007057855.108.22$4,749
Jan 2007060250.306.73$4,050
Dec 2006066256.656.92$4,580
Nov 2006069254.207.62$5,271
Oct 2006569654.906.01$4,460
Sep 2006465460.085.04$3,535
Aug 2006068268.717.34$5,006
Jul 2006071269.376.34$4,516
Jun 2006069466.286.38$4,430
May 2006465466.016.42$4,466
Apr 2006065964.397.36$4,851
Mar 2006082456.707.08$5,836
Feb 2006064857.597.75$5,023
Jan 2006051260.598.93$4,574
Dec 2005021854.9413.42$2,925
Nov 2005122954.6910.59$2,479
Oct 2005023958.3413.80$3,297
Sep 2005020961.4512.08$2,525
Aug 2005212761.519.80$1,367
Jul 200509155.697.84$714
Jun 200509452.337.38$694
May 2005034945.226.65$2,321
Apr 2005355649.207.36$4,240
Mar 2005052350.377.15$3,742
Feb 2005048045.226.31$3,030
Jan 2005048043.166.32$3,035
Dec 2004050239.866.75$3,389
Nov 2004047245.286.33$2,988
Oct 2004358849.706.52$3,980
Sep 2004251143.245.28$2,787
Aug 2004250842.375.55$2,904
Jul 2004056238.286.08$3,419
Jun 2004251436.106.43$3,379
May 2004049837.486.49$3,234
Apr 2004250934.475.86$3,051
Mar 2004241334.365.53$2,353
Feb 2004040832.455.51$2,248
Jan 2004045332.036.30$2,854
Dec 2003246430.266.30$2,984
Nov 2003247828.804.60$2,254
Oct 2003257228.174.76$2,779
Sep 2003247326.314.75$2,299
Aug 2003549429.765.13$2,683
Jul 200331,00529.415.17$5,285
Jun 2003573428.565.98$4,534
May 2003268526.595.97$4,144
Apr 2003562026.675.41$3,486
Mar 2003262731.146.10$3,885
Feb 2003056133.487.93$4,446
Jan 2003063330.315.58$3,533
Dec 2002054626.914.85$2,650
Nov 2002049624.664.14$2,052
Oct 2002251826.464.23$2,244
Sep 2002053827.443.64$1,956
Aug 2002061125.963.16$1,933
Jul 2002352824.583.06$1,690
Jun 2002463423.733.34$2,211
May 2002794224.663.58$3,549
Apr 2002897323.653.51$3,607
Mar 200251,09522.003.10$3,507
Feb 200251,03618.222.38$2,552
Jan 200251,11917.172.38$2,744
Dec 200151,10116.932.36$2,688
Nov 200151,07218.072.41$2,669
Oct 2001111,13719.782.53$3,093
Sep 200191,17624.262.25$2,866
Aug 200171,39824.873.05$4,442
Jul 200131,35623.933.20$4,407
Jun 200101,29924.563.82$4,968
May 200191,43025.524.31$6,389
Apr 2001121,50824.685.34$8,342
Mar 200161,71124.545.38$9,346
Feb 200131,25527.755.77$7,321
Jan 200101,43127.478.40$12,019
Dec 200001,81126.889.12$16,521
Nov 200022,37132.215.66$13,480
Oct 200061,99931.235.15$10,473
Sep 200042,07531.875.19$10,889
Aug 200032,54429.644.54$11,641
Jul 200052,93928.534.09$12,162
Jun 200022,17729.304.40$9,631

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   35 Mcf  × $  3.05 =       $107

────────────────────────────────────────────────────
Month total                                     $107

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/178733 is the state's own key, not one this site invented.