DAVID 109

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 179009District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$546 k
Jul 2000 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
311
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112000-10-19142592
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition254 bbl$11,065
GasProduction108,326 Mcf$535,195
Total$546,260

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3568, -100.5054. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.35680, -100.50539 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,650 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,650 ft.

Completions filed
Jul 2000
1 of 1 wells

1 well

42-43535148145,650 ftJul 2000

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (311)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

311 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240179.932.15$2
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240184.451.66$2
Mar 20240080.301.55$0
Feb 20240976.091.78$16
Jan 20240373.023.30$10
Dec 202301771.262.61$44
Nov 202302377.892.81$65
Oct 20230485.443.09$12
Sep 20230889.042.74$22
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 202301178.122.24$25
Mar 202304472.852.39$105
Feb 202304875.112.47$118
Jan 202305276.533.39$176
Dec 202205576.415.73$315
Nov 202205285.005.65$294
Oct 202201587.185.86$88
Sep 202204184.888.16$335
Aug 202205294.529.13$475
Jul 2022024101.587.54$181
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202201104.226.84$7
Mar 202201108.885.08$5
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210177.435.24$5
Oct 202103879.795.71$217
Sep 2021011369.865.35$605
Aug 2021011166.024.22$468
Jul 2021015370.783.98$609
Jun 2021020569.493.38$693
May 202108563.483.02$257
Apr 202101560.362.76$41
Mar 202103961.302.72$106
Feb 202101357.805.55$72
Jan 202103450.412.81$96
Dec 202004844.642.68$128
Nov 202001238.772.71$32
Oct 2020013836.972.48$342
Sep 202009137.091.99$181
Aug 202002139.982.39$50
Jul 202006638.371.83$120
Jun 202007134.901.69$120
May 202008316.921.81$151
Apr 202009914.751.80$179
Mar 2020012230.341.86$226
Feb 202009849.881.98$194
Jan 2020010657.252.09$222
Dec 2019012859.012.30$295
Nov 2019013455.302.75$369
Oct 2019017453.472.42$421
Sep 2019020155.052.66$534
Aug 2019021553.112.30$495
Jul 2019026856.272.46$659
Jun 2019035452.782.49$882
May 2019033558.482.74$918
Apr 2019035662.632.75$979
Mar 2019036456.803.06$1,115
Feb 2019024450.852.79$681
Jan 2019033446.033.23$1,078
Dec 2018023646.594.19$988
Nov 2018025252.934.24$1,068
Oct 2018030961.443.40$1,050
Sep 2018029059.543.11$901
Aug 2018030959.403.07$948
Jul 2018032365.142.93$947
Jun 2018026660.183.08$818
May 2018029265.382.90$847
Apr 2018023663.842.90$685
Mar 2018034161.222.79$950
Feb 2018031261.782.77$863
Jan 2018023462.874.01$938
Dec 2017033757.272.92$985
Nov 2017031955.423.12$995
Oct 2017031549.292.98$940
Sep 2017025847.523.09$797
Aug 2017030545.373.00$916
Jul 2017023143.873.09$713
Jun 2017019242.493.09$593
May 2017015745.373.26$512
Apr 2017018847.933.21$604
Mar 2017031646.772.98$943
Feb 2017019450.452.95$573
Jan 2017035149.413.42$1,200
Dec 2016037348.763.72$1,389
Nov 2016035342.492.64$933
Oct 2016034746.193.09$1,072
Sep 2016031841.553.10$986
Aug 2016032341.442.92$945
Jul 2016032741.622.92$956
Jun 2016033345.352.69$894
May 2016035642.521.99$709
Apr 2016034636.561.99$689
Mar 2016036733.011.79$658
Feb 2016033926.472.06$700
Jan 2016034527.352.36$816
Dec 2015026032.362.00$520
Nov 201507638.792.17$165
Oct 201501643.552.43$39
Sep 2015021542.992.76$593
Aug 201509340.162.87$267
Jul 201504748.152.95$138
Jun 201508656.152.88$248
May 201508655.212.96$254
Apr 201508949.822.71$241
Mar 201509142.892.93$267
Feb 201502044.662.98$60
Jan 20150043.433.10$0
Dec 201409754.693.59$348
Nov 2014111370.464.25$551
Oct 2014011078.303.90$429
Sep 2014010586.164.05$425
Aug 2014111089.394.04$533
Jul 2014012096.564.18$502
Jun 2014113198.164.74$719
May 2014014894.734.73$700
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 201415997.406.19$463
Jan 2014022390.404.86$1,084
Dec 2013220891.824.35$1,089
Nov 20130088.853.74$0
Oct 2013032997.423.78$1,243
Sep 20134484104.113.72$2,216
Aug 20130446104.253.52$1,571
Jul 20130271102.523.72$1,008
Jun 2013228594.403.93$1,310
May 2013044094.834.15$1,826
Apr 2013039793.964.28$1,700
Mar 2013423493.623.91$1,290
Feb 2013040091.233.42$1,368
Jan 2013447491.603.42$1,987
Dec 2012039286.773.42$1,341
Nov 2012332386.953.62$1,432
Oct 2012044989.383.40$1,526
Sep 2012042194.672.92$1,229
Aug 2012355192.662.91$1,880
Jul 2012055485.133.02$1,674
Jun 2012343079.822.52$1,323
May 2012031091.612.49$771
Apr 20120377101.652.00$753
Mar 20120531105.052.22$1,180
Feb 20121171101.102.57$541
Jan 201205098.092.73$137
Dec 20110096.873.24$0
Nov 201102595.723.31$83
Oct 201109984.983.65$361
Sep 201107683.623.99$303
Aug 2011111783.404.15$569
Jul 2011012894.144.52$578
Jun 2011113292.904.64$705
May 2011017798.134.40$780
Apr 20111147105.964.33$743
Mar 2011021896.364.06$885
Feb 2011225685.644.18$1,241
Jan 2011025886.504.59$1,184
Dec 2010124885.734.35$1,164
Nov 2010022480.843.80$850
Oct 2010120878.103.51$808
Sep 2010014872.633.98$589
Aug 2010014973.684.42$658
Jul 2010120372.554.74$1,034
Jun 2010020970.364.91$1,026
May 2010027971.124.24$1,182
Apr 2010127981.694.12$1,232
Mar 2010026978.394.39$1,181
Feb 2010122773.585.44$1,309
Jan 2010023574.365.96$1,402
Dec 2009027071.445.48$1,481
Nov 2009125074.593.75$1,012
Oct 2009020972.544.11$859
Sep 2009022265.543.06$680
Aug 2009019967.423.22$640
Jul 2009023961.133.46$828
Jun 2009121766.163.90$911
May 2009017454.743.93$683
Apr 2009124546.773.59$926
Mar 2009228242.144.06$1,229
Feb 2009029632.814.63$1,371
Jan 2009035135.865.37$1,885
Dec 2008124137.105.98$1,478
Nov 2008019955.496.86$1,365
Oct 2008121075.246.92$1,529
Sep 20081250101.767.88$2,071
Aug 20080234114.228.48$1,985
Jul 20081240131.0811.39$2,865
Jun 20081233131.3313.03$3,168
May 20082251123.1711.57$3,151
Apr 20080253110.3110.45$2,645
Mar 20080281101.909.66$2,716
Feb 2008226592.538.77$2,509
Jan 2008029390.388.21$2,404
Dec 2007029188.337.30$2,125
Nov 2007021091.677.29$1,531
Oct 2007218982.856.92$1,474
Sep 2007024175.846.24$1,505
Aug 2007017769.066.39$1,131
Jul 2007027170.906.39$1,731
Jun 2007342062.007.55$3,356
May 2007122958.747.85$1,856
Apr 2007021959.617.81$1,709
Mar 2007317156.927.30$1,419
Feb 2007019355.108.22$1,586
Jan 2007029050.306.73$1,951
Dec 2006029756.656.92$2,055
Nov 2006043654.207.62$3,321
Oct 2006343554.906.01$2,781
Sep 2006452460.085.04$2,880
Aug 2006051368.717.34$3,765
Jul 2006052369.376.34$3,317
Jun 2006050866.286.38$3,243
May 2006352366.016.42$3,558
Apr 2006048864.397.36$3,592
Mar 2006052456.707.08$3,711
Feb 2006050357.597.75$3,899
Jan 2006065360.598.93$5,833
Dec 2005044154.9413.42$5,916
Nov 2005343354.6910.59$4,749
Oct 2005052958.3413.80$7,298
Sep 2005054761.4512.08$6,607
Aug 2005461261.519.80$6,242
Jul 2005056255.697.84$4,408
Jun 2005059352.337.38$4,377
May 2005052945.226.65$3,518
Apr 2005353549.207.36$4,085
Mar 2005053850.377.15$3,849
Feb 2005045345.226.31$2,859
Jan 2005057543.166.32$3,635
Dec 2004048339.866.75$3,261
Nov 2004043445.286.33$2,747
Oct 2004238749.706.52$2,621
Sep 2004245643.245.28$2,496
Aug 2004251442.375.55$2,938
Jul 2004048438.286.08$2,945
Jun 2004248536.106.43$3,192
May 2004048137.486.49$3,124
Apr 2004246034.475.86$2,764
Mar 2004243734.365.53$2,485
Feb 2004054332.455.51$2,992
Jan 2004036532.036.30$2,299
Dec 2003239330.266.30$2,537
Nov 2003248828.804.60$2,300
Oct 2003253128.174.76$2,584
Sep 2003359326.314.75$2,895
Aug 2003565129.765.13$3,488
Jul 2003262429.415.17$3,285
Jun 2003456028.565.98$3,465
May 2003252826.595.97$3,207
Apr 2003561026.675.41$3,432
Mar 2003266131.146.10$4,092
Feb 2003059733.487.93$4,732
Jan 2003056530.315.58$3,154
Dec 2002077826.914.85$3,776
Nov 2002075624.664.14$3,128
Oct 2002280026.464.23$3,436
Sep 2002079627.443.64$2,894
Aug 2002077225.963.16$2,443
Jul 2002471424.583.06$2,284
Jun 2002590823.733.34$3,150
May 2002894524.663.58$3,584
Apr 200281,01423.653.51$3,751
Mar 200261,19122.003.10$3,827
Feb 2002477618.222.38$1,916
Jan 2002479017.172.38$1,945
Dec 2001490516.932.36$2,208
Nov 2001493018.072.41$2,309
Oct 2001992319.782.53$2,512
Sep 200171,00624.262.25$2,435
Aug 2001586924.873.05$2,778
Jul 200121,24623.933.20$4,031
Jun 200101,02224.563.82$3,908
May 200171,08025.524.31$4,831
Apr 2001101,18124.685.34$6,548
Mar 200161,57524.545.38$8,615
Feb 200141,73227.755.77$10,100
Jan 200102,06427.478.40$17,335
Dec 200001,92426.889.12$17,552
Nov 200053,07232.215.66$17,542
Oct 2000103,84431.235.15$20,092
Sep 200063,09731.875.19$16,254
Aug 200053,27429.644.54$15,015
Jul 200053,77928.534.09$15,598

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 79.93 =         $0
Gas                    1 Mcf  × $  2.15 =         $2

────────────────────────────────────────────────────
Month total                                       $2

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/179009 is the state's own key, not one this site invented.