CUSENBARY 71

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 181071District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$726 k
Jan 2001 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
305
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112001-05-10143397
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition80 bbl$3,595
GasProduction141,848 Mcf$722,156
Total$725,751

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3133, -100.5428. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.31330, -100.54276 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,400 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,400 ft.

Completions filed
Jan 2001
1 of 1 wells

1 well

42-43535291145,400 ftJan 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (305)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

305 months

May 2026014106.413.05$43
Apr 202601898.932.87$52
Mar 202602789.753.15$85
Feb 202602763.503.75$101
Jan 202602759.138.00$216
Dec 202504056.664.41$177
Nov 202504058.593.93$157
Oct 202502559.383.30$83
Sep 202501262.743.08$37
Aug 202504063.933.01$121
Jul 202503966.743.32$129
Jun 202503366.483.13$103
May 202503660.553.23$116
Apr 202503462.363.54$120
Mar 202503567.704.27$149
Feb 202503570.884.34$152
Jan 202503674.324.28$154
Dec 202404468.993.12$137
Nov 202403069.052.20$66
Oct 202403571.372.28$80
Sep 202403269.612.36$76
Aug 202402675.632.06$54
Jul 202403779.932.15$79
Jun 202403378.082.63$87
May 202403778.812.20$81
Apr 202402084.451.66$33
Mar 202401780.301.55$26
Feb 20240976.091.78$16
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230376.533.39$10
Dec 20220476.415.73$23
Nov 20220085.005.65$0
Oct 202202187.185.86$123
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20192062.632.75$125
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180262.874.01$8
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 201501338.792.17$28
Oct 201503643.552.43$87
Sep 201503542.992.76$97
Aug 201503840.162.87$109
Jul 201504048.152.95$118
Jun 201503956.152.88$112
May 201504555.212.96$133
Apr 201503949.822.71$106
Mar 201504042.892.93$117
Feb 201503944.662.98$116
Jan 201504443.433.10$136
Dec 201404554.693.59$162
Nov 201404470.464.25$187
Oct 201404578.303.90$176
Sep 201404386.164.05$174
Aug 201404589.394.04$182
Jul 201404096.564.18$167
Jun 201404398.164.74$204
May 201404694.734.73$217
Apr 201404495.944.81$212
Mar 201406595.895.06$329
Feb 201404197.406.19$254
Jan 201404590.404.86$219
Dec 201304791.824.35$205
Nov 201304588.853.74$168
Oct 201304797.423.78$178
Sep 2013045104.113.72$167
Aug 2013040104.253.52$141
Jul 2013020102.523.72$74
Jun 201302294.403.93$87
May 201302894.834.15$116
Apr 201304193.964.28$176
Mar 201304593.623.91$176
Feb 201303991.233.42$133
Jan 201304491.603.42$150
Dec 201204486.773.42$150
Nov 201204786.953.62$170
Oct 201204789.383.40$160
Sep 201207694.672.92$222
Aug 2012012992.662.91$375
Jul 2012015785.133.02$474
Jun 2012012379.822.52$310
May 2012020591.612.49$510
Apr 20120248101.652.00$495
Mar 2012088105.052.22$196
Feb 20120118101.102.57$303
Jan 2012012298.092.73$334
Dec 2011016596.873.24$535
Nov 2011021995.723.31$725
Oct 2011015884.983.65$576
Sep 2011021583.623.99$857
Aug 2011023783.404.15$983
Jul 2011023094.144.52$1,039
Jun 2011021492.904.64$993
May 2011023698.134.40$1,040
Apr 20110242105.964.33$1,049
Mar 2011026396.364.06$1,067
Feb 201109885.644.18$410
Jan 2011020086.504.59$918
Dec 2010010785.734.35$465
Nov 201009280.843.80$349
Oct 201001178.103.51$39
Sep 2010021072.633.98$836
Aug 2010035473.684.42$1,564
Jul 2010037972.554.74$1,795
Jun 2010031270.364.91$1,532
May 2010015571.124.24$656
Apr 2010019481.694.12$800
Mar 2010030578.394.39$1,339
Feb 2010022473.585.44$1,219
Jan 2010035374.365.96$2,105
Dec 2009745371.445.48$2,984
Nov 2009039074.593.75$1,463
Oct 2009031672.544.11$1,299
Sep 200901,83765.543.06$5,630
Aug 200913,80467.423.22$12,311
Jul 200901,81361.133.46$6,281
Jun 200901,63366.163.90$6,361
May 200901,61154.743.93$6,324
Apr 2009011746.773.59$420
Mar 2009057542.144.06$2,334
Feb 2009444632.814.63$2,198
Jan 2009057735.865.37$3,099
Dec 2008057237.105.98$3,419
Nov 2008057055.496.86$3,910
Oct 2008062275.246.92$4,305
Sep 20080747101.767.88$5,884
Aug 20080729114.228.48$6,184
Jul 200801,126131.0811.39$12,825
Jun 20080646131.3313.03$8,419
May 20080612123.1711.57$7,083
Apr 20083605110.3110.45$6,656
Mar 20080610101.909.66$5,895
Feb 2008052792.538.77$4,622
Jan 2008050790.388.21$4,160
Dec 2007068088.337.30$4,965
Nov 2007056691.677.29$4,127
Oct 2007062582.856.92$4,326
Sep 2007361875.846.24$4,086
Aug 2007069269.066.39$4,420
Jul 2007065270.906.39$4,165
Jun 2007266362.007.55$5,129
May 2007059458.747.85$4,661
Apr 2007040559.617.81$3,161
Mar 2007031956.927.30$2,329
Feb 2007018855.108.22$1,545
Jan 2007042950.306.73$2,886
Dec 2006041456.656.92$2,864
Nov 2006147554.207.62$3,673
Oct 2006024554.906.01$1,473
Sep 2006126260.085.04$1,380
Aug 2006021168.717.34$1,549
Jul 2006015869.376.34$1,002
Jun 2006022266.286.38$1,417
May 2006131866.016.42$2,109
Apr 2006029264.397.36$2,149
Mar 2006125356.707.08$1,849
Feb 2006018757.597.75$1,449
Jan 2006129260.598.93$2,669
Dec 2005029654.9413.42$3,971
Nov 2005017954.6910.59$1,895
Oct 2005135358.3413.80$4,928
Sep 2005031361.4512.08$3,781
Aug 2005030761.519.80$3,008
Jul 2005016955.697.84$1,326
Jun 2005011252.337.38$827
May 200524145.226.65$363
Apr 2005014749.207.36$1,082
Mar 2005018450.377.15$1,317
Feb 200551,49945.226.31$9,688
Jan 200501,66343.166.32$10,514
Dec 200401,75039.866.75$11,814
Nov 200401,74745.286.33$11,059
Oct 200441,83949.706.52$12,180
Sep 200401,79143.245.28$9,463
Aug 200401,34942.375.55$7,488
Jul 2004443238.286.08$2,781
Jun 2004063436.106.43$4,079
May 2004089337.486.49$5,800
Apr 2004095034.475.86$5,566
Mar 200401,06434.365.53$5,884
Feb 200401,55632.455.51$8,573
Jan 2004949232.036.30$3,388
Dec 200301,20230.266.30$7,575
Nov 200301,23728.804.60$5,684
Oct 200301,30528.174.76$6,211
Sep 200301,32926.314.75$6,312
Aug 2003131,51329.765.13$8,148
Jul 200301,42229.415.17$7,353
Jun 200301,73328.565.98$10,368
May 200302,01426.595.97$12,029
Apr 200302,06426.675.41$11,161
Mar 200306,06431.146.10$36,966
Feb 200301,72633.487.93$13,680
Jan 200301,87430.315.58$10,461
Dec 200202,24926.914.85$10,916
Nov 200202,07424.664.14$8,580
Oct 200202,02226.464.23$8,551
Sep 200201,80327.443.64$6,554
Aug 2002152,20025.963.16$7,351
Jul 200202,48024.583.06$7,593
Jun 200202,17123.733.34$7,247
May 200201,93824.663.58$6,946
Apr 200201,93923.653.51$6,810
Mar 200202,19322.003.10$6,804
Feb 200202,04918.222.38$4,868
Jan 200202,27717.172.38$5,409
Dec 200102,11816.932.36$5,008
Nov 200102,09718.072.41$5,044
Oct 200102,28019.782.53$5,766
Sep 200102,48124.262.25$5,586
Aug 200102,56024.873.05$7,816
Jul 200102,66923.933.20$8,533
Jun 200102,68424.563.82$10,264
May 200103,02925.524.31$13,047
Apr 200103,11224.685.34$16,604
Mar 200103,32424.545.38$17,871
Feb 200103,66027.755.77$21,108
Jan 200103,12927.478.40$26,280

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   14 Mcf  × $  3.05 =        $43

────────────────────────────────────────────────────
Month total                                      $43

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well