UNIVERSITY "30-35"

Operated by WTG EXPLORATION (P-5 945220) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 182759District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$379 k
Apr 2001 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
302
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-02-17155479
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition509 bbl$23,328
GasProduction73,740 Mcf$355,910
Total$379,239

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7427, -101.4772. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.74269, -101.47725 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,649 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,649 ft.

Completions filed
Apr 2001
1 of 1 wells

1 well

42-1053859346,649 ftApr 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (302)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

302 months

May 2026038106.413.05$116
Apr 202604198.932.87$118
Mar 202604089.753.15$126
Feb 202604563.503.75$169
Jan 202605159.138.00$408
Dec 202505156.664.41$225
Nov 202507958.593.93$310
Oct 202503859.383.30$126
Sep 202503962.743.08$120
Aug 202504263.933.01$127
Jul 202505066.743.32$166
Jun 202504866.483.13$150
May 202505360.553.23$171
Apr 202505362.363.54$188
Mar 202505367.704.27$226
Feb 202505270.884.34$226
Jan 202507074.324.28$300
Dec 202407568.993.12$234
Nov 202402569.052.20$55
Oct 202406571.372.28$148
Sep 202404669.612.36$109
Aug 202406275.632.06$128
Jul 202406879.932.15$146
Jun 202406178.082.63$161
May 202407178.812.20$156
Apr 2024010784.451.66$178
Mar 2024012580.301.55$193
Feb 20240076.091.78$0
Jan 202404473.023.30$145
Dec 202305371.262.61$138
Nov 202306377.892.81$177
Oct 202308185.443.09$250
Sep 2023012089.042.74$328
Aug 2023017380.522.67$462
Jul 2023030274.852.64$798
Jun 2023031968.962.26$720
May 2023038870.622.23$864
Apr 2023037578.122.24$839
Mar 2023048372.852.39$1,156
Feb 2023042375.112.47$1,043
Jan 2023035676.533.39$1,206
Dec 2022040576.415.73$2,320
Nov 2022034485.005.65$1,942
Oct 2022040087.185.86$2,346
Sep 2022015184.888.16$1,233
Aug 202207594.529.13$685
Jul 2022073101.587.54$551
Jun 2022086115.097.98$686
May 20220180109.378.43$1,518
Apr 20220280104.226.84$1,915
Mar 20220314108.885.08$1,594
Feb 2022028391.054.86$1,375
Jan 2022030781.844.54$1,393
Dec 2021030071.323.90$1,170
Nov 2021015277.435.24$796
Oct 202108579.795.71$486
Sep 202107369.865.35$391
Aug 202105566.024.22$232
Jul 202105470.783.98$215
Jun 202106269.493.38$210
May 202108063.483.02$241
Apr 202109160.362.76$251
Mar 2021013661.302.72$370
Feb 202106057.805.55$333
Jan 202106750.412.81$188
Dec 202006544.642.68$174
Nov 202006538.772.71$176
Oct 202006536.972.48$161
Sep 202006537.091.99$129
Aug 202007439.982.39$177
Jul 202008538.371.83$155
Jun 2020011534.901.69$194
May 202007916.921.81$143
Apr 202007314.751.80$132
Mar 202005630.341.86$104
Feb 202009649.881.98$190
Jan 202007957.252.09$165
Dec 2019010259.012.30$235
Nov 2019012955.302.75$355
Oct 2019015153.472.42$365
Sep 2019013955.052.66$369
Aug 201909453.112.30$217
Jul 2019010556.272.46$258
Jun 2019025952.782.49$645
May 2019011558.482.74$315
Apr 201908162.632.75$223
Mar 2019017156.803.06$524
Feb 2019016650.852.79$464
Jan 2019018546.033.23$597
Dec 2018022646.594.19$946
Nov 201801,07352.934.24$4,547
Oct 2018014361.443.40$486
Sep 2018023659.543.11$733
Aug 2018015259.403.07$466
Jul 2018015465.142.93$452
Jun 2018017860.183.08$548
May 2018015265.382.90$441
Apr 201806063.842.90$174
Mar 2018021861.222.79$608
Feb 20182816361.782.77$2,181
Jan 2018023262.874.01$930
Dec 2017016457.272.92$479
Nov 2017022255.423.12$692
Oct 2017020349.292.98$606
Sep 2017021747.523.09$670
Aug 2017028745.373.00$862
Jul 201702843.873.09$86
Jun 2017014042.493.09$432
May 201704645.373.26$150
Apr 201709947.933.21$318
Mar 2017012746.772.98$379
Feb 2017021150.452.95$623
Jan 2017013449.413.42$458
Dec 2016017648.763.72$655
Nov 2016017742.492.64$468
Oct 2016023646.193.09$729
Sep 2016023341.553.10$722
Aug 2016021541.442.92$629
Jul 2016021841.622.92$638
Jun 2016021445.352.69$575
May 2016022842.521.99$454
Apr 2016018936.561.99$376
Mar 2016016833.011.79$301
Feb 2016018426.472.06$380
Jan 2016017027.352.36$402
Dec 2015014632.362.00$292
Nov 2015023338.792.17$505
Oct 201502343.552.43$56
Sep 2015016142.992.76$444
Aug 2015014240.162.87$408
Jul 2015013948.152.95$409
Jun 2015019956.152.88$574
May 2015017255.212.96$508
Apr 2015016649.822.71$449
Mar 2015238342.892.93$1,230
Feb 201507144.662.98$211
Jan 2015019043.433.10$589
Dec 2014017454.693.59$625
Nov 2014056670.464.25$2,407
Oct 2014072378.303.90$2,820
Sep 2014067586.164.05$2,731
Aug 2014044989.394.04$1,812
Jul 2014021096.564.18$878
Jun 2014026198.164.74$1,236
May 2014039794.734.73$1,876
Apr 2014175395.944.81$1,886
Mar 2014010795.895.06$541
Feb 201404997.406.19$303
Jan 201407490.404.86$360
Dec 2013019891.824.35$862
Nov 2013020588.853.74$766
Oct 2013024597.423.78$926
Sep 20130121104.113.72$450
Aug 201300104.253.52$0
Jul 2013095102.523.72$353
Jun 2013018394.403.93$720
May 2013016494.834.15$680
Apr 2013018493.964.28$788
Mar 2013017393.623.91$677
Feb 201309391.233.42$318
Jan 201307691.603.42$260
Dec 2012015086.773.42$513
Nov 2012012286.953.62$442
Oct 2012015489.383.40$524
Sep 2012014494.672.92$420
Aug 2012015392.662.91$445
Jul 20120085.133.02$0
Jun 2012026979.822.52$678
May 2012015591.612.49$386
Apr 201205101.652.00$10
Mar 201205105.052.22$11
Feb 20120150101.102.57$386
Jan 2012020198.092.73$550
Dec 2011021896.873.24$706
Nov 2011021995.723.31$725
Oct 201101584.983.65$55
Sep 2011022383.623.99$889
Aug 2011026283.404.15$1,087
Jul 2011017594.144.52$791
Jun 2011025792.904.64$1,192
May 2011029298.134.40$1,286
Apr 20110312105.964.33$1,352
Mar 201106296.364.06$252
Feb 2011025885.644.18$1,078
Jan 201106986.504.59$317
Dec 2010028085.734.35$1,217
Nov 2010028980.843.80$1,097
Oct 2010030878.103.51$1,081
Sep 2010031272.633.98$1,242
Aug 2010034673.684.42$1,529
Jul 2010033572.554.74$1,587
Jun 2010034670.364.91$1,699
May 2010038371.124.24$1,622
Apr 2010015581.694.12$639
Mar 2010232978.394.39$1,930
Feb 2010046873.585.44$2,547
Jan 2010087474.365.96$5,213
Dec 2009085471.445.48$4,683
Nov 2009050874.593.75$1,906
Oct 2009087272.544.11$3,584
Sep 2009093365.543.06$2,859
Aug 2009093467.423.22$3,006
Jul 2009081061.133.46$2,806
Jun 2009061466.163.90$2,392
May 2009049254.743.93$1,931
Apr 2009040846.773.59$1,464
Mar 2009041142.144.06$1,668
Feb 2009027532.814.63$1,274
Jan 20092435435.865.37$2,762
Dec 2008036937.105.98$2,206
Nov 2008036455.496.86$2,497
Oct 2008015875.246.92$1,094
Sep 20080215101.767.88$1,694
Aug 20080312114.228.48$2,647
Jul 20080323131.0811.39$3,679
Jun 20080341131.3313.03$4,444
May 20080353123.1711.57$4,086
Apr 20080164110.3110.45$1,715
Mar 20080341101.909.66$3,295
Feb 2008042292.538.77$3,701
Jan 20082143490.388.21$5,459
Dec 2007046088.337.30$3,359
Nov 2007041291.677.29$3,004
Oct 2007043282.856.92$2,990
Sep 2007036775.846.24$2,292
Aug 2007037669.066.39$2,402
Jul 2007043070.906.39$2,747
Jun 20071837762.007.55$3,962
May 2007036558.747.85$2,864
Apr 2007038859.617.81$3,028
Mar 2007041256.927.30$3,008
Feb 2007039355.108.22$3,229
Jan 2007042750.306.73$2,872
Dec 2006041756.656.92$2,885
Nov 20061721754.207.62$2,574
Oct 2006041254.906.01$2,478
Sep 2006043060.085.04$2,166
Aug 2006045068.717.34$3,303
Jul 2006043769.376.34$2,772
Jun 2006042566.286.38$2,713
May 20061942366.016.42$3,972
Apr 2006043664.397.36$3,209
Mar 2006016156.707.08$1,140
Feb 2006028257.597.75$2,186
Jan 20062346260.598.93$5,521
Dec 2005042954.9413.42$5,755
Nov 2005042354.6910.59$4,479
Oct 2005045358.3413.80$6,249
Sep 2005029761.4512.08$3,587
Aug 2005011861.519.80$1,156
Jul 20052239955.697.84$4,355
Jun 2005020452.337.38$1,506
May 2005019945.226.65$1,324
Apr 20052120649.207.36$2,549
Mar 2005019750.377.15$1,410
Feb 2005018645.226.31$1,174
Jan 2005023743.166.32$1,498
Dec 20042420039.866.75$2,307
Nov 2004032545.286.33$2,057
Oct 2004023749.706.52$1,544
Sep 20042217443.245.28$1,871
Aug 2004023742.375.55$1,316
Jul 2004024538.286.08$1,491
Jun 2004022336.106.43$1,435
May 2004026137.486.49$1,695
Apr 20042224634.475.86$2,200
Mar 2004027534.365.53$1,521
Feb 2004022632.455.51$1,245
Jan 2004024732.036.30$1,556
Dec 200312030.266.30$363
Nov 2003020328.804.60$933
Oct 20031928628.174.76$1,896
Sep 2003026226.314.75$1,244
Aug 2003030629.765.13$1,570
Jul 2003030929.415.17$1,598
Jun 2003022228.565.98$1,328
May 20032027726.595.97$2,186
Apr 2003024126.675.41$1,303
Mar 2003023131.146.10$1,408
Feb 20031618433.487.93$1,994
Jan 20031724930.315.58$1,905
Dec 2002027426.914.85$1,330
Nov 20021524124.664.14$1,367
Oct 2002030926.464.23$1,307
Sep 2002028527.443.64$1,036
Aug 20021633725.963.16$1,482
Jul 2002031424.583.06$961
Jun 2002033223.733.34$1,108
May 2002037524.663.58$1,344
Apr 20021333823.653.51$1,495
Mar 20021334822.003.10$1,366
Feb 20021230318.222.38$938
Jan 20021039017.172.38$1,098
Dec 2001038116.932.36$901
Nov 2001040118.072.41$965
Oct 2001038219.782.53$966
Sep 2001091324.262.25$2,055
Aug 2001053924.873.05$1,646
Jul 2001036723.933.20$1,173
Jun 200121,36724.563.82$5,277
May 2001201,85625.524.31$8,505
Apr 200109924.685.34$528

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   38 Mcf  × $  3.05 =       $116

────────────────────────────────────────────────────
Month total                                     $116

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/182759 is the state's own key, not one this site invented.