CREEK RANCH 57

Operated by CONOCOPHILLIPS COMPANY (P-5 172232) in the K M, SW. (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 182777District 7CField 47891475CondensateGasSaveExport
Value, all time
$174 k
Mar 2001 – Nov 2007
Value, last 12 filed months
$24 k
at the published price for each month
Months reported
81
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 9 wells, and the rule below applies to all of them.

Discovered
1994-07-12
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1998-10-13.

The Commission's schedule remark for this field reads: OPTIONAL 40 ACRE UNITS W/2100' DIAG.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition49 bbl$1,160
GasProduction28,955 Mcf$172,898
Total$174,058

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4693, -102.1543. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46926, -102.15434 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,100 ft
1 wells filed one
Completion to plug
12.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,100 ft.

Completions filed
Feb 1995
1 of 1 wells
Plug dates filed
Nov 2007
1 of 1 wells

Last completion to plug: a median of 12.8 years across the 1 well that filed both dates, with the middle half between 12.8 years and 12.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4433053516,100 ftFeb 1995Nov 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (81)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

81 months

Nov 20070691.677.29$44
Oct 2007024082.856.92$1,661
Sep 2007018175.846.24$1,130
Aug 2007022269.066.39$1,418
Jul 2007021170.906.39$1,348
Jun 2007022462.007.55$1,691
May 2007021858.747.85$1,710
Apr 2007021659.617.81$1,686
Mar 2007023956.927.30$1,745
Feb 2007021855.108.22$1,791
Jan 2007055350.306.73$3,720
Dec 2006089456.656.92$6,185
Nov 2006074254.207.62$5,652
Oct 2006061354.906.01$3,686
Sep 2006043460.085.04$2,186
Aug 2006031468.717.34$2,305
Jul 2006016969.376.34$1,072
Jun 200601066.286.38$64
May 200607066.016.42$450
Apr 2006015064.397.36$1,104
Mar 2006034756.707.08$2,458
Feb 2006032057.597.75$2,480
Jan 2006034260.598.93$3,055
Dec 2005033854.9413.42$4,534
Nov 200507254.6910.59$762
Oct 2005034058.3413.80$4,691
Sep 2005054361.4512.08$6,559
Aug 200509161.519.80$892
Jul 200507755.697.84$604
Jun 200502952.337.38$214
May 2005018245.226.65$1,211
Apr 2005031249.207.36$2,296
Mar 2005032050.377.15$2,290
Feb 2005045245.226.31$2,853
Jan 2005017143.166.32$1,081
Dec 2004061739.866.75$4,165
Nov 2004034745.286.33$2,197
Oct 2004048949.706.52$3,186
Sep 2004044243.245.28$2,335
Aug 2004038342.375.55$2,126
Jul 2004038338.286.08$2,330
Jun 2004025336.106.43$1,628
May 2004032937.486.49$2,137
Apr 2004061434.475.86$3,597
Mar 2004055034.365.53$3,042
Feb 2004053432.455.51$2,942
Jan 2004037532.036.30$2,362
Dec 2003040130.266.30$2,527
Nov 2003019628.804.60$901
Oct 2003044628.174.76$2,123
Sep 2003089826.314.75$4,265
Aug 200308529.765.13$436
Jul 200309829.415.17$507
Jun 2003022628.565.98$1,352
May 2003014226.595.97$848
Apr 2003038326.675.41$2,071
Mar 2003061231.146.10$3,731
Feb 200301,27233.487.93$10,082
Jan 2003089030.315.58$4,968
Dec 2002023726.914.85$1,150
Nov 200207524.664.14$310
Oct 200207026.464.23$296
Sep 2002010527.443.64$382
Aug 2002030125.963.16$952
Jul 200206224.583.06$190
Jun 2002027323.733.34$911
May 200205624.663.58$201
Apr 2002013423.653.51$471
Mar 2002136722.003.10$1,161
Feb 200218518.222.38$220
Jan 2002092517.172.38$2,198
Dec 2001052616.932.36$1,244
Nov 2001317418.072.41$473
Oct 2001311819.782.53$358
Sep 200146724.262.25$248
Aug 2001020024.873.05$611
Jul 2001221,31023.933.20$4,715
Jun 20010024.563.82$0
May 2001151,15425.524.31$5,353
Apr 2001089924.685.34$4,796
Mar 2001099224.545.38$5,333

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2007 — as filed, then multipliedworked
Condensate             0 bbl  × $ 91.67 =         $0
Gas                    6 Mcf  × $  7.29 =        $44

────────────────────────────────────────────────────
Month total                                      $44

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/182777 is the state's own key, not one this site invented.