CANYON RANCH

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 184083District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$661 k
May 2001 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
301
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112001-10-19145090
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2 bbl$75
GasProduction127,808 Mcf$661,245
Total$661,320

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3246, -100.4736. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.32461, -100.47356 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,345 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,345 ft.

Completions filed
May 2001
1 of 1 wells

1 well

42-435354441156S5,345 ftMay 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (301)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

301 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100381.694.12$12
Mar 201001178.394.39$48
Feb 201001273.585.44$65
Jan 201001674.365.96$95
Dec 200902171.445.48$115
Nov 200901674.593.75$60
Oct 20090872.544.11$33
Sep 20090965.543.06$28
Aug 200901667.423.22$52
Jul 200901861.133.46$62
Jun 200902566.163.90$97
May 200904654.743.93$181
Apr 200905046.773.59$179
Mar 200906442.144.06$260
Feb 200906532.814.63$301
Jan 200908235.865.37$440
Dec 2008010437.105.98$622
Nov 2008012755.496.86$871
Oct 2008011075.246.92$761
Sep 20080260101.767.88$2,048
Aug 20080463114.228.48$3,928
Jul 20080550131.0811.39$6,264
Jun 20080611131.3313.03$7,963
May 20080672123.1711.57$7,778
Apr 20080676110.3110.45$7,067
Mar 20080555101.909.66$5,364
Feb 2008053192.538.77$4,657
Jan 2008074290.388.21$6,089
Dec 2007059488.337.30$4,337
Nov 2007071391.677.29$5,199
Oct 2007076882.856.92$5,316
Sep 2007063175.846.24$3,940
Aug 2007050269.066.39$3,207
Jul 2007068770.906.39$4,389
Jun 2007075062.007.55$5,661
May 2007075358.747.85$5,908
Apr 2007084859.617.81$6,619
Mar 2007091856.927.30$6,703
Feb 2007074955.108.22$6,154
Jan 2007093250.306.73$6,269
Dec 2006092956.656.92$6,427
Nov 2006080154.207.62$6,102
Oct 2006095854.906.01$5,761
Sep 2006066860.085.04$3,365
Aug 2006036068.717.34$2,642
Jul 2006049869.376.34$3,159
Jun 2006067766.286.38$4,322
May 200601,01466.016.42$6,515
Apr 2006094864.397.36$6,978
Mar 2006091956.707.08$6,509
Feb 2006084557.597.75$6,550
Jan 200601,01860.598.93$9,094
Dec 200501,07754.9413.42$14,448
Nov 2005097054.6910.59$10,271
Oct 200501,07058.3413.80$14,761
Sep 200501,00661.4512.08$12,151
Aug 2005082661.519.80$8,092
Jul 2005092555.697.84$7,255
Jun 2005094952.337.38$7,005
May 2005093545.226.65$6,219
Apr 200501,09249.207.36$8,038
Mar 200501,03050.377.15$7,370
Feb 200501,03945.226.31$6,558
Jan 200511,12443.166.32$7,149
Dec 2004094039.866.75$6,346
Nov 2004082345.286.33$5,210
Oct 200401,00349.706.52$6,535
Sep 2004085343.245.28$4,507
Aug 2004078642.375.55$4,363
Jul 2004067738.286.08$4,119
Jun 2004051336.106.43$3,300
May 2004074337.486.49$4,825
Apr 2004073034.475.86$4,277
Mar 2004080234.365.53$4,435
Feb 2004074032.455.51$4,077
Jan 2004189332.036.30$5,658
Dec 200301,01930.266.30$6,421
Nov 200301,12728.804.60$5,179
Oct 200301,11928.174.76$5,326
Sep 200301,25726.314.75$5,970
Aug 200301,66529.765.13$8,541
Jul 200301,57229.415.17$8,129
Jun 200301,53328.565.98$9,172
May 200301,71526.595.97$10,243
Apr 200301,94026.675.41$10,490
Mar 200301,84931.146.10$11,272
Feb 200302,08833.487.93$16,549
Jan 200301,58230.315.58$8,831
Dec 200202,19526.914.85$10,654
Nov 200201,66524.664.14$6,888
Oct 200202,14826.464.23$9,084
Sep 200202,34927.443.64$8,539
Aug 200202,39025.963.16$7,562
Jul 200202,51524.583.06$7,700
Jun 200202,50923.733.34$8,376
May 200202,62224.663.58$9,397
Apr 200202,64523.653.51$9,290
Mar 200202,90422.003.10$9,010
Feb 200202,46318.222.38$5,851
Jan 200203,03917.172.38$7,220
Dec 200103,37016.932.36$7,968
Nov 200103,46918.072.41$8,345
Oct 200104,19219.782.53$10,601
Sep 200104,35724.262.25$9,809
Aug 200105,08724.873.05$15,531
Jul 200104,87723.933.20$15,592
Jun 200106,30524.563.82$24,111
May 200102,35225.524.31$10,131

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2010 — as filed, then multipliedworked
Condensate             0 bbl  × $ 81.69 =         $0
Gas                    3 Mcf  × $  4.12 =        $12

────────────────────────────────────────────────────
Month total                                      $12

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/184083 is the state's own key, not one this site invented.