MECKEL "A"

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 184563District 7CField 846465002 tax incentive programmesCondensateGasSaveExport
Value, all time
$414 k
Aug 2001 – May 2026
Value, last 12 filed months
$366
at the published price for each month
Months reported
298
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112001-10-12145070
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5 bbl$372
GasProduction76,201 Mcf$413,220
Total$413,591

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6792, -100.6988. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.67919, -100.69885 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,300 ft.

Completions filed
Aug 2001
1 of 1 wells

1 well

42-43535466187,300 ftAug 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (298)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

298 months

May 202608106.413.05$24
Apr 20260898.932.87$23
Mar 20260889.753.15$25
Feb 20260763.503.75$26
Jan 20260859.138.00$64
Dec 20250856.664.41$35
Nov 20250858.593.93$31
Oct 202501059.383.30$33
Sep 20250662.743.08$18
Aug 20250963.933.01$27
Jul 20250966.743.32$30
Jun 20250966.483.13$28
May 20250960.553.23$29
Apr 20250962.363.54$32
Mar 20250967.704.27$38
Feb 20250870.884.34$35
Jan 20250974.324.28$39
Dec 202401168.993.12$34
Nov 20240869.052.20$18
Oct 20240971.372.28$21
Sep 202401069.612.36$24
Aug 202401075.632.06$21
Jul 202401079.932.15$21
Jun 202401278.082.63$32
May 20240978.812.20$20
Apr 202401084.451.66$17
Mar 202401180.301.55$17
Feb 202401076.091.78$18
Jan 20240973.023.30$30
Dec 20230971.262.61$24
Nov 20230977.892.81$25
Oct 202301085.443.09$31
Sep 20230989.042.74$25
Aug 202301080.522.67$27
Jul 202301074.852.64$26
Jun 202301068.962.26$23
May 202301170.622.23$25
Apr 202301178.122.24$25
Mar 202301172.852.39$26
Feb 202301075.112.47$25
Jan 202301176.533.39$37
Dec 202201176.415.73$63
Nov 202201285.005.65$68
Oct 202201287.185.86$70
Sep 202201184.888.16$90
Aug 202201194.529.13$100
Jul 2022012101.587.54$91
Jun 2022012115.097.98$96
May 2022013109.378.43$110
Apr 2022013104.226.84$89
Mar 2022012108.885.08$61
Feb 202201091.054.86$49
Jan 202201381.844.54$59
Dec 202101371.323.90$51
Nov 202101277.435.24$63
Oct 202101379.795.71$74
Sep 202101369.865.35$70
Aug 202101466.024.22$59
Jul 202101670.783.98$64
Jun 202101569.493.38$51
May 202101663.483.02$48
Apr 202101660.362.76$44
Mar 202101761.302.72$46
Feb 202101657.805.55$89
Jan 202101250.412.81$34
Dec 202001844.642.68$48
Nov 2020016138.772.71$436
Oct 2020021136.972.48$523
Sep 2020020937.091.99$416
Aug 2020021239.982.39$506
Jul 2020021738.371.83$396
Jun 2020021234.901.69$358
May 2020021816.921.81$396
Apr 2020021014.751.80$379
Mar 2020022030.341.86$408
Feb 2020020649.881.98$408
Jan 2020022557.252.09$471
Dec 2019023359.012.30$537
Nov 2019010655.302.75$292
Oct 201902453.472.42$58
Sep 201902555.052.66$66
Aug 201902653.112.30$60
Jul 201902756.272.46$66
Jun 201902752.782.49$67
May 201902958.482.74$79
Apr 201902762.632.75$74
Mar 201902856.803.06$86
Feb 201902750.852.79$75
Jan 201903146.033.23$100
Dec 201803246.594.19$134
Nov 201802352.934.24$97
Oct 201803461.443.40$116
Sep 201803559.543.11$109
Aug 201803659.403.07$110
Jul 201803665.142.93$106
Jun 201803760.183.08$114
May 201803765.382.90$107
Apr 201803663.842.90$104
Mar 201804061.222.79$111
Feb 201803561.782.77$97
Jan 201803962.874.01$156
Dec 201704257.272.92$123
Nov 201704155.423.12$128
Oct 201704349.292.98$128
Sep 201704447.523.09$136
Aug 201704645.373.00$138
Jul 201704743.873.09$145
Jun 201704842.493.09$148
May 201704945.373.26$160
Apr 201704847.933.21$154
Mar 201705246.772.98$155
Feb 201704750.452.95$139
Jan 201705249.413.42$178
Dec 201605348.763.72$197
Nov 201605442.492.64$143
Oct 201605646.193.09$173
Sep 201605541.553.10$171
Aug 201605941.442.92$173
Jul 201605941.622.92$173
Jun 201605845.352.69$156
May 201606042.521.99$119
Apr 201605636.561.99$112
Mar 201605933.011.79$106
Feb 201605526.472.06$114
Jan 201606127.352.36$144
Dec 201506132.362.00$122
Nov 201506238.792.17$134
Oct 201506643.552.43$160
Sep 201506542.992.76$179
Aug 201506440.162.87$184
Jul 201504748.152.95$138
Jun 201504256.152.88$121
May 201504355.212.96$127
Apr 201506949.822.71$187
Mar 201505542.892.93$161
Feb 201502844.662.98$83
Jan 201506943.433.10$214
Dec 201401854.693.59$65
Nov 201406070.464.25$255
Oct 201407278.303.90$281
Sep 2014048586.164.05$1,962
Aug 201405489.394.04$218
Jul 201403796.564.18$155
Jun 201403298.164.74$152
May 201404694.734.73$217
Apr 201405195.944.81$245
Mar 201404895.895.06$243
Feb 201407497.406.19$458
Jan 201408890.404.86$428
Dec 2013011091.824.35$479
Nov 201307788.853.74$288
Oct 2013010497.423.78$393
Sep 2013085104.113.72$316
Aug 2013092104.253.52$324
Jul 2013095102.523.72$353
Jun 201309394.403.93$366
May 201309894.834.15$407
Apr 201309993.964.28$424
Mar 2013010193.623.91$395
Feb 201308991.233.42$304
Jan 2013010591.603.42$359
Dec 2012011086.773.42$376
Nov 201205286.953.62$189
Oct 201208089.383.40$272
Sep 201206894.672.92$198
Aug 201205692.662.91$163
Jul 2012010085.133.02$302
Jun 2012011079.822.52$277
May 2012010891.612.49$269
Apr 2012070101.652.00$140
Mar 2012097105.052.22$216
Feb 20120103101.102.57$265
Jan 2012011298.092.73$306
Dec 2011016196.873.24$522
Nov 2011014195.723.31$467
Oct 2011015384.983.65$558
Sep 2011014783.623.99$586
Aug 2011013383.404.15$552
Jul 2011014494.144.52$650
Jun 2011014592.904.64$673
May 2011016598.134.40$727
Apr 20110156105.964.33$676
Mar 2011016896.364.06$682
Feb 2011015185.644.18$631
Jan 2011015986.504.59$730
Dec 2010018585.734.35$804
Nov 2010017880.843.80$676
Oct 2010018778.103.51$656
Sep 2010016872.633.98$669
Aug 2010017173.684.42$756
Jul 2010017272.554.74$815
Jun 2010010770.364.91$525
May 201009671.124.24$407
Apr 201007881.694.12$322
Mar 201006278.394.39$272
Feb 201009473.585.44$512
Jan 2010511074.365.96$1,028
Dec 2009010571.445.48$576
Nov 2009011974.593.75$446
Oct 2009011972.544.11$489
Sep 2009013265.543.06$405
Aug 2009013767.423.22$441
Jul 2009014861.133.46$513
Jun 2009013466.163.90$522
May 2009015654.743.93$612
Apr 2009014646.773.59$524
Mar 2009016142.144.06$654
Feb 2009015132.814.63$700
Jan 2009017135.865.37$918
Dec 2008016437.105.98$980
Nov 2008019055.496.86$1,303
Oct 2008019675.246.92$1,357
Sep 20080193101.767.88$1,520
Aug 20080192114.228.48$1,629
Jul 20080222131.0811.39$2,528
Jun 20080262131.3313.03$3,415
May 20080256123.1711.57$2,963
Apr 20080262110.3110.45$2,739
Mar 20080246101.909.66$2,377
Feb 2008026392.538.77$2,307
Jan 2008017490.388.21$1,428
Dec 2007023088.337.30$1,679
Nov 2007026691.677.29$1,940
Oct 2007021582.856.92$1,488
Sep 2007066975.846.24$4,177
Aug 2007036969.066.39$2,357
Jul 2007039370.906.39$2,510
Jun 2007025662.007.55$1,932
May 2007028358.747.85$2,221
Apr 2007031059.617.81$2,420
Mar 2007034156.927.30$2,490
Feb 2007039355.108.22$3,229
Jan 2007027750.306.73$1,863
Dec 2006020856.656.92$1,439
Nov 2006025654.207.62$1,950
Oct 2006028054.906.01$1,684
Sep 2006030060.085.04$1,511
Aug 2006033668.717.34$2,466
Jul 2006033969.376.34$2,150
Jun 2006037366.286.38$2,381
May 2006040666.016.42$2,609
Apr 2006041264.397.36$3,033
Mar 2006042956.707.08$3,039
Feb 2006041357.597.75$3,201
Jan 2006046960.598.93$4,190
Dec 2005052554.9413.42$7,043
Nov 200501,01554.6910.59$10,747
Oct 200501,02458.3413.80$14,127
Sep 200501,09161.4512.08$13,178
Aug 2005081561.519.80$7,984
Jul 2005078055.697.84$6,118
Jun 2005085252.337.38$6,289
May 2005079745.226.65$5,301
Apr 2005071949.207.36$5,292
Mar 2005068750.377.15$4,915
Feb 2005062845.226.31$3,964
Jan 2005081343.166.32$5,140
Dec 2004073739.866.75$4,976
Nov 200401,13445.286.33$7,179
Oct 2004096849.706.52$6,307
Sep 200401,08543.245.28$5,733
Aug 2004057642.375.55$3,197
Jul 200401,03838.286.08$6,315
Jun 2004076236.106.43$4,902
May 2004085537.486.49$5,553
Apr 2004087234.475.86$5,109
Mar 2004071234.365.53$3,937
Feb 2004075632.455.51$4,165
Jan 200401,12032.036.30$7,056
Dec 2003091230.266.30$5,747
Nov 2003082328.804.60$3,782
Oct 2003084528.174.76$4,022
Sep 200301,47226.314.75$6,991
Aug 2003095329.765.13$4,889
Jul 200301,23929.415.17$6,407
Jun 2003095328.565.98$5,702
May 2003085126.595.97$5,083
Apr 2003093126.675.41$5,034
Mar 2003060131.146.10$3,664
Feb 2003061233.487.93$4,851
Jan 200301,25930.315.58$7,028
Dec 200201,31526.914.85$6,383
Nov 200201,42824.664.14$5,908
Oct 200201,27326.464.23$5,384
Sep 200201,34827.443.64$4,900
Aug 200201,54225.963.16$4,879
Jul 200201,30024.583.06$3,980
Jun 200201,08723.733.34$3,629
May 200201,00424.663.58$3,598
Apr 200202,20923.653.51$7,759
Mar 200201,34222.003.10$4,164
Feb 2002064218.222.38$1,525
Jan 2002066917.172.38$1,589
Dec 2001081216.932.36$1,920
Nov 2001060418.072.41$1,453
Oct 2001084419.782.53$2,134
Sep 2001096724.262.25$2,177
Aug 2001081024.873.05$2,473

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    8 Mcf  × $  3.05 =        $24

────────────────────────────────────────────────────
Month total                                      $24

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/184563 is the state's own key, not one this site invented.