SHANNON 52

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 185285District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
May 2001 – May 2026
Value, last 12 filed months
$646
at the published price for each month
Months reported
301
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112001-11-30144786
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition505 bbl$21,583
GasProduction215,812 Mcf$1,180,242
Total$1,201,825

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6686, -100.7972. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66865, -100.79718 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,050 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,050 ft.

Completions filed
May 2001
1 of 1 wells

1 well

42-4353543888,050 ftMay 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (301)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

301 months

May 2026042106.413.05$128
Apr 202602898.932.87$80
Mar 202604189.753.15$129
Feb 202603363.503.75$124
Jan 202601959.138.00$152
Dec 20250056.664.41$0
Nov 20250558.593.93$20
Oct 20250459.383.30$13
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240668.993.12$19
Nov 20240969.052.20$20
Oct 20240971.372.28$21
Sep 20240269.612.36$5
Aug 20240175.632.06$2
Jul 20240879.932.15$17
Jun 20240678.082.63$16
May 20240978.812.20$20
Apr 202401084.451.66$17
Mar 202401180.301.55$17
Feb 202401076.091.78$18
Jan 202401273.023.30$40
Dec 202301271.262.61$31
Nov 202301277.892.81$34
Oct 202301385.443.09$40
Sep 202301289.042.74$33
Aug 202301280.522.67$32
Jul 202301374.852.64$34
Jun 202301368.962.26$29
May 202301570.622.23$33
Apr 202301478.122.24$31
Mar 202301072.852.39$24
Feb 202301375.112.47$32
Jan 202301476.533.39$47
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220381.844.54$14
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20212063.483.02$127
Apr 20210060.362.76$0
Mar 202111461.302.72$99
Feb 202101857.805.55$100
Jan 202102150.412.81$59
Dec 202012044.642.68$98
Nov 202012138.772.71$96
Oct 202002036.972.48$50
Sep 202002037.091.99$40
Aug 202012039.982.39$88
Jul 202002038.371.83$37
Jun 202021934.901.69$102
May 202001916.921.81$34
Apr 202001814.751.80$32
Mar 202041830.341.86$155
Feb 202001849.881.98$36
Jan 202062057.252.09$385
Dec 201902059.012.30$46
Nov 201971855.302.75$437
Oct 201901853.472.42$44
Sep 201931855.052.66$213
Aug 201901753.112.30$39
Jul 201901856.272.46$44
Jun 201901852.782.49$45
May 201901658.482.74$44
Apr 201911662.632.75$107
Mar 201901656.803.06$49
Feb 201901650.852.79$45
Jan 20192146.033.23$95
Dec 20180146.594.19$4
Nov 20183252.934.24$167
Oct 20180161.443.40$3
Sep 20181259.543.11$66
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20181063.842.90$64
Mar 201821161.222.79$153
Feb 201801561.782.77$41
Jan 201802262.874.01$88
Dec 201702257.272.92$64
Nov 201702455.423.12$75
Oct 201722749.292.98$179
Sep 201702647.523.09$80
Aug 201712945.373.00$133
Jul 201702743.873.09$83
Jun 201702742.493.09$83
May 201712845.373.26$137
Apr 201702947.933.21$93
Mar 201702846.772.98$84
Feb 201712650.452.95$127
Jan 201702849.413.42$96
Dec 201643148.763.72$310
Nov 201604042.492.64$106
Oct 201643046.193.09$277
Sep 201602941.553.10$90
Aug 201603041.442.92$88
Jul 201622941.622.92$168
Jun 201642745.352.69$254
May 201603042.521.99$60
Apr 201622936.561.99$131
Mar 201642733.011.79$180
Feb 201612126.472.06$70
Jan 201602827.352.36$66
Dec 201553032.362.00$222
Nov 201502938.792.17$63
Oct 201503143.552.43$75
Sep 201503642.992.76$99
Aug 201505240.162.87$149
Jul 201503048.152.95$88
Jun 201503256.152.88$92
May 20150655.212.96$18
Apr 201502449.822.71$65
Mar 201504242.892.93$123
Feb 201504344.662.98$128
Jan 201504343.433.10$133
Dec 201403954.693.59$140
Nov 201404670.464.25$196
Oct 201404578.303.90$176
Sep 201404486.164.05$178
Aug 201404289.394.04$169
Jul 201404796.564.18$196
Jun 201404698.164.74$218
May 201404694.734.73$217
Apr 201406295.944.81$298
Mar 201405195.895.06$258
Feb 201403997.406.19$241
Jan 201403790.404.86$180
Dec 201304891.824.35$209
Nov 201304388.853.74$161
Oct 201305797.423.78$215
Sep 2013045104.113.72$167
Aug 2013095104.253.52$335
Jul 2013084102.523.72$312
Jun 201308194.403.93$319
May 201309294.834.15$382
Apr 2013011293.964.28$480
Mar 2013012793.623.91$497
Feb 2013012291.233.42$417
Jan 2013013991.603.42$475
Dec 2012016186.773.42$551
Nov 2012016386.953.62$591
Oct 2012018889.383.40$639
Sep 2012015394.672.92$447
Aug 201205092.662.91$145
Jul 2012019385.133.02$583
Jun 2012019179.822.52$481
May 2012021891.612.49$542
Apr 20120210101.652.00$419
Mar 20120236105.052.22$524
Feb 20120235101.102.57$604
Jan 2012026098.092.73$711
Dec 2011026396.873.24$852
Nov 2011124695.723.31$910
Oct 2011026184.983.65$952
Sep 2011017183.623.99$682
Aug 2011020383.404.15$842
Jul 2011023294.144.52$1,048
Jun 2011024892.904.64$1,151
May 2011026598.134.40$1,167
Apr 20110277105.964.33$1,200
Mar 2011025196.364.06$1,018
Feb 2011029385.644.18$1,225
Jan 2011137886.504.59$1,821
Dec 2010137185.734.35$1,699
Nov 2010036080.843.80$1,366
Oct 2010151978.103.51$1,899
Sep 2010151672.633.98$2,126
Aug 2010056673.684.42$2,501
Jul 2010150772.554.74$2,474
Jun 2010272170.364.91$3,681
May 2010294071.124.24$4,123
Apr 2010287781.694.12$3,779
Mar 2010287378.394.39$3,988
Feb 2010285173.585.44$4,779
Jan 201011,01574.365.96$6,128
Dec 2009395671.445.48$5,457
Nov 200931,00574.593.75$3,994
Oct 200911,11872.544.11$4,668
Sep 200911,12165.543.06$3,501
Aug 200911,17667.423.22$3,852
Jul 200911,23061.133.46$4,322
Jun 2009181766.163.90$3,248
May 2009178954.743.93$3,152
Apr 200921,05446.773.59$3,875
Mar 200921,30242.144.06$5,369
Feb 2009128432.814.63$1,349
Jan 200911,13835.865.37$6,148
Dec 200831,17237.105.98$7,117
Nov 200821,18055.496.86$8,206
Oct 200811,10575.246.92$7,724
Sep 20081352101.767.88$2,875
Aug 200821,203114.228.48$10,434
Jul 200811,200131.0811.39$13,798
Jun 200821,154131.3313.03$15,302
May 200811,283123.1711.57$14,973
Apr 200831,318110.3110.45$14,110
Mar 200821,328101.909.66$13,038
Feb 200831,13392.538.77$10,215
Jan 200831,18890.388.21$10,020
Dec 200731,28188.337.30$9,619
Nov 200761,33891.677.29$10,306
Oct 200761,37882.856.92$10,036
Sep 200731,85375.846.24$11,798
Aug 200732,00269.066.39$12,996
Jul 200732,07770.906.39$13,480
Jun 200731,67462.007.55$12,822
May 200751,61058.747.85$12,926
Apr 200751,36459.617.81$10,944
Mar 200751,43756.927.30$10,778
Feb 200751,30855.108.22$11,022
Jan 200751,47450.306.73$10,167
Dec 200671,42656.656.92$10,262
Nov 200641,45854.207.62$11,323
Oct 200621,44054.906.01$8,770
Sep 200651,52160.085.04$7,962
Aug 200601,68168.717.34$12,338
Jul 200621,11969.376.34$7,236
Jun 200611,16366.286.38$7,491
May 200601,38166.016.42$8,873
Apr 200621,13464.397.36$8,476
Mar 200651,15756.707.08$8,478
Feb 200621,18357.597.75$9,285
Jan 200621,21060.598.93$10,931
Dec 200551,33154.9413.42$18,131
Nov 200521,33354.6910.59$14,224
Oct 200512,04358.3413.80$28,243
Sep 200501,79961.4512.08$21,730
Aug 200531,66961.519.80$16,535
Jul 200502,14755.697.84$16,840
Jun 200521,68552.337.38$12,542
May 200521,62845.226.65$10,919
Apr 200501,47549.207.36$10,857
Mar 200561,61050.377.15$11,822
Feb 200501,22245.226.31$7,713
Jan 200531,54143.166.32$9,872
Dec 200441,48739.866.75$10,198
Nov 200441,50345.286.33$9,696
Oct 200402,19549.706.52$14,301
Sep 200452,02143.245.28$10,895
Aug 200452,12042.375.55$11,979
Jul 200452,00638.286.08$12,396
Jun 200442,08236.106.43$13,538
May 200412,28437.486.49$14,871
Apr 2004221534.475.86$1,329
Mar 2004396234.365.53$5,423
Feb 200461,56032.455.51$8,790
Jan 200431,90132.036.30$12,072
Dec 200341,73930.266.30$11,080
Nov 200371,99928.804.60$9,387
Oct 200342,26428.174.76$10,889
Sep 200302,03326.314.75$9,655
Aug 200342,34929.765.13$12,169
Jul 200341,90229.415.17$9,953
Jun 200302,11028.565.98$12,624
May 200373,09226.595.97$18,654
Apr 200331,94126.675.41$10,576
Mar 200378,36931.146.10$51,236
Feb 2003101,71033.487.93$13,888
Jan 200382,35030.315.58$13,360
Dec 200292,46926.914.85$12,226
Nov 200282,42924.664.14$10,246
Oct 2002122,36826.464.23$10,332
Sep 200242,52227.443.64$9,278
Aug 200292,19525.963.16$7,179
Jul 200252,98424.583.06$9,259
Jun 2002122,74423.733.34$9,445
May 200203,00824.663.58$10,781
Apr 200263,28523.653.51$11,680
Mar 200263,44522.003.10$10,821
Feb 200283,08618.222.38$7,477
Jan 2002143,52917.172.38$8,624
Dec 200104,04716.932.36$9,569
Nov 2001284,04818.072.41$10,244
Oct 2001285,52119.782.53$14,516
Sep 2001203,84224.262.25$9,135
Aug 200102,24524.873.05$6,854
Jul 200105,59223.933.20$17,878
Jun 200104,42524.563.82$16,922
May 200103,00225.524.31$12,931

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   42 Mcf  × $  3.05 =       $128

────────────────────────────────────────────────────
Month total                                     $128

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/185285 is the state's own key, not one this site invented.