FIELDS 51

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 186243District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$357 k
Aug 2001 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
298
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-02-15145838
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition80 bbl$5,071
GasProduction62,578 Mcf$351,985
Total$357,057

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5419, -100.6160. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.54193, -100.61600 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,101 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,101 ft.

Completions filed
Aug 2001
1 of 1 wells

1 well

42-4353554286,101 ftAug 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (298)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

298 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 201804246.594.19$176
Nov 201805452.934.24$229
Oct 201804361.443.40$146
Sep 201803359.543.11$103
Aug 201805459.403.07$166
Jul 20180165.142.93$3
Jun 201803760.183.08$114
May 201806965.382.90$200
Apr 20180163.842.90$3
Mar 20180361.222.79$8
Feb 201802361.782.77$64
Jan 201802862.874.01$112
Dec 20170157.272.92$3
Nov 20170155.423.12$3
Oct 20170249.292.98$6
Sep 201702047.523.09$62
Aug 201701945.373.00$57
Jul 201702543.873.09$77
Jun 201702742.493.09$83
May 201703945.373.26$127
Apr 201703247.933.21$103
Mar 201703446.772.98$101
Feb 201703150.452.95$92
Jan 201704449.413.42$150
Dec 201603748.763.72$138
Nov 201604442.492.64$116
Oct 201603446.193.09$105
Sep 201603741.553.10$115
Aug 201604241.442.92$123
Jul 201601441.622.92$41
Jun 201605345.352.69$142
May 201604142.521.99$82
Apr 201604736.561.99$94
Mar 201605733.011.79$102
Feb 201604426.472.06$91
Jan 201605527.352.36$130
Dec 201506332.362.00$126
Nov 201505038.792.17$108
Oct 201505743.552.43$138
Sep 201504642.992.76$127
Aug 201502340.162.87$66
Jul 201504148.152.95$121
Jun 201505456.152.88$156
May 201504855.212.96$142
Apr 201504949.822.71$133
Mar 201504242.892.93$123
Feb 201503744.662.98$110
Jan 201506243.433.10$192
Dec 201408754.693.59$312
Nov 2014031870.464.25$1,352
Oct 2014025478.303.90$991
Sep 2014026286.164.05$1,060
Aug 2014027089.394.04$1,089
Jul 2014031896.564.18$1,329
Jun 2014029298.164.74$1,383
May 2014029194.734.73$1,375
Apr 2014029295.944.81$1,404
Mar 2014031495.895.06$1,588
Feb 2014026097.406.19$1,610
Jan 2014026890.404.86$1,303
Dec 2013027791.824.35$1,206
Nov 201304488.853.74$164
Oct 201304297.423.78$159
Sep 2013019104.113.72$71
Aug 2013098104.253.52$345
Jul 20130141102.523.72$524
Jun 2013014094.403.93$551
May 2013015394.834.15$635
Apr 2013015593.964.28$664
Mar 2013016693.623.91$650
Feb 2013014591.233.42$496
Jan 2013016591.603.42$564
Dec 2012014186.773.42$482
Nov 201208886.953.62$319
Oct 201208889.383.40$299
Sep 201209294.672.92$268
Aug 2012011292.662.91$326
Jul 2012012685.133.02$381
Jun 2012013479.822.52$338
May 2012015791.612.49$391
Apr 20120175101.652.00$349
Mar 20120196105.052.22$436
Feb 20120182101.102.57$468
Jan 2012020098.092.73$547
Dec 2011019596.873.24$632
Nov 2011020495.723.31$676
Oct 2011019484.983.65$708
Sep 2011015983.623.99$634
Aug 2011011683.404.15$481
Jul 2011013394.144.52$601
Jun 2011016192.904.64$747
May 2011020398.134.40$894
Apr 20110239105.964.33$1,036
Mar 2011023696.364.06$958
Feb 2011022585.644.18$941
Jan 2011026586.504.59$1,216
Dec 2010030285.734.35$1,313
Nov 2010040180.843.80$1,522
Oct 2010042178.103.51$1,477
Sep 2010041272.633.98$1,640
Aug 2010044873.684.42$1,980
Jul 2010045472.554.74$2,150
Jun 2010045370.364.91$2,224
May 2010045171.124.24$1,910
Apr 2010042381.694.12$1,744
Mar 2010045978.394.39$2,014
Feb 2010040873.585.44$2,220
Jan 2010040474.365.96$2,409
Dec 2009043971.445.48$2,407
Nov 2009061374.593.75$2,300
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009028667.423.22$920
Jul 2009028361.133.46$980
Jun 2009026266.163.90$1,020
May 2009032154.743.93$1,260
Apr 2009027246.773.59$976
Mar 2009032142.144.06$1,303
Feb 2009031132.814.63$1,441
Jan 2009017435.865.37$935
Dec 2008014837.105.98$885
Nov 2008019955.496.86$1,365
Oct 2008025875.246.92$1,786
Sep 20080252101.767.88$1,985
Aug 20080323114.228.48$2,740
Jul 20080360131.0811.39$4,100
Jun 20083363131.3313.03$5,125
May 20081362123.1711.57$4,313
Apr 20084342110.3110.45$4,017
Mar 20081363101.909.66$3,610
Feb 2008134092.538.77$3,075
Jan 2008338590.388.21$3,430
Dec 2007338388.337.30$3,062
Nov 2007139191.677.29$2,943
Oct 2007135682.856.92$2,547
Sep 2007131475.846.24$2,037
Aug 2007220369.066.39$1,435
Jul 2007045370.906.39$2,894
Jun 2007186762.007.55$6,607
May 2007134258.747.85$2,742
Apr 2007136759.617.81$2,924
Mar 2007024856.927.30$1,811
Feb 2007116455.108.22$1,403
Jan 2007027050.306.73$1,816
Dec 2006125956.656.92$1,849
Nov 2006145954.207.62$3,551
Oct 2006148254.906.01$2,954
Sep 2006148060.085.04$2,478
Aug 2006149868.717.34$3,724
Jul 2006249269.376.34$3,259
Jun 2006448066.286.38$3,329
May 2006260466.016.42$4,013
Apr 2006458864.397.36$4,586
Mar 2006061256.707.08$4,335
Feb 2006253957.597.75$4,293
Jan 2006056860.598.93$5,074
Dec 2005257054.9413.42$7,757
Nov 2005455754.6910.59$6,117
Oct 2005059058.3413.80$8,140
Sep 2005257561.4512.08$7,068
Aug 2005258761.519.80$5,874
Jul 2005058555.697.84$4,589
Jun 2005258452.337.38$4,415
May 2005267145.226.65$4,553
Apr 2005270349.207.36$5,273
Mar 2005373050.377.15$5,374
Feb 2005068945.226.31$4,349
Jan 2005076043.166.32$4,805
Dec 2004067039.866.75$4,523
Nov 2004037645.286.33$2,380
Oct 2004038749.706.52$2,521
Sep 2004038843.245.28$2,050
Aug 2004039342.375.55$2,181
Jul 2004039738.286.08$2,415
Jun 2004137336.106.43$2,436
May 2004146137.486.49$3,031
Apr 2004249534.475.86$2,969
Mar 2004153134.365.53$2,971
Feb 2004150432.455.51$2,809
Jan 2004154932.036.30$3,491
Dec 2003256430.266.30$3,615
Nov 2003156828.804.60$2,639
Oct 2003157928.174.76$2,784
Sep 2003053526.314.75$2,541
Aug 2003059029.765.13$3,027
Jul 2003057829.415.17$2,989
Jun 2003164628.565.98$3,894
May 2003069526.595.97$4,151
Apr 2003061626.675.41$3,331
Mar 2003038731.146.10$2,359
Feb 2003235533.487.93$2,881
Jan 2003155330.315.58$3,117
Dec 20021026.914.85$27
Nov 2002145624.664.14$1,911
Oct 2002076926.464.23$3,252
Sep 2002039527.443.64$1,436
Aug 2002089325.963.16$2,826
Jul 2002027124.583.06$830
Jun 2002029723.733.34$991
May 2002040424.663.58$1,448
Apr 2002051223.653.51$1,798
Mar 2002029322.003.10$909
Feb 2002044218.222.38$1,050
Jan 2002058117.172.38$1,380
Dec 2001088016.932.36$2,081
Nov 2001075918.072.41$1,826
Oct 2001088219.782.53$2,230
Sep 2001078324.262.25$1,763
Aug 200101,20624.873.05$3,682

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2018 — as filed, then multipliedworked
Condensate             0 bbl  × $ 46.59 =         $0
Gas                   42 Mcf  × $  4.19 =       $176

────────────────────────────────────────────────────
Month total                                     $176

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/186243 is the state's own key, not one this site invented.