DAVIS "C"

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 186715District 7CField 846465002 tax incentive programmesCondensateGasSaveExport
Value, all time
$834 k
Oct 2001 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
296
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-02-26146427
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1 bbl$73
GasProduction170,593 Mcf$833,597
Total$833,670

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6737, -100.6533. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.67373, -100.65331 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,261 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,261 ft.

Completions filed
Oct 2001
1 of 1 wells

1 well

42-43535621156,261 ftOct 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (296)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

296 months

May 2026045106.413.05$137
Apr 202604698.932.87$132
Mar 202604589.753.15$142
Feb 202604263.503.75$158
Jan 202604759.138.00$376
Dec 202504856.664.41$212
Nov 202504758.593.93$185
Oct 202504959.383.30$162
Sep 202504562.743.08$138
Aug 202504663.933.01$139
Jul 202504866.743.32$159
Jun 202504666.483.13$144
May 202504860.553.23$155
Apr 202504662.363.54$163
Mar 202505067.704.27$213
Feb 202504670.884.34$200
Jan 202505374.324.28$227
Dec 202405468.993.12$169
Nov 202405569.052.20$121
Oct 202405071.372.28$114
Sep 202403169.612.36$73
Aug 202402975.632.06$60
Jul 202402479.932.15$52
Jun 202402578.082.63$66
May 202402578.812.20$55
Apr 202402584.451.66$41
Mar 202403780.301.55$57
Feb 202403676.091.78$64
Jan 202403673.023.30$119
Dec 20230171.262.61$3
Nov 20230277.892.81$6
Oct 20230185.443.09$3
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230174.852.64$3
Jun 20230068.962.26$0
May 20230170.622.23$2
Apr 20230078.122.24$0
Mar 20230172.852.39$2
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220176.415.73$6
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220194.529.13$9
Jul 202201101.587.54$8
Jun 202201115.097.98$8
May 2022043109.378.43$363
Apr 2022071104.226.84$485
Mar 2022074108.885.08$376
Feb 202206791.054.86$326
Jan 202207481.844.54$336
Dec 202107471.323.90$289
Nov 202107177.435.24$372
Oct 202107379.795.71$417
Sep 202107069.865.35$375
Aug 202107266.024.22$304
Jul 202107270.783.98$287
Jun 202107069.493.38$237
May 202107263.483.02$217
Apr 202107060.362.76$193
Mar 202107261.302.72$196
Feb 202106657.805.55$366
Jan 202107550.412.81$211
Dec 202007344.642.68$195
Nov 202007138.772.71$192
Oct 202007236.972.48$178
Sep 202007037.091.99$139
Aug 202007239.982.39$172
Jul 202007238.371.83$131
Jun 202007034.901.69$118
May 202007216.921.81$131
Apr 202007014.751.80$126
Mar 202007330.341.86$136
Feb 202006849.881.98$135
Jan 202007457.252.09$155
Dec 201907259.012.30$166
Nov 201906955.302.75$190
Oct 201907253.472.42$174
Sep 201907155.052.66$189
Aug 201907053.112.30$161
Jul 201907056.272.46$172
Jun 201906952.782.49$172
May 201907358.482.74$200
Apr 201907162.632.75$195
Mar 201907556.803.06$230
Feb 201906850.852.79$190
Jan 201907646.033.23$245
Dec 201807446.594.19$310
Nov 201807252.934.24$305
Oct 201807661.443.40$258
Sep 201807459.543.11$230
Aug 201807759.403.07$236
Jul 201807865.142.93$229
Jun 201807760.183.08$237
May 201808065.382.90$232
Apr 201808063.842.90$232
Mar 201808461.222.79$234
Feb 201807861.782.77$216
Jan 201809262.874.01$369
Dec 201706657.272.92$193
Nov 201708755.423.12$271
Oct 201709249.292.98$275
Sep 201709147.523.09$281
Aug 201709645.373.00$288
Jul 201709943.873.09$306
Jun 201709842.493.09$303
May 2017010545.373.26$343
Apr 2017010447.933.21$334
Mar 2017010646.772.98$316
Feb 201709550.452.95$281
Jan 2017010549.413.42$359
Dec 2016010548.763.72$391
Nov 2016010042.492.64$264
Oct 2016010146.193.09$312
Sep 201609741.553.10$301
Aug 2016010041.442.92$292
Jul 2016010041.622.92$292
Jun 201609745.352.69$261
May 2016010142.521.99$201
Apr 201609836.561.99$195
Mar 2016010333.011.79$185
Feb 201609826.472.06$202
Jan 2016010927.352.36$258
Dec 201508732.362.00$174
Nov 2015010738.792.17$232
Oct 2015011043.552.43$267
Sep 201507642.992.76$210
Aug 201505540.162.87$158
Jul 2015011548.152.95$339
Jun 2015011056.152.88$317
May 2015011755.212.96$346
Apr 2015011849.822.71$319
Mar 2015013042.892.93$382
Feb 2015012044.662.98$357
Jan 2015013643.433.10$422
Dec 2014013654.693.59$488
Nov 2014013570.464.25$574
Oct 2014013878.303.90$538
Sep 2014012686.164.05$510
Aug 2014011489.394.04$460
Jul 2014015196.564.18$631
Jun 201408498.164.74$398
May 2014016094.734.73$756
Apr 2014015895.944.81$760
Mar 2014015595.895.06$784
Feb 2014014597.406.19$898
Jan 2014016090.404.86$778
Dec 2013015991.824.35$692
Nov 2013015488.853.74$576
Oct 2013016097.423.78$605
Sep 2013077104.113.72$286
Aug 201302104.253.52$7
Jul 201305102.523.72$19
Jun 201301794.403.93$67
May 20130994.834.15$37
Apr 201304093.964.28$171
Mar 2013012493.623.91$485
Feb 2013015991.233.42$544
Jan 2013017991.603.42$612
Dec 2012018686.773.42$636
Nov 2012019086.953.62$689
Oct 2012019989.383.40$677
Sep 2012018794.672.92$546
Aug 2012019692.662.91$570
Jul 2012020785.133.02$625
Jun 2012021679.822.52$544
May 2012023391.612.49$580
Apr 20120233101.652.00$465
Mar 20120210105.052.22$467
Feb 20120237101.102.57$609
Jan 2012027298.092.73$744
Dec 201109796.873.24$314
Nov 201108395.723.31$275
Oct 201109484.983.65$343
Sep 2011017583.623.99$698
Aug 201106883.404.15$282
Jul 201109794.144.52$438
Jun 2011013492.904.64$622
May 2011029398.134.40$1,291
Apr 20110328105.964.33$1,421
Mar 2011034096.364.06$1,380
Feb 2011031585.644.18$1,317
Jan 2011031786.504.59$1,455
Dec 2010031885.734.35$1,383
Nov 2010031480.843.80$1,192
Oct 2010033178.103.51$1,161
Sep 2010034772.633.98$1,381
Aug 2010036273.684.42$1,600
Jul 2010040472.554.74$1,914
Jun 2010042770.364.91$2,097
May 2010033271.124.24$1,406
Apr 2010043781.694.12$1,802
Mar 2010055778.394.39$2,444
Feb 2010050573.585.44$2,748
Jan 2010056374.365.96$3,358
Dec 2009056471.445.48$3,093
Nov 2009055774.593.75$2,090
Oct 2009157972.544.11$2,452
Sep 2009057065.543.06$1,747
Aug 2009056867.423.22$1,828
Jul 2009038561.133.46$1,334
Jun 2009043566.163.90$1,694
May 2009058754.743.93$2,304
Apr 2009057946.773.59$2,077
Mar 2009061442.144.06$2,492
Feb 2009053332.814.63$2,469
Jan 2009065135.865.37$3,497
Dec 2008071037.105.98$4,244
Nov 2008059955.496.86$4,109
Oct 2008047975.246.92$3,316
Sep 20080352101.767.88$2,773
Aug 20080344114.228.48$2,918
Jul 20080338131.0811.39$3,850
Jun 20080323131.3313.03$4,210
May 20080339123.1711.57$3,924
Apr 20080325110.3110.45$3,398
Mar 20080333101.909.66$3,218
Feb 2008031192.538.77$2,728
Jan 2008028990.388.21$2,371
Dec 2007029888.337.30$2,176
Nov 2007028591.677.29$2,078
Oct 2007025282.856.92$1,744
Sep 2007037975.846.24$2,367
Aug 2007035769.066.39$2,280
Jul 2007029270.906.39$1,865
Jun 2007032962.007.55$2,483
May 2007045658.747.85$3,578
Apr 2007033959.617.81$2,646
Mar 2007051056.927.30$3,724
Feb 2007053755.108.22$4,412
Jan 2007059450.306.73$3,996
Dec 2006058156.656.92$4,020
Nov 2006056254.207.62$4,281
Oct 2006055354.906.01$3,326
Sep 2006052060.085.04$2,619
Aug 2006069268.717.34$5,079
Jul 2006065169.376.34$4,129
Jun 2006076566.286.38$4,884
May 2006079066.016.42$5,076
Apr 2006080064.397.36$5,888
Mar 2006082556.707.08$5,843
Feb 2006078457.597.75$6,077
Jan 2006080960.598.93$7,227
Dec 2005084854.9413.42$11,376
Nov 2005071754.6910.59$7,592
Oct 200501,68858.3413.80$23,287
Sep 200501,59761.4512.08$19,290
Aug 200501,61561.519.80$15,822
Jul 200501,17955.697.84$9,248
Jun 200501,18052.337.38$8,710
May 200501,51045.226.65$10,043
Apr 200501,28749.207.36$9,473
Mar 200501,34550.377.15$9,623
Feb 200501,18245.226.31$7,461
Jan 200501,80043.166.32$11,380
Dec 200401,57539.866.75$10,633
Nov 200402,00045.286.33$12,661
Oct 200402,55149.706.52$16,620
Sep 200401,96743.245.28$10,393
Aug 200402,02542.375.55$11,240
Jul 200402,24738.286.08$13,671
Jun 200401,90136.106.43$12,229
May 200401,85637.486.49$12,054
Apr 200401,69734.475.86$9,942
Mar 200401,35234.365.53$7,477
Feb 200401,84632.455.51$10,171
Jan 200402,32932.036.30$14,672
Dec 200302,57930.266.30$16,252
Nov 200302,07628.804.60$9,540
Oct 200302,09828.174.76$9,986
Sep 200302,72826.314.75$12,956
Aug 200302,18629.765.13$11,214
Jul 200302,06229.415.17$10,662
Jun 200302,05228.565.98$12,277
May 2003058126.595.97$3,470
Apr 200302,29726.675.41$12,421
Mar 200301,67731.146.10$10,223
Feb 200301,57833.487.93$12,507
Jan 200302,37030.315.58$13,229
Dec 200202,84326.914.85$13,799
Nov 200202,89924.664.14$11,993
Oct 200201,09226.464.23$4,618
Sep 200201,25227.443.64$4,551
Aug 200201,56925.963.16$4,965
Jul 200202,01324.583.06$6,163
Jun 200202,34823.733.34$7,838
May 200202,09724.663.58$7,516
Apr 200202,21923.653.51$7,794
Mar 200203,47722.003.10$10,788
Feb 200204,35618.222.38$10,348
Jan 200205,63317.172.38$13,382
Dec 200108,63016.932.36$20,405
Nov 2001010,70718.072.41$25,756
Oct 2001010,29519.782.53$26,035

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   45 Mcf  × $  3.05 =       $137

────────────────────────────────────────────────────
Month total                                     $137

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/186715 is the state's own key, not one this site invented.