KIRBY "1"

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 187729District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.5 M
Nov 2001 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
295
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-04-19146854
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition353 bbl$19,247
GasProduction294,294 Mcf$1,514,981
Total$1,534,229

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6410, -100.7446. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.64099, -100.74462 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,900 ft.

Completions filed
Nov 2001
1 of 1 wells

1 well

42-4353564957,900 ftNov 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (295)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

295 months

May 2026062106.413.05$189
Apr 202603598.932.87$100
Mar 202605189.753.15$161
Feb 202604663.503.75$173
Jan 202605259.138.00$416
Dec 202505256.664.41$229
Nov 202505458.593.93$212
Oct 202504959.383.30$162
Sep 202505062.743.08$154
Aug 202505163.933.01$154
Jul 202505166.743.32$169
Jun 202505066.483.13$156
May 202505160.553.23$165
Apr 202505062.363.54$177
Mar 202505267.704.27$222
Feb 202504870.884.34$208
Jan 202505474.324.28$231
Dec 202405468.993.12$169
Nov 202405169.052.20$112
Oct 202405471.372.28$123
Sep 202405369.612.36$125
Aug 202405575.632.06$114
Jul 202405579.932.15$118
Jun 202405478.082.63$142
May 202405678.812.20$123
Apr 202405384.451.66$88
Mar 202405680.301.55$87
Feb 202405376.091.78$95
Jan 202405773.023.30$188
Dec 202305671.262.61$146
Nov 202305277.892.81$146
Oct 202305685.443.09$173
Sep 202305489.042.74$148
Aug 202305780.522.67$152
Jul 202309174.852.64$240
Jun 202302368.962.26$52
May 202305170.622.23$114
Apr 202305678.122.24$125
Mar 202306372.852.39$151
Feb 202305875.112.47$143
Jan 202309676.533.39$325
Dec 202203576.415.73$201
Nov 202206385.005.65$356
Oct 202213987.185.86$316
Sep 202204784.888.16$384
Aug 202204694.529.13$420
Jul 2022155101.587.54$516
Jun 2022054115.097.98$431
May 2022053109.378.43$447
Apr 2022057104.226.84$390
Mar 2022053108.885.08$269
Feb 202205091.054.86$243
Jan 202204981.844.54$222
Dec 202106371.323.90$246
Nov 202105877.435.24$304
Oct 202106179.795.71$349
Sep 202105969.865.35$316
Aug 202106366.024.22$266
Jul 202106470.783.98$255
Jun 202106569.493.38$220
May 202116163.483.02$248
Apr 202106160.362.76$168
Mar 202106361.302.72$171
Feb 202105857.805.55$322
Jan 202106750.412.81$188
Dec 202006644.642.68$177
Nov 202016638.772.71$217
Oct 202006936.972.48$171
Sep 202006737.091.99$133
Aug 202047439.982.39$336
Jul 202007138.371.83$130
Jun 202007134.901.69$120
May 202007916.921.81$143
Apr 202006914.751.80$125
Mar 202007530.341.86$139
Feb 202006649.881.98$131
Jan 202008657.252.09$180
Dec 201908259.012.30$189
Nov 201917855.302.75$270
Oct 201908053.472.42$193
Sep 201937855.052.66$372
Aug 201909853.112.30$226
Jul 201902456.272.46$59
Jun 201908052.782.49$199
May 201971658.482.74$453
Apr 201904962.632.75$135
Mar 201905356.803.06$162
Feb 201904950.852.79$137
Jan 201905046.033.23$161
Dec 201805346.594.19$222
Nov 201815652.934.24$290
Oct 201805961.443.40$200
Sep 201816159.543.11$249
Aug 201806059.403.07$184
Jul 201806565.142.93$191
Jun 201806660.183.08$203
May 201806965.382.90$200
Apr 201806763.842.90$194
Mar 201806561.222.79$181
Feb 201816661.782.77$244
Jan 201817262.874.01$352
Dec 201707457.272.92$216
Nov 201707855.423.12$243
Oct 201708349.292.98$248
Sep 201708647.523.09$266
Aug 201709145.373.00$273
Jul 201709743.873.09$299
Jun 201709542.493.09$293
May 201709545.373.26$310
Apr 201709747.933.21$312
Mar 201709646.772.98$286
Feb 201708550.452.95$251
Jan 2017010249.413.42$349
Dec 2016010648.763.72$395
Nov 2016110542.492.64$320
Oct 2016011846.193.09$365
Sep 2016010541.553.10$326
Aug 2016010941.442.92$319
Jul 2016010841.622.92$316
Jun 2016010645.352.69$285
May 2016110742.521.99$256
Apr 2016011336.561.99$225
Mar 2016012733.011.79$228
Feb 2016012026.472.06$248
Jan 2016012827.352.36$303
Dec 2015012932.362.00$258
Nov 2015012138.792.17$262
Oct 2015013343.552.43$323
Sep 2015011342.992.76$312
Aug 2015111640.162.87$373
Jul 2015012048.152.95$353
Jun 2015012356.152.88$355
May 2015113955.212.96$466
Apr 2015012749.822.71$344
Mar 2015014642.892.93$428
Feb 2015012844.662.98$381
Jan 2015015443.433.10$478
Dec 2014017054.693.59$611
Nov 2014016770.464.25$710
Oct 2014014078.303.90$546
Sep 2014018286.164.05$736
Aug 201409389.394.04$375
Jul 2014115296.564.18$732
Jun 2014019098.164.74$900
May 2014118994.734.73$988
Apr 2014021695.944.81$1,039
Mar 2014123495.895.06$1,279
Feb 2014123497.406.19$1,546
Jan 2014125590.404.86$1,330
Dec 2013025991.824.35$1,128
Nov 2013022688.853.74$845
Oct 2013015997.423.78$601
Sep 20130138104.113.72$513
Aug 20130180104.253.52$634
Jul 20130179102.523.72$665
Jun 2013016694.403.93$653
May 2013017994.834.15$743
Apr 2013016293.964.28$694
Mar 2013017293.623.91$673
Feb 2013010691.233.42$363
Jan 201303491.603.42$116
Dec 201201686.773.42$55
Nov 201204386.953.62$156
Oct 2012018889.383.40$639
Sep 2012024394.672.92$709
Aug 2012021392.662.91$619
Jul 2012013385.133.02$402
Jun 20120279.822.52$5
May 201209691.612.49$239
Apr 20120160101.652.00$319
Mar 2012079105.052.22$176
Feb 2012091101.102.57$234
Jan 2012018098.092.73$492
Dec 2011016096.873.24$518
Nov 2011015195.723.31$500
Oct 2011022384.983.65$814
Sep 2011026883.623.99$1,068
Aug 2011030483.404.15$1,261
Jul 2011032194.144.52$1,450
Jun 2011031792.904.64$1,471
May 2011036798.134.40$1,617
Apr 20110294105.964.33$1,274
Mar 2011030796.364.06$1,246
Feb 2011148385.644.18$2,105
Jan 2011163886.504.59$3,014
Dec 2010279585.734.35$3,628
Nov 2010374980.843.80$3,085
Oct 2010281278.103.51$3,005
Sep 2010475872.633.98$3,307
Aug 2010077373.684.42$3,416
Jul 2010185472.554.74$4,118
Jun 2010286870.364.91$4,403
May 2010391471.124.24$4,084
Apr 2010288581.694.12$3,812
Mar 2010392278.394.39$4,282
Feb 2010487073.585.44$5,029
Jan 2010197074.365.96$5,860
Dec 2009394171.445.48$5,375
Nov 2009596574.593.75$3,993
Oct 2009499972.544.11$4,396
Sep 2009196765.543.06$3,029
Aug 2009187667.423.22$2,887
Jul 2009185361.133.46$3,016
Jun 200911,02066.163.90$4,039
May 200921,15254.743.93$4,632
Apr 200921,03146.773.59$3,792
Mar 200921,21642.144.06$5,020
Feb 200921,12532.814.63$5,278
Jan 200921,27535.865.37$6,920
Dec 200831,30437.105.98$7,905
Nov 200831,29355.496.86$9,037
Oct 200821,46675.246.92$10,298
Sep 20081761101.767.88$6,096
Aug 200821,192114.228.48$10,340
Jul 200811,439131.0811.39$16,520
Jun 200821,044131.3313.03$13,869
May 200811,489123.1711.57$17,357
Apr 200831,428110.3110.45$15,260
Mar 200821,326101.909.66$13,018
Feb 200831,01892.538.77$9,206
Jan 200841,35590.388.21$11,480
Dec 200731,53788.337.30$11,488
Nov 200771,50591.677.29$11,616
Oct 200781,82182.856.92$13,268
Sep 200741,59475.846.24$10,257
Aug 200731,66369.066.39$10,830
Jul 200741,65470.906.39$10,849
Jun 200741,77962.007.55$13,677
May 200771,98958.747.85$16,017
Apr 200772,01359.617.81$16,129
Mar 200762,08256.927.30$15,544
Feb 200741,52455.108.22$12,742
Jan 200731,00950.306.73$6,938
Dec 200661,14656.656.92$8,268
Nov 200641,47154.207.62$11,422
Oct 200611,21854.906.01$7,380
Sep 200631,11260.085.04$5,782
Aug 200601,32668.717.34$9,733
Jul 200621,41969.376.34$9,139
Jun 200621,29066.286.38$8,368
May 200601,72766.016.42$11,096
Apr 200621,61264.397.36$11,994
Mar 200671,86256.707.08$13,585
Feb 200641,78257.597.75$14,043
Jan 200642,19760.598.93$19,869
Dec 200561,78054.9413.42$24,209
Nov 200521,48254.6910.59$15,801
Oct 200561,44758.3413.80$20,313
Sep 200511,51761.4512.08$18,385
Aug 200501,47261.519.80$14,421
Jul 200501,43555.697.84$11,256
Jun 200502,03352.337.38$15,006
May 200502,23845.226.65$14,885
Apr 200502,35949.207.36$17,363
Mar 200501,59950.377.15$11,441
Feb 200501,53045.226.31$9,657
Jan 200502,25043.166.32$14,225
Dec 200402,30339.866.75$15,548
Nov 200401,80145.286.33$11,401
Oct 2004111,48249.706.52$10,202
Sep 200401,64943.245.28$8,713
Aug 200401,82642.375.55$10,136
Jul 200401,89038.286.08$11,499
Jun 200401,96436.106.43$12,634
May 200494,21337.486.49$27,699
Apr 200472,26234.475.86$13,493
Mar 200403,11334.365.53$17,215
Feb 200402,66032.455.51$14,656
Jan 200472,99432.036.30$19,085
Dec 200303,87730.266.30$24,431
Nov 200372,59828.804.60$12,140
Oct 200303,61528.174.76$17,206
Sep 200302,82626.314.75$13,422
Aug 200302,20429.765.13$11,306
Jul 200303,09229.415.17$15,988
Jun 200303,37028.565.98$20,163
May 200394,21326.595.97$25,402
Apr 200304,30326.675.41$23,268
Mar 200304,33231.146.10$26,408
Feb 2003153,92233.487.93$31,588
Jan 2003154,76630.315.58$27,059
Dec 200204,68626.914.85$22,745
Nov 2002154,33224.664.14$18,291
Oct 200205,26926.464.23$22,283
Sep 200205,77327.443.64$20,986
Aug 2002155,60325.963.16$18,118
Jul 200206,62424.583.06$20,281
Jun 200207,33923.733.34$24,499
May 2002158,26824.663.58$30,002
Apr 200249,20623.653.51$32,429
Mar 2002010,64322.003.10$33,022
Feb 2002010,90518.222.38$25,907
Jan 2002013,37517.172.38$31,775
Dec 2001014,45716.932.36$34,182
Nov 20010018.072.41$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   62 Mcf  × $  3.05 =       $189

────────────────────────────────────────────────────
Month total                                     $189

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/187729 is the state's own key, not one this site invented.