WARD 114

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 188805District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$681 k
Jul 2001 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
299
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-06-11148004
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition134 bbl$5,270
GasProduction130,177 Mcf$675,943
Total$681,213

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5246, -100.7087. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52462, -100.70871 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,900 ft.

Completions filed
Jul 2001
1 of 1 wells

1 well

42-43535527156,900 ftJul 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (299)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

299 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240168.993.12$3
Nov 20240169.052.20$2
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240175.632.06$2
Jul 20240179.932.15$2
Jun 20240178.082.63$3
May 20240178.812.20$2
Apr 20240184.451.66$2
Mar 20240180.301.55$2
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230271.262.61$5
Nov 20230077.892.81$0
Oct 20230185.443.09$3
Sep 202301289.042.74$33
Aug 202301280.522.67$32
Jul 202301574.852.64$40
Jun 202301268.962.26$27
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220285.005.65$11
Oct 20220287.185.86$12
Sep 20220184.888.16$8
Aug 20220294.529.13$18
Jul 202202101.587.54$15
Jun 202205115.097.98$40
May 2022013109.378.43$110
Apr 2022019104.226.84$130
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 202101260.362.76$33
Mar 202101761.302.72$46
Feb 202101057.805.55$55
Jan 202101250.412.81$34
Dec 202001344.642.68$35
Nov 202001538.772.71$41
Oct 202001736.972.48$42
Sep 202001837.091.99$36
Aug 202001939.982.39$45
Jul 202001738.371.83$31
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190453.472.42$10
Sep 201901355.052.66$35
Aug 20190953.112.30$21
Jul 201901656.272.46$39
Jun 20190052.782.49$0
May 20190858.482.74$22
Apr 201902262.632.75$61
Mar 201902856.803.06$86
Feb 201902350.852.79$64
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180152.934.24$4
Oct 20180361.443.40$10
Sep 20180359.543.11$9
Aug 20180559.403.07$15
Jul 20180365.142.93$9
Jun 20180260.183.08$6
May 20180665.382.90$17
Apr 20180563.842.90$15
Mar 20180861.222.79$22
Feb 20180661.782.77$17
Jan 201801962.874.01$76
Dec 201703557.272.92$102
Nov 201703755.423.12$115
Oct 201702549.292.98$75
Sep 201702347.523.09$71
Aug 201702545.373.00$75
Jul 201712743.873.09$127
Jun 201703542.493.09$108
May 201703845.373.26$124
Apr 201703847.933.21$122
Mar 201703846.772.98$113
Feb 201703750.452.95$109
Jan 201703549.413.42$120
Dec 201603648.763.72$134
Nov 201603642.492.64$95
Oct 201603346.193.09$102
Sep 201603141.553.10$96
Aug 201603341.442.92$97
Jul 201604141.622.92$120
Jun 201604345.352.69$115
May 201604842.521.99$96
Apr 201605136.561.99$102
Mar 201606833.011.79$122
Feb 201603626.472.06$74
Jan 201606827.352.36$161
Dec 201503232.362.00$64
Nov 201504438.792.17$95
Oct 20150143.552.43$2
Sep 20150242.992.76$6
Aug 201501840.162.87$52
Jul 201502848.152.95$82
Jun 201504456.152.88$127
May 201505255.212.96$154
Apr 201504849.822.71$130
Mar 201508242.892.93$241
Feb 201505944.662.98$176
Jan 201507443.433.10$229
Dec 201406754.693.59$241
Nov 201408870.464.25$374
Oct 201409078.303.90$351
Sep 201409286.164.05$372
Aug 201409989.394.04$399
Jul 2014010096.564.18$418
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 201403395.895.06$167
Feb 2014010597.406.19$650
Jan 2014011090.404.86$535
Dec 2013012191.824.35$527
Nov 2013014488.853.74$538
Oct 2013018897.423.78$711
Sep 20130138104.113.72$513
Aug 20130213104.253.52$750
Jul 20130237102.523.72$881
Jun 2013023294.403.93$913
May 2013024694.834.15$1,021
Apr 2013023693.964.28$1,011
Mar 2013024293.623.91$947
Feb 2013021791.233.42$742
Jan 2013023591.603.42$804
Dec 2012023086.773.42$787
Nov 2012023186.953.62$837
Oct 2012024789.383.40$840
Sep 2012024094.672.92$700
Aug 2012025892.662.91$750
Jul 2012026085.133.02$785
Jun 2012026079.822.52$655
May 2012027291.612.49$677
Apr 20120262101.652.00$523
Mar 20120274105.052.22$609
Feb 20120253101.102.57$650
Jan 2012026998.092.73$735
Dec 2011026196.873.24$846
Nov 2011028795.723.31$950
Oct 2011033184.983.65$1,208
Sep 2011032383.623.99$1,287
Aug 2011035083.404.15$1,452
Jul 2011036894.144.52$1,662
Jun 2011039392.904.64$1,823
May 2011045398.134.40$1,995
Apr 20110470105.964.33$2,037
Mar 2011053596.364.06$2,171
Feb 2011057285.644.18$2,391
Jan 20111184786.504.59$4,838
Dec 2010062585.734.35$2,717
Nov 2010064880.843.80$2,459
Oct 2010072678.103.51$2,547
Sep 2010077172.633.98$3,068
Aug 2010079473.684.42$3,509
Jul 2010076572.554.74$3,623
Jun 2010080570.364.91$3,953
May 2010081671.124.24$3,456
Apr 2010081681.694.12$3,364
Mar 2010091978.394.39$4,033
Feb 2010089973.585.44$4,893
Jan 201001,08774.365.96$6,483
Dec 200901,17371.445.48$6,432
Nov 200901,46474.593.75$5,492
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009098467.423.22$3,167
Jul 200901,11961.133.46$3,877
Jun 2009081966.163.90$3,190
May 2009072854.743.93$2,858
Apr 2009078346.773.59$2,809
Mar 2009099042.144.06$4,018
Feb 2009090132.814.63$4,174
Jan 200901,08735.865.37$5,838
Dec 200801,13137.105.98$6,760
Nov 200801,14155.496.86$7,828
Oct 200801,30075.246.92$8,999
Sep 200801,606101.767.88$12,651
Aug 20080934114.228.48$7,923
Jul 200801,777131.0811.39$20,239
Jun 20081286131.3313.03$3,859
May 20081372123.1711.57$4,429
Apr 20082375110.3110.45$4,141
Mar 20080356101.909.66$3,440
Feb 2008037092.538.77$3,245
Jan 2008348590.388.21$4,251
Dec 2007047688.337.30$3,476
Nov 2007453891.677.29$4,290
Oct 2007059882.856.92$4,139
Sep 2007574075.846.24$5,000
Aug 2007091869.066.39$5,864
Jul 2007588670.906.39$6,014
Jun 2007494562.007.55$7,381
May 2007078958.747.85$6,191
Apr 2007182459.617.81$6,491
Mar 2007087156.927.30$6,360
Feb 2007091755.108.22$7,534
Jan 200701,01150.306.73$6,801
Dec 200601,20056.656.92$8,302
Nov 2006055254.207.62$4,205
Oct 2006033554.906.01$2,015
Sep 2006042660.085.04$2,146
Aug 2006036768.717.34$2,694
Jul 2006051369.376.34$3,254
Jun 2006053666.286.38$3,422
May 2006059166.016.42$3,797
Apr 2006056864.397.36$4,181
Mar 2006057556.707.08$4,073
Feb 2006053157.597.75$4,116
Jan 2006059060.598.93$5,271
Dec 2005072854.9413.42$9,766
Nov 2005072554.6910.59$7,677
Oct 2005082658.3413.80$11,395
Sep 2005078961.4512.08$9,530
Aug 2005069661.519.80$6,819
Jul 2005077955.697.84$6,110
Jun 2005082152.337.38$6,060
May 2005088745.226.65$5,900
Apr 2005090149.207.36$6,632
Mar 2005087950.377.15$6,289
Feb 2005080645.226.31$5,087
Jan 2005076343.166.32$4,824
Dec 2004085139.866.75$5,745
Nov 2004084045.286.33$5,318
Oct 2004086149.706.52$5,610
Sep 2004078443.245.28$4,143
Aug 2004079542.375.55$4,413
Jul 2004081138.286.08$4,934
Jun 2004099136.106.43$6,375
May 200401,01337.486.49$6,579
Apr 2004099634.475.86$5,835
Mar 2004091734.365.53$5,071
Feb 2004093832.455.51$5,168
Jan 200401,15432.036.30$7,270
Dec 200301,24730.266.30$7,858
Nov 200301,50928.804.60$6,934
Oct 200301,51428.174.76$7,206
Sep 200301,46326.314.75$6,948
Aug 200301,56729.765.13$8,038
Jul 200302,16429.415.17$11,190
Jun 200302,57228.565.98$15,388
May 2003013526.595.97$806
Apr 200303226.675.41$173
Mar 2003238331.146.10$2,397
Feb 2003085233.487.93$6,753
Jan 200341,00630.315.58$5,737
Dec 200201,47726.914.85$7,169
Nov 2002089624.664.14$3,707
Oct 200241,03226.464.23$4,470
Sep 200241,03927.443.64$3,887
Aug 2002581725.963.16$2,715
Jul 200241,38224.583.06$4,330
Jun 2002391323.733.34$3,119
May 200231,04624.663.58$3,823
Apr 2002489123.653.51$3,224
Mar 200241,41122.003.10$4,466
Feb 200251,12518.222.38$2,764
Jan 2002121,94017.172.38$4,815
Dec 200171,78116.932.36$4,330
Nov 200182,28618.072.41$5,644
Oct 2001112,85819.782.53$7,445
Sep 2001143,96224.262.25$9,259
Aug 200106,04024.873.05$18,441
Jul 200124,81523.933.20$15,442

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 68.99 =         $0
Gas                    1 Mcf  × $  3.12 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/188805 is the state's own key, not one this site invented.