MECKEL "A"

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 190256District 7CField 846465002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Mar 2002 – May 2026
Value, last 12 filed months
$125
at the published price for each month
Months reported
291
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-09-27148266
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition69 bbl$6,560
GasProduction273,257 Mcf$1,253,227
Total$1,259,787

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6418, -100.6997. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.64176, -100.69970 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,600 ft.

Completions filed
Mar 2002
1 of 1 wells

1 well

42-43535778286,600 ftMar 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (291)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

291 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250156.664.41$4
Nov 20250258.593.93$8
Oct 20250459.383.30$13
Sep 20250362.743.08$9
Aug 20250563.933.01$15
Jul 202501666.743.32$53
Jun 20250766.483.13$22
May 20250460.553.23$13
Apr 20250262.363.54$7
Mar 20250267.704.27$9
Feb 20250470.884.34$17
Jan 20250374.324.28$13
Dec 20240468.993.12$12
Nov 20240469.052.20$9
Oct 20240271.372.28$5
Sep 20240169.612.36$2
Aug 20240175.632.06$2
Jul 20240179.932.15$2
Jun 20240178.082.63$3
May 20240178.812.20$2
Apr 20240284.451.66$3
Mar 20240280.301.55$3
Feb 20240476.091.78$7
Jan 20240273.023.30$7
Dec 20230471.262.61$10
Nov 20230477.892.81$11
Oct 20230885.443.09$25
Sep 20230989.042.74$25
Aug 20230980.522.67$24
Jul 202301174.852.64$29
Jun 202301468.962.26$32
May 202301670.622.23$36
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220594.529.13$46
Jul 2022015101.587.54$113
Jun 2022014115.097.98$112
May 2022015109.378.43$127
Apr 2022014104.226.84$96
Mar 2022015108.885.08$76
Feb 202201491.054.86$68
Jan 202201481.844.54$64
Dec 202101571.323.90$58
Nov 202101577.435.24$79
Oct 202101579.795.71$86
Sep 202101469.865.35$75
Aug 202101566.024.22$63
Jul 202101570.783.98$60
Jun 202101569.493.38$51
May 202101563.483.02$45
Apr 202101560.362.76$41
Mar 202101561.302.72$41
Feb 202101357.805.55$72
Jan 202101450.412.81$39
Dec 202001244.642.68$32
Nov 202001238.772.71$32
Oct 202001236.972.48$30
Sep 202001237.091.99$24
Aug 202001339.982.39$31
Jul 202001338.371.83$24
Jun 202001334.901.69$22
May 202001216.921.81$22
Apr 202001214.751.80$22
Mar 202001230.341.86$22
Feb 202001149.881.98$22
Jan 202001357.252.09$27
Dec 201901359.012.30$30
Nov 201901255.302.75$33
Oct 201901353.472.42$31
Sep 201901555.052.66$40
Aug 201902753.112.30$62
Jul 20190756.272.46$17
Jun 201901152.782.49$27
May 201901258.482.74$33
Apr 201901362.632.75$36
Mar 201901456.803.06$43
Feb 201901250.852.79$34
Jan 201901346.033.23$42
Dec 201801246.594.19$50
Nov 201801252.934.24$51
Oct 201801361.443.40$44
Sep 201801359.543.11$40
Aug 201801359.403.07$40
Jul 201801465.142.93$41
Jun 201801460.183.08$43
May 201801465.382.90$41
Apr 201801363.842.90$38
Mar 201801461.222.79$39
Feb 201801361.782.77$36
Jan 201801562.874.01$60
Dec 201701557.272.92$44
Nov 201701655.423.12$50
Oct 201701749.292.98$51
Sep 201701647.523.09$49
Aug 201701545.373.00$45
Jul 201701643.873.09$49
Jun 201701542.493.09$46
May 201701545.373.26$49
Apr 201701647.933.21$51
Mar 201701746.772.98$51
Feb 201701350.452.95$38
Jan 201701449.413.42$48
Dec 201601548.763.72$56
Nov 201601442.492.64$37
Oct 201601646.193.09$49
Sep 201601641.553.10$50
Aug 201601841.442.92$53
Jul 201601941.622.92$56
Jun 201601945.352.69$51
May 201602042.521.99$40
Apr 201601836.561.99$36
Mar 201601933.011.79$34
Feb 201601926.472.06$39
Jan 201602027.352.36$47
Dec 201502132.362.00$42
Nov 201502038.792.17$43
Oct 201502143.552.43$51
Sep 201501842.992.76$50
Aug 201502040.162.87$57
Jul 201502048.152.95$59
Jun 201502056.152.88$58
May 201502455.212.96$71
Apr 201502349.822.71$62
Mar 201502642.892.93$76
Feb 201501844.662.98$54
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 201401570.464.25$64
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 201402596.564.18$104
Jun 201402498.164.74$114
May 201405794.734.73$269
Apr 2014010895.944.81$519
Mar 2014026495.895.06$1,335
Feb 2014034797.406.19$2,149
Jan 2014044590.404.86$2,163
Dec 2013043991.824.35$1,912
Nov 2013034988.853.74$1,305
Oct 2013021197.423.78$797
Sep 2013074104.113.72$275
Aug 2013033104.253.52$116
Jul 2013046102.523.72$171
Jun 201303194.403.93$122
May 201304894.834.15$199
Apr 201305993.964.28$253
Mar 2013010993.623.91$427
Feb 2013015791.233.42$537
Jan 2013028991.603.42$988
Dec 2012022286.773.42$759
Nov 2012014486.953.62$522
Oct 2012016489.383.40$558
Sep 201205894.672.92$169
Aug 201203492.662.91$99
Jul 201203185.133.02$94
Jun 201202979.822.52$73
May 201203791.612.49$92
Apr 2012068101.652.00$136
Mar 20120153105.052.22$340
Feb 20120292101.102.57$751
Jan 2012035198.092.73$960
Dec 2011038596.873.24$1,247
Nov 2011019095.723.31$629
Oct 201105084.983.65$182
Sep 201103083.623.99$120
Aug 201102783.404.15$112
Jul 201102994.144.52$131
Jun 201102992.904.64$135
May 201104198.134.40$181
Apr 2011056105.964.33$243
Mar 201106496.364.06$260
Feb 2011023985.644.18$999
Jan 2011026186.504.59$1,198
Dec 2010027685.734.35$1,200
Nov 2010032280.843.80$1,222
Oct 2010020778.103.51$726
Sep 201007772.633.98$306
Aug 201004373.684.42$190
Jul 201004472.554.74$208
Jun 201004870.364.91$236
May 201007171.124.24$301
Apr 2010010381.694.12$425
Mar 2010028278.394.39$1,238
Feb 2010038273.585.44$2,079
Jan 2010044774.365.96$2,666
Dec 2009049371.445.48$2,703
Nov 2009028374.593.75$1,062
Oct 2009016472.544.11$674
Sep 200905765.543.06$175
Aug 200906467.423.22$206
Jul 200906461.133.46$222
Jun 200906366.163.90$245
May 200907454.743.93$291
Apr 2009014246.773.59$509
Mar 2009015342.144.06$621
Feb 2009014632.814.63$676
Jan 2009028435.865.37$1,525
Dec 20081448337.105.98$3,406
Nov 2008037755.496.86$2,586
Oct 20081725575.246.92$3,044
Sep 20080172101.767.88$1,355
Aug 200813131114.228.48$2,596
Jul 200825136131.0811.39$4,826
Jun 20080120131.3313.03$1,564
May 20080175123.1711.57$2,026
Apr 20080301110.3110.45$3,147
Mar 20080261101.909.66$2,522
Feb 2008022692.538.77$1,982
Jan 2008037190.388.21$3,044
Dec 2007039388.337.30$2,870
Nov 2007039391.677.29$2,866
Oct 2007029282.856.92$2,021
Sep 2007018075.846.24$1,124
Aug 2007018769.066.39$1,195
Jul 2007018970.906.39$1,207
Jun 2007019062.007.55$1,434
May 2007022358.747.85$1,750
Apr 2007033559.617.81$2,615
Mar 2007041756.927.30$3,045
Feb 2007062955.108.22$5,168
Jan 2007081850.306.73$5,503
Dec 2006076356.656.92$5,279
Nov 2006059754.207.62$4,548
Oct 2006048554.906.01$2,917
Sep 2006034960.085.04$1,758
Aug 2006031468.717.34$2,305
Jul 2006033069.376.34$2,093
Jun 2006034466.286.38$2,196
May 2006038966.016.42$2,499
Apr 2006040464.397.36$2,974
Mar 2006028156.707.08$1,990
Feb 200601,08857.597.75$8,433
Jan 200601,23560.598.93$11,033
Dec 200501,20954.9413.42$16,219
Nov 2005052054.6910.59$5,506
Oct 2005051158.3413.80$7,050
Sep 2005049361.4512.08$5,955
Aug 2005059861.519.80$5,859
Jul 2005073955.697.84$5,796
Jun 2005064852.337.38$4,783
May 2005070045.226.65$4,656
Apr 2005065449.207.36$4,814
Mar 2005074150.377.15$5,302
Feb 2005068045.226.31$4,292
Jan 200501,02543.166.32$6,480
Dec 200401,57439.866.75$10,626
Nov 2004092845.286.33$5,875
Oct 200401,29349.706.52$8,424
Sep 200401,58543.245.28$8,375
Aug 200401,49042.375.55$8,270
Jul 2004088738.286.08$5,397
Jun 200401,09936.106.43$7,070
May 200401,27637.486.49$8,287
Apr 200401,50134.475.86$8,794
Mar 200401,78234.365.53$9,855
Feb 200401,44632.455.51$7,967
Jan 200402,38232.036.30$15,006
Dec 200302,62230.266.30$16,523
Nov 200302,84328.804.60$13,064
Oct 200303,37528.174.76$16,064
Sep 200303,97926.314.75$18,898
Aug 200305,74229.765.13$29,455
Jul 200303,90129.415.17$20,171
Jun 200304,05528.565.98$24,261
May 2003029526.595.97$1,762
Apr 200306,65026.675.41$35,958
Mar 200307,65931.146.10$46,690
Feb 200307,81133.487.93$61,909
Jan 200308,90130.315.58$49,686
Dec 2002010,41526.914.85$50,552
Nov 2002011,01724.664.14$45,577
Oct 2002014,28826.464.23$60,426
Sep 2002012,91927.443.64$46,963
Aug 2002013,39825.963.16$42,393
Jul 2002012,57024.583.06$38,486
Jun 2002015,88923.733.34$53,041
May 2002019,54924.663.58$70,064
Apr 2002026,44423.653.51$92,880
Mar 2002027,40522.003.10$85,030

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 56.66 =         $0
Gas                    1 Mcf  × $  4.41 =         $4

────────────────────────────────────────────────────
Month total                                       $4

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/190256 is the state's own key, not one this site invented.