SHURLEY 95

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 190265District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$144 k
Nov 2001 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
295
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-09-27148618
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition64 bbl$2,500
GasProduction35,046 Mcf$141,347
Total$143,847

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5171, -100.6570. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.51705, -100.65705 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,350 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,350 ft.

Completions filed
Nov 2001
1 of 1 wells

1 well

42-43535610106,350 ftNov 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (295)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

295 months

May 2026019106.413.05$58
Apr 202602698.932.87$75
Mar 202602789.753.15$85
Feb 202602363.503.75$86
Jan 202602359.138.00$184
Dec 202502556.664.41$110
Nov 202502158.593.93$82
Oct 202502259.383.30$73
Sep 202502362.743.08$71
Aug 202502863.933.01$84
Jul 202504066.743.32$133
Jun 202503866.483.13$119
May 202503560.553.23$113
Apr 202502062.363.54$71
Mar 202501967.704.27$81
Feb 202503370.884.34$143
Jan 202503774.324.28$158
Dec 202403968.993.12$122
Nov 202403969.052.20$86
Oct 202404271.372.28$96
Sep 202404669.612.36$109
Aug 202402375.632.06$47
Jul 202404079.932.15$86
Jun 202404878.082.63$126
May 202404878.812.20$106
Apr 202401384.451.66$22
Mar 20240080.301.55$0
Feb 20240376.091.78$5
Jan 202403373.023.30$109
Dec 202304671.262.61$120
Nov 202302577.892.81$70
Oct 202302485.443.09$74
Sep 202302589.042.74$68
Aug 202301780.522.67$45
Jul 202302474.852.64$63
Jun 202301768.962.26$38
May 202303670.622.23$80
Apr 202302978.122.24$65
Mar 202303272.852.39$77
Feb 202303875.112.47$94
Jan 202301076.533.39$34
Dec 202204576.415.73$258
Nov 202204585.005.65$254
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202209109.378.43$76
Apr 2022115104.226.84$207
Mar 2022018108.885.08$91
Feb 202201491.054.86$68
Jan 202201681.844.54$73
Dec 202112071.323.90$149
Nov 202101577.435.24$79
Oct 20210879.795.71$46
Sep 20210869.865.35$43
Aug 20210866.024.22$34
Jul 202101570.783.98$60
Jun 202102869.493.38$95
May 202102163.483.02$63
Apr 202101560.362.76$41
Mar 202101261.302.72$33
Feb 202101357.805.55$72
Jan 20210750.412.81$20
Dec 202001444.642.68$37
Nov 202001938.772.71$51
Oct 202001436.972.48$35
Sep 202001137.091.99$22
Aug 202002039.982.39$48
Jul 202003738.371.83$68
Jun 202002934.901.69$49
May 202007116.921.81$129
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 202001257.252.09$25
Dec 201905759.012.30$131
Nov 201905555.302.75$151
Oct 201906153.472.42$148
Sep 201906655.052.66$175
Aug 201906553.112.30$150
Jul 201906356.272.46$155
Jun 201905952.782.49$147
May 201906158.482.74$167
Apr 201905662.632.75$154
Mar 201906056.803.06$184
Feb 201905250.852.79$145
Jan 201906046.033.23$194
Dec 201806746.594.19$280
Nov 201805852.934.24$246
Oct 201806361.443.40$214
Sep 201805359.543.11$165
Aug 201806259.403.07$190
Jul 201806065.142.93$176
Jun 201806060.183.08$185
May 201806065.382.90$174
Apr 201825763.842.90$293
Mar 201805661.222.79$156
Feb 201804561.782.77$124
Jan 201845562.874.01$472
Dec 201705357.272.92$155
Nov 201705755.423.12$178
Oct 201706149.292.98$182
Sep 201706347.523.09$195
Aug 201706745.373.00$201
Jul 201706743.873.09$207
Jun 2017116642.493.09$671
May 201706545.373.26$212
Apr 201706447.933.21$206
Mar 201706646.772.98$197
Feb 201716050.452.95$228
Jan 201706149.413.42$209
Dec 201605948.763.72$220
Nov 201606342.492.64$167
Oct 201697046.193.09$632
Sep 201606541.553.10$202
Aug 201606441.442.92$187
Jul 201607341.622.92$213
Jun 201677545.352.69$519
May 201607842.521.99$155
Apr 201607636.561.99$151
Mar 201607633.011.79$136
Feb 201607526.472.06$155
Jan 2016117727.352.36$483
Dec 201507132.362.00$142
Nov 201506638.792.17$143
Oct 201505843.552.43$141
Sep 201507342.992.76$201
Aug 201527540.162.87$296
Jul 201508348.152.95$244
Jun 201508056.152.88$231
May 201508355.212.96$245
Apr 201507749.822.71$208
Mar 201507842.892.93$229
Feb 201506444.662.98$190
Jan 201507943.433.10$245
Dec 201407554.693.59$269
Nov 201407470.464.25$315
Oct 201407978.303.90$308
Sep 201407886.164.05$316
Aug 201409089.394.04$363
Jul 201409396.564.18$389
Jun 201409398.164.74$441
May 201409394.734.73$440
Apr 201409195.944.81$438
Mar 201407895.895.06$394
Feb 201408297.406.19$508
Jan 201409390.404.86$452
Dec 201309991.824.35$431
Nov 2013010588.853.74$393
Oct 2013010497.423.78$393
Sep 20130104104.113.72$387
Aug 20130113104.253.52$398
Jul 20130113102.523.72$420
Jun 2013011494.403.93$448
May 2013012694.834.15$523
Apr 2013012193.964.28$518
Mar 2013012293.623.91$477
Feb 2013011791.233.42$400
Jan 2013013391.603.42$455
Dec 2012014186.773.42$482
Nov 2012014886.953.62$536
Oct 2012016089.383.40$544
Sep 2012016694.672.92$484
Aug 2012018592.662.91$538
Jul 2012019285.133.02$580
Jun 2012019379.822.52$486
May 2012019691.612.49$488
Apr 20120196101.652.00$391
Mar 20120216105.052.22$480
Feb 20120207101.102.57$532
Jan 2012025198.092.73$686
Dec 2011027696.873.24$894
Nov 2011029395.723.31$970
Oct 2011025084.983.65$912
Sep 2011027883.623.99$1,108
Aug 2011028883.404.15$1,195
Jul 2011029694.144.52$1,337
Jun 2011028792.904.64$1,332
May 2011029998.134.40$1,317
Apr 20110294105.964.33$1,274
Mar 2011028896.364.06$1,169
Feb 2011029485.644.18$1,229
Jan 2011031286.504.59$1,432
Dec 2010030785.734.35$1,335
Nov 2010030280.843.80$1,146
Oct 2010031478.103.51$1,102
Sep 2010031872.633.98$1,265
Aug 2010034373.684.42$1,516
Jul 2010034572.554.74$1,634
Jun 2010033870.364.91$1,660
May 2010025171.124.24$1,063
Apr 2010025681.694.12$1,055
Mar 2010031978.394.39$1,400
Feb 2010024373.585.44$1,322
Jan 2010033474.365.96$1,992
Dec 2009031571.445.48$1,727
Nov 2009045674.593.75$1,711
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009046267.423.22$1,487
Jul 2009055161.133.46$1,909
Jun 2009074666.163.90$2,906
May 2009044154.743.93$1,731
Apr 2009040946.773.59$1,467
Mar 2009031942.144.06$1,295
Feb 200902932.814.63$134
Jan 200903635.865.37$193
Dec 200807337.105.98$436
Nov 200806555.496.86$446
Oct 200807175.246.92$491
Sep 2008067101.767.88$528
Aug 2008067114.228.48$568
Jul 2008060131.0811.39$683
Jun 2008057131.3313.03$743
May 2008062123.1711.57$718
Apr 2008059110.3110.45$617
Mar 2008063101.909.66$609
Feb 200806492.538.77$561
Jan 200806590.388.21$533
Dec 200706988.337.30$504
Nov 200706991.677.29$503
Oct 2007010082.856.92$692
Sep 200707975.846.24$493
Aug 200709269.066.39$588
Jul 2007010970.906.39$696
Jun 2007010562.007.55$793
May 200707658.747.85$596
Apr 200706659.617.81$515
Mar 200706556.927.30$475
Feb 200706055.108.22$493
Jan 200706650.306.73$444
Dec 200609956.656.92$685
Nov 2006016454.207.62$1,249
Oct 2006016854.906.01$1,010
Sep 2006016260.085.04$816
Aug 2006021268.717.34$1,556
Jul 2006024769.376.34$1,567
Jun 2006022766.286.38$1,449
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 200503854.6910.59$402
Oct 200506658.3413.80$911
Sep 200506461.4512.08$773
Aug 200506661.519.80$647
Jul 200506555.697.84$510
Jun 200506452.337.38$472
May 200506745.226.65$446
Apr 200506649.207.36$486
Mar 200506950.377.15$494
Feb 200507545.226.31$473
Jan 200507243.166.32$455
Dec 200407839.866.75$527
Nov 200406945.286.33$437
Oct 200406749.706.52$437
Sep 200406743.245.28$354
Aug 200406642.375.55$366
Jul 200406538.286.08$395
Jun 200407136.106.43$457
May 200406337.486.49$409
Apr 200406334.475.86$369
Mar 200406634.365.53$365
Feb 200406132.455.51$336
Jan 200406432.036.30$403
Dec 200306530.266.30$410
Nov 200306528.804.60$299
Oct 200306928.174.76$328
Sep 200309026.314.75$427
Aug 2003013129.765.13$672
Jul 2003013529.415.17$698
Jun 2003012828.565.98$766
May 2003013626.595.97$812
Apr 2003014826.675.41$800
Mar 2003032131.146.10$1,957
Feb 2003013233.487.93$1,046
Jan 2003018730.315.58$1,044
Dec 2002123826.914.85$1,182
Nov 2002123524.664.14$997
Oct 2002125626.464.23$1,109
Sep 2002123827.443.64$893
Aug 2002129025.963.16$944
Jul 2002125524.583.06$805
Jun 2002020923.733.34$698
May 200201024.663.58$36
Apr 200209123.653.51$320
Mar 2002016622.003.10$515
Feb 200219618.222.38$246
Jan 200221,03917.172.38$2,503
Dec 200132,53616.932.36$6,047
Nov 200132,11618.072.41$5,144

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   19 Mcf  × $  3.05 =        $58

────────────────────────────────────────────────────
Month total                                      $58

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/190265 is the state's own key, not one this site invented.