SHANNON ESTATE

Operated by W. W. PROPERTIES (P-5 888058) in the NOELKE, NE. (QUEEN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 19062District 7CField 65677500CondensateGasSaveExport
Value, all time
$1 k
Jan 1993 – Mar 2015
Value, last 12 filed months
$47
at the published price for each month
Months reported
267
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 35 leases and 35 wells, and the rule below applies to all of them.

Discovered
1943-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
2,640 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 320 acres.

The Commission's schedule remark for this field reads: EFFECTIVE 11/01/82

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7 bbl$143
GasProduction224 Mcf$1,050
Total$1,193

5 Mcf of this lease's gas, across 5 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.8532, -101.7726. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.85316, -101.77258 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
2,504 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,504 ft.

Plug dates filed
Mar 2015
1 of 1 wells

1 well

42-1050122812,504 ftMar 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (267)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

267 months

Mar 20150142.892.93$3
Feb 20150144.662.98$3
Jan 20150143.433.10$3
Dec 20140154.693.59$4
Nov 20140170.464.25$4
Oct 20140178.303.90$4
Sep 20140186.164.05$4
Aug 20140189.394.04$4
Jul 20140196.564.18$4
Jun 20140198.164.74$5
May 20140194.734.73$5
Apr 20140195.944.81$5
Mar 20140195.895.06$5
Feb 20140197.406.19$6
Jan 20140190.404.86$5
Dec 20130191.824.35$4
Nov 20130188.853.74$4
Oct 20130197.423.78$4
Sep 201301104.113.72$4
Aug 201301104.253.52$4
Jul 201301102.523.72$4
Jun 20130194.403.93$4
May 20130194.834.15$4
Apr 20130193.964.28$4
Mar 20130193.623.91$4
Feb 20130191.233.42$3
Jan 20130191.603.42$3
Dec 20120186.773.42$3
Nov 20120186.953.62$4
Oct 20120189.383.40$3
Sep 20120194.672.92$3
Aug 20120192.662.91$3
Jul 20120185.133.02$3
Jun 20120179.822.52$3
May 20120191.612.49$2
Apr 201201101.652.00$2
Mar 201201105.052.22$2
Feb 201201101.102.57$3
Jan 20120198.092.73$3
Dec 20110196.873.24$3
Nov 20110195.723.31$3
Oct 20110184.983.65$4
Sep 20110183.623.99$4
Aug 20110183.404.15$4
Jul 20110194.144.52$5
Jun 20110192.904.64$5
May 20110198.134.40$4
Apr 201101105.964.33$4
Mar 20110196.364.06$4
Feb 20110185.644.18$4
Jan 20110186.504.59$5
Dec 20100185.734.35$4
Nov 20100180.843.80$4
Oct 20100178.103.51$4
Sep 20100172.633.98$4
Aug 20100173.684.42$4
Jul 20100172.554.74$5
Jun 20100170.364.91$5
May 20100171.124.24$4
Apr 20100181.694.12$4
Mar 20100178.394.39$4
Feb 20100173.585.44$5
Jan 20100174.365.96$6
Dec 20090171.445.48$5
Nov 20090174.593.75$4
Oct 20090172.544.11$4
Sep 20090165.543.06$3
Aug 20090167.423.22$3
Jul 20090161.133.46$3
Jun 20090166.163.90$4
May 20090154.743.93$4
Apr 20090146.773.59$4
Mar 20090142.144.06$4
Feb 20090132.814.63$5
Jan 20090135.865.37$5
Dec 20080137.105.98$6
Nov 20080155.496.86$7
Oct 20080175.246.92$7
Sep 200801101.767.88$8
Aug 200801114.228.48$8
Jul 200801131.0811.39$11
Jun 200801131.3313.03$13
May 200801123.1711.57$12
Apr 200801110.3110.45$10
Mar 200801101.909.66$10
Feb 20080192.538.77$9
Jan 20080190.388.21$8
Dec 20070188.337.30$7
Nov 20070191.677.29$7
Oct 20070182.856.92$7
Sep 20070175.846.24$6
Aug 20070169.066.39$6
Jul 20070170.906.39$6
Jun 20070162.007.55$8
May 20070158.747.85$8
Apr 20070159.617.81$8
Mar 20070156.927.30$7
Feb 20070155.108.22$8
Jan 20070150.306.73$7
Dec 20060156.656.92$7
Nov 20060154.207.62$8
Oct 20060154.906.01$6
Sep 20060160.085.04$5
Aug 20060168.717.34$7
Jul 20060169.376.34$6
Jun 20060166.286.38$6
May 20060166.016.42$6
Apr 20060164.397.36$7
Mar 20060156.707.08$7
Feb 20060157.597.75$8
Jan 20060160.598.93$9
Dec 20050154.9413.42$13
Nov 20050154.6910.59$11
Oct 20050158.3413.80$14
Sep 20050161.4512.08$12
Aug 20050161.519.80$10
Jul 20050155.697.84$8
Jun 20050152.337.38$7
May 20050145.226.65$7
Apr 20050149.207.36$7
Mar 20050150.377.15$7
Feb 20050145.226.31$6
Jan 20050143.166.32$6
Dec 20040139.866.75$7
Nov 20040145.286.33$6
Oct 20040149.706.52$7
Sep 20040143.245.28$5
Aug 20040142.375.55$6
Jul 20040138.286.08$6
Jun 20040136.106.43$6
May 20040137.486.49$6
Apr 20040134.475.86$6
Mar 20040134.365.53$6
Feb 20040132.455.51$6
Jan 20040132.036.30$6
Dec 20030130.266.30$6
Nov 20030128.804.60$5
Oct 20030128.174.76$5
Sep 20030126.314.75$5
Aug 20030129.765.13$5
Jul 20030129.415.17$5
Jun 20030128.565.98$6
May 20030126.595.97$6
Apr 20030126.675.41$5
Mar 20030131.146.10$6
Feb 20030133.487.93$8
Jan 20030130.315.58$6
Dec 20020126.914.85$5
Nov 20020124.664.14$4
Oct 20020126.464.23$4
Sep 20020127.443.64$4
Aug 20020125.963.16$3
Jul 20020124.583.06$3
Jun 20020123.733.34$3
May 20020124.663.58$4
Apr 20020123.653.51$4
Mar 20020122.003.10$3
Feb 20020118.222.38$2
Jan 20020117.172.38$2
Dec 20010116.932.36$2
Nov 20010118.072.41$2
Oct 20010119.782.53$3
Sep 20010124.262.25$2
Aug 20010124.873.05$3
Jul 20010123.933.20$3
Jun 20010124.563.82$4
May 20010125.524.31$4
Apr 20010124.685.34$5
Mar 20010124.545.38$5
Feb 20010127.755.77$6
Jan 20010127.478.40$8
Dec 20000126.889.12$9
Nov 20000132.215.66$6
Oct 20000131.235.15$5
Sep 20000131.875.19$5
Aug 20000129.644.54$5
Jul 20000128.534.09$4
Jun 20000129.304.40$4
May 20000127.263.68$4
Apr 20000124.513.12$3
Mar 20000128.422.86$3
Feb 20000127.622.73$3
Jan 20000125.272.48$2
Dec 19990124.282.42$2
Nov 19990123.192.43$2
Oct 19990120.982.80$3
Sep 19990121.752.62$3
Aug 19990119.262.88$3
Jul 19990117.892.37$2
Jun 19990115.942.36$2
May 19990115.792.32$2
Apr 19990115.102.21$2
Mar 19990112.471.84$2
Feb 1999019.981.82$2
Jan 19990110.381.90$2
Dec 1998019.201.77$2
Nov 19980110.892.19$2
Oct 19980112.421.97$2
Sep 19980112.592.08$2
Aug 19980111.301.91$2
Jul 19980111.742.24$2
Jun 19980111.242.24$2
May 19980112.622.21$2
Apr 19980113.042.51$3
Mar 19980112.802.31$2
Feb 19980113.952.30$2
Jan 19980114.702.15$2
Dec 19970116.322.41$2
Nov 19970118.193.09$3
Oct 19970119.253.15$3
Sep 19970117.742.95$3
Aug 19970117.862.55$3
Jul 19970117.582.25$2
Jun 19970117.242.26$2
May 19970118.972.31$2
Apr 19970117.882.08$2
Mar 19970118.951.94$2
Feb 19977120.492.21$146
Jan 19970123.483.54$4
Dec 19960123.32$0
Nov 19960121.97$0
Oct 19960123.31$0
Sep 19960122.22$0
Aug 19960120.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 19950017.56$0
Apr 19950017.73$0
Mar 19950016.44$0
Feb 19950016.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 19940015.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940017.56$0
Jun 19940017.09$0
May 19940015.88$0
Apr 19940014.14$0
Mar 19940012.46$0
Feb 19940012.50$0
Jan 19940012.66$0
Dec 19930012.33$0
Nov 19930014.49$0
Oct 19930015.85$0
Sep 19930015.03$0
Aug 19930015.66$0
Jul 19930015.46$0
Jun 19930016.79$0
May 19930017.68$0
Apr 19930018.05$0
Mar 19930018.14$0
Feb 19930017.90$0
Jan 19930016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2015 — as filed, then multipliedworked
Condensate             0 bbl  × $ 42.89 =         $0
Gas                    1 Mcf  × $  2.93 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/19062 is the state's own key, not one this site invented.