DAVIES, H. C.

Operated by SM ENERGY COMPANY (P-5 788997) in the DAVIS (PENNSYLVANIAN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 190706District 7CField 23380700CondensateGasSaveExport
Value, all time
$935 k
Apr 2002 – Jan 2017
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
178
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 18 leases and 20 wells, and the rule below applies to all of them.

Discovered
1952-02-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-01-13.

The Commission's schedule remark for this field reads: RESERVOIR.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,645 bbl$239,610
GasProduction103,029 Mcf$694,912
Total$934,522

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.5596, -102.1881. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.55955, -102.18806 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
13,213 ft
1 wells filed one
Completion to plug
1 month
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,213 ft.

Completions filed
Dec 2016
1 of 1 wells
Plug dates filed
Jan 2017
1 of 1 wells

Last completion to plug: a median of 1 month across the 1 well that filed both dates, with the middle half between 1 month and 1 month. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-46102978113,213 ftDec 2016Jan 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (178)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

178 months

Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 201698033.011.79$3,235
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201101105.964.33$4
Mar 20110896.364.06$32
Feb 2011024285.644.18$1,012
Jan 2011075786.504.59$3,474
Dec 2010130785.734.35$1,420
Nov 201006280.843.80$235
Oct 2010067478.103.51$2,365
Sep 2010040472.633.98$1,608
Aug 201003173.684.42$137
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 2010038773.585.44$2,106
Jan 201001,29774.365.96$7,735
Dec 200901,19171.445.48$6,531
Nov 2009054474.593.75$2,041
Oct 200903072.544.11$123
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 2009099066.163.90$3,856
May 200901,76054.743.93$6,909
Apr 200901,55746.773.59$5,586
Mar 2009049642.144.06$2,013
Feb 2009229132.814.63$1,414
Jan 200941,02435.865.37$5,643
Dec 2008360937.105.98$3,751
Nov 2008078655.496.86$5,392
Oct 200819690875.246.92$21,032
Sep 20080657101.767.88$5,175
Aug 2008198966114.228.48$30,810
Jul 20080884131.0811.39$10,068
Jun 20080914131.3313.03$11,912
May 20080959123.1711.57$11,100
Apr 20080944110.3110.45$9,869
Mar 200801,041101.909.66$10,060
Feb 20081791,00392.538.77$25,360
Jan 200801,22990.388.21$10,085
Dec 200701,05888.337.30$7,725
Nov 200701,23091.677.29$8,969
Oct 20071761,27482.856.92$23,400
Sep 200701,13175.846.24$7,062
Aug 200701,09669.066.39$7,001
Jul 200701,11470.906.39$7,116
Jun 200701,07662.007.55$8,122
May 200701,17858.747.85$9,243
Apr 20071801,75759.617.81$24,444
Mar 20071814,95356.927.30$46,469
Feb 200703,96955.108.22$32,609
Jan 20071832,12150.306.73$23,473
Dec 200601,11256.656.92$7,693
Nov 200601,09454.207.62$8,334
Oct 200601,12054.906.01$6,735
Sep 200601,08660.085.04$5,470
Aug 20061781,18068.717.34$20,891
Jul 200601,16469.376.34$7,383
Jun 20065471,15066.286.38$43,597
May 200611,04466.016.42$6,774
Apr 2006087164.397.36$6,411
Mar 2006091856.707.08$6,502
Feb 2006078757.597.75$6,100
Jan 2006097660.598.93$8,719
Dec 2005711,03954.9413.42$17,839
Nov 200501,04954.6910.59$11,107
Oct 2005083758.3413.80$11,547
Sep 200517491061.4512.08$21,684
Aug 200501,08261.519.80$10,600
Jul 20051701,03155.697.84$17,554
Jun 2005096052.337.38$7,086
May 2005088745.226.65$5,900
Apr 2005089749.207.36$6,602
Mar 200517792650.377.15$15,541
Feb 2005087045.226.31$5,491
Jan 2005092243.166.32$5,829
Dec 2004092439.866.75$6,238
Nov 2004090345.286.33$5,716
Oct 2004096249.706.52$6,268
Sep 2004091843.245.28$4,851
Aug 2004094742.375.55$5,256
Jul 2004091538.286.08$5,567
Jun 2004087836.106.43$5,648
May 2004095537.486.49$6,202
Apr 20041771,36134.475.86$14,075
Mar 200401,66834.365.53$9,224
Feb 20041822,32732.455.51$18,727
Jan 200403,21432.036.30$20,247
Dec 200301,90630.266.30$12,011
Nov 20031861,40928.804.60$11,831
Oct 200301,01528.174.76$4,831
Sep 2003034326.314.75$1,629
Aug 200317539829.765.13$7,250
Jul 2003081129.415.17$4,194
Jun 20035371,16728.565.98$22,319
May 20036691,14426.595.97$24,621
Apr 2003043326.675.41$2,341
Mar 2003049131.146.10$2,993
Feb 200301,30533.487.93$10,343
Jan 200301,97830.315.58$11,041
Dec 200205726.914.85$277
Nov 200202,30424.664.14$9,532
Oct 2002044926.464.23$1,899
Sep 2002034327.443.64$1,247
Aug 2002039825.963.16$1,259
Jul 2002047424.583.06$1,451
Jun 2002048623.733.34$1,622
May 2002055624.663.58$1,993
Apr 2002076823.653.51$2,697

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2016 — as filed, then multipliedworked
Condensate            98 bbl  × $ 33.01 =     $3,235
Gas                    0 Mcf  × $  1.79 =         $0

────────────────────────────────────────────────────
Month total                                   $3,235

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/190706 is the state's own key, not one this site invented.