FIELDS 19

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 191036District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$559 k
Apr 2002 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
290
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-11-26149453
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition150 bbl$7,685
GasProduction101,506 Mcf$550,822
Total$558,507

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5252, -100.6490. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52519, -100.64903 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,360 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,360 ft.

Completions filed
Apr 2002
1 of 1 wells

1 well

42-43535805176,360 ftApr 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (290)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

290 months

May 2026035106.413.05$107
Apr 202603598.932.87$100
Mar 202603789.753.15$117
Feb 202602863.503.75$105
Jan 202603159.138.00$248
Dec 202503456.664.41$150
Nov 202503758.593.93$145
Oct 202502659.383.30$86
Sep 202503362.743.08$102
Aug 202502663.933.01$78
Jul 202503666.743.32$119
Jun 202504066.483.13$125
May 202503660.553.23$116
Apr 202503362.363.54$117
Mar 202503767.704.27$158
Feb 202504070.884.34$174
Jan 202506074.324.28$257
Dec 202402468.993.12$75
Nov 202407469.052.20$163
Oct 202404071.372.28$91
Sep 202403769.612.36$87
Aug 202406875.632.06$140
Jul 202406779.932.15$144
Jun 202408478.082.63$221
May 202405878.812.20$128
Apr 202407084.451.66$116
Mar 202405780.301.55$88
Feb 202404076.091.78$71
Jan 202402773.023.30$89
Dec 202302071.262.61$52
Nov 202302877.892.81$79
Oct 202306085.443.09$185
Sep 202302989.042.74$79
Aug 202302680.522.67$69
Jul 202304774.852.64$124
Jun 202302868.962.26$63
May 202302570.622.23$56
Apr 202307178.122.24$159
Mar 202302672.852.39$62
Feb 202304675.112.47$113
Jan 202302276.533.39$75
Dec 202201976.415.73$109
Nov 202203185.005.65$175
Oct 202204287.185.86$246
Sep 202205584.888.16$449
Aug 202203694.529.13$329
Jul 2022025101.587.54$189
Jun 2022039115.097.98$311
May 2022063109.378.43$531
Apr 2022036104.226.84$246
Mar 2022037108.885.08$188
Feb 202204491.054.86$214
Jan 202203981.844.54$177
Dec 202104471.323.90$172
Nov 202106077.435.24$314
Oct 202104379.795.71$246
Sep 202107169.865.35$380
Aug 202109266.024.22$388
Jul 202104370.783.98$171
Jun 202107869.493.38$264
May 202107363.483.02$220
Apr 202102160.362.76$58
Mar 202106161.302.72$166
Feb 202106457.805.55$355
Jan 202108950.412.81$250
Dec 2020010944.642.68$292
Nov 202001838.772.71$49
Oct 2020014336.972.48$354
Sep 20200037.091.99$0
Aug 202004339.982.39$103
Jul 202006038.371.83$110
Jun 2020011634.901.69$196
May 202006916.921.81$125
Apr 202006514.751.80$117
Mar 20200030.341.86$0
Feb 202007749.881.98$153
Jan 202004357.252.09$90
Dec 201905559.012.30$127
Nov 20190555.302.75$14
Oct 201901253.472.42$29
Sep 201901055.052.66$27
Aug 20190953.112.30$21
Jul 20190956.272.46$22
Jun 20190852.782.49$20
May 20190758.482.74$19
Apr 20190762.632.75$19
Mar 20190556.803.06$15
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180646.594.19$25
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 201801565.382.90$44
Apr 201803463.842.90$99
Mar 2018011661.222.79$323
Feb 2018013361.782.77$368
Jan 201807962.874.01$317
Dec 20170057.272.92$0
Nov 201704455.423.12$137
Oct 201707649.292.98$227
Sep 20170047.523.09$0
Aug 20170445.373.00$12
Jul 201701143.873.09$34
Jun 20170242.493.09$6
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 201706646.772.98$197
Feb 201707350.452.95$216
Jan 201706349.413.42$215
Dec 201607548.763.72$279
Nov 201607242.492.64$190
Oct 201608546.193.09$263
Sep 201609341.553.10$288
Aug 201606441.442.92$187
Jul 201606941.622.92$202
Jun 201608945.352.69$239
May 201608342.521.99$165
Apr 2016013436.561.99$267
Mar 201607333.011.79$131
Feb 201604026.472.06$83
Jan 201609827.352.36$232
Dec 2015015832.362.00$316
Nov 2015019938.792.17$431
Oct 2015115843.552.43$427
Sep 2015017142.992.76$472
Aug 2015010540.162.87$302
Jul 20150248.152.95$6
Jun 201507256.152.88$208
May 2015014455.212.96$426
Apr 2015013149.822.71$355
Mar 20150042.892.93$0
Feb 201501444.662.98$42
Jan 201501743.433.10$53
Dec 201402254.693.59$79
Nov 20140770.464.25$30
Oct 201405078.303.90$195
Sep 2014012186.164.05$490
Aug 2014017189.394.04$690
Jul 2014020596.564.18$857
Jun 2014032698.164.74$1,544
May 2014068594.734.73$3,238
Apr 20140495.944.81$19
Mar 201401095.895.06$51
Feb 20140197.406.19$6
Jan 20140190.404.86$5
Dec 20130591.824.35$22
Nov 20130788.853.74$26
Oct 201301097.423.78$38
Sep 2013014104.113.72$52
Aug 2013019104.253.52$67
Jul 2013043102.523.72$160
Jun 201306694.403.93$260
May 201308094.834.15$332
Apr 201308693.964.28$368
Mar 201309293.623.91$360
Feb 201307091.233.42$239
Jan 201302291.603.42$75
Dec 201205886.773.42$198
Nov 201207486.953.62$268
Oct 2012011189.383.40$377
Sep 2012010394.672.92$301
Aug 2012027892.662.91$808
Jul 2012040685.133.02$1,226
Jun 2012039879.822.52$1,003
May 2012044591.612.49$1,107
Apr 20120451101.652.00$901
Mar 20120495105.052.22$1,100
Feb 20120461101.102.57$1,185
Jan 2012041598.092.73$1,135
Dec 2011031996.873.24$1,033
Nov 2011027995.723.31$924
Oct 2011034584.983.65$1,259
Sep 2011032083.623.99$1,275
Aug 2011036783.404.15$1,523
Jul 2011038194.144.52$1,721
Jun 2011037892.904.64$1,754
May 2011040498.134.40$1,780
Apr 20110397105.964.33$1,720
Mar 2011042896.364.06$1,737
Feb 2011034985.644.18$1,459
Jan 2011043386.504.59$1,987
Dec 2010043285.734.35$1,878
Nov 2010044480.843.80$1,685
Oct 2010050478.103.51$1,768
Sep 2010055672.633.98$2,213
Aug 2010062373.684.42$2,753
Jul 2010055872.554.74$2,643
Jun 2010057970.364.91$2,843
May 2010063371.124.24$2,681
Apr 2010065081.694.12$2,680
Mar 2010038278.394.39$1,676
Feb 201007773.585.44$419
Jan 2010010874.365.96$644
Dec 2009016171.445.48$883
Nov 200906774.593.75$251
Oct 2009012372.544.11$506
Sep 2009022965.543.06$702
Aug 2009041867.423.22$1,345
Jul 2009041561.133.46$1,438
Jun 2009038966.163.90$1,515
May 2009033754.743.93$1,323
Apr 2009037146.773.59$1,331
Mar 2009042442.144.06$1,721
Feb 2009038932.814.63$1,802
Jan 2009046835.865.37$2,514
Dec 2008041437.105.98$2,475
Nov 2008039755.496.86$2,724
Oct 2008040375.246.92$2,790
Sep 20080267101.767.88$2,103
Aug 20080388114.228.48$3,291
Jul 20080431131.0811.39$4,909
Jun 20083345131.3313.03$4,890
May 20081379123.1711.57$4,510
Apr 20084323110.3110.45$3,818
Mar 20081358101.909.66$3,562
Feb 2008133592.538.77$3,031
Jan 2008341490.388.21$3,668
Dec 2007339288.337.30$3,127
Nov 2007141191.677.29$3,089
Oct 2007137982.856.92$2,706
Sep 2007135675.846.24$2,299
Aug 2007130269.066.39$1,998
Jul 2007026970.906.39$1,718
Jun 2007118862.007.55$1,481
May 2007149958.747.85$3,974
Apr 2007119159.617.81$1,550
Mar 2007242056.927.30$3,181
Feb 2007256955.108.22$4,785
Jan 2007067850.306.73$4,561
Dec 2006266156.656.92$4,686
Nov 2006270854.207.62$5,502
Oct 2006273154.906.01$4,506
Sep 2006269460.085.04$3,616
Aug 2006272668.717.34$5,466
Jul 2006275869.376.34$4,947
Jun 2006367266.286.38$4,489
May 2006257366.016.42$3,814
Apr 2006588864.397.36$6,858
Mar 2006090056.707.08$6,375
Feb 2006281757.597.75$6,448
Jan 2006085860.598.93$7,665
Dec 2005285854.9413.42$11,620
Nov 2005582054.6910.59$8,956
Oct 2005088858.3413.80$12,251
Sep 2005284761.4512.08$10,354
Aug 2005379761.519.80$7,993
Jul 2005080955.697.84$6,346
Jun 2005390252.337.38$6,815
May 2005399745.226.65$6,767
Apr 200531,08849.207.36$8,156
Mar 200561,26450.377.15$9,346
Feb 200501,22545.226.31$7,732
Jan 200511,35943.166.32$8,635
Dec 200401,23339.866.75$8,324
Nov 200431,15645.286.33$7,454
Oct 200431,15849.706.52$7,694
Sep 200461,12043.245.28$6,177
Aug 200401,14542.375.55$6,356
Jul 200431,16138.286.08$7,179
Jun 200431,15336.106.43$7,526
May 200431,20337.486.49$7,925
Apr 200431,18434.475.86$7,040
Mar 2004037634.365.53$2,079
Feb 2004121232.455.51$1,200
Jan 2004259632.036.30$3,819
Dec 2003385630.266.30$5,485
Nov 2003286428.804.60$4,028
Oct 2003390328.174.76$4,382
Sep 2003182926.314.75$3,964
Aug 2003077629.765.13$3,981
Jul 2003166729.415.17$3,478
Jun 2003198128.565.98$5,898
May 2003184526.595.97$5,074
Apr 2003384126.675.41$4,628
Mar 2003190631.146.10$5,554
Feb 2003388033.487.93$7,075
Jan 200331,01530.315.58$5,757
Dec 2002390626.914.85$4,478
Nov 200231,28424.664.14$5,386
Oct 200231,56926.464.23$6,715
Sep 200221,74127.443.64$6,384
Aug 200222,18025.963.16$6,950
Jul 200201,96324.583.06$6,010
Jun 200262,89523.733.34$9,807
May 200204,43424.663.58$15,891
Apr 200226,35623.653.51$22,372

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   35 Mcf  × $  3.05 =       $107

────────────────────────────────────────────────────
Month total                                     $107

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/191036 is the state's own key, not one this site invented.