Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 191137District 7CField 679952002 tax incentive programmesGasSaveExport
Value, all time
$950 k
Jun 2002 – May 2026
Value, last 12 filed months
$21 k
at the published price for each month
Months reported
288
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-07-31193502
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction191,469 Mcf$949,792
Total$949,792

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5697, -101.2806. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.56973, -101.28060 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,586 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,586 ft.

Completions filed
Oct 2002
1 of 1 wells

1 well

42-105384746 C9,586 ftOct 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (288)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

288 months

May 2026466106.413.05$1,419
Apr 202642398.932.87$1,214
Mar 202638889.753.15$1,222
Feb 202641563.503.75$1,556
Jan 202644659.138.00$3,567
Dec 202546056.664.41$2,030
Nov 202547358.593.93$1,857
Oct 202537459.383.30$1,236
Sep 202547162.743.08$1,449
Aug 202559963.933.01$1,806
Jul 202559066.743.32$1,956
Jun 202550166.483.13$1,567
May 20254260.553.23$136
Apr 202548262.363.54$1,708
Mar 202550667.704.27$2,160
Feb 202542670.884.34$1,849
Jan 202552974.324.28$2,263
Dec 202452668.993.12$1,642
Nov 202452269.052.20$1,148
Oct 202462571.372.28$1,426
Sep 202444069.612.36$1,040
Aug 202454375.632.06$1,121
Jul 202458679.932.15$1,258
Jun 202457578.082.63$1,515
May 202459378.812.20$1,304
Apr 202451184.451.66$848
Mar 202450480.301.55$779
Feb 202432876.091.78$585
Jan 202425373.023.30$834
Dec 202327971.262.61$728
Nov 202325277.892.81$708
Oct 202324585.443.09$756
Sep 202359489.042.74$1,625
Aug 202367780.522.67$1,810
Jul 202371874.852.64$1,897
Jun 202369968.962.26$1,579
May 202368770.622.23$1,530
Apr 202362278.122.24$1,392
Mar 202359372.852.39$1,419
Feb 202333275.112.47$819
Jan 202355476.533.39$1,877
Dec 202248276.415.73$2,761
Nov 202246885.005.65$2,642
Oct 202250487.185.86$2,955
Sep 202245284.888.16$3,690
Aug 202241394.529.13$3,770
Jul 2022425101.587.54$3,205
Jun 2022400115.097.98$3,191
May 2022401109.378.43$3,382
Apr 2022325104.226.84$2,222
Mar 2022374108.885.08$1,899
Feb 202230891.054.86$1,497
Jan 202233481.844.54$1,516
Dec 202134571.323.90$1,345
Nov 202132077.435.24$1,676
Oct 202129079.795.71$1,657
Sep 202158869.865.35$3,146
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 202128663.483.02$863
Apr 202131260.362.76$861
Mar 202131561.302.72$856
Feb 202128257.805.55$1,565
Jan 202135450.412.81$995
Dec 202034744.642.68$928
Nov 202034638.772.71$936
Oct 202038136.972.48$944
Sep 202031737.091.99$631
Aug 202033039.982.39$787
Jul 202031638.371.83$577
Jun 202030334.901.69$512
May 202032716.921.81$593
Apr 202032514.751.80$586
Mar 202037130.341.86$689
Feb 202032949.881.98$652
Jan 202035357.252.09$739
Dec 201934559.012.30$795
Nov 201934855.302.75$957
Oct 201936553.472.42$883
Sep 201934855.052.66$925
Aug 201937153.112.30$855
Jul 201937156.272.46$913
Jun 201936952.782.49$919
May 201936458.482.74$997
Apr 201929762.632.75$817
Mar 201933756.803.06$1,032
Feb 201930450.852.79$849
Jan 201934546.033.23$1,114
Dec 201836746.594.19$1,536
Nov 201832152.934.24$1,360
Oct 201835261.443.40$1,196
Sep 201834359.543.11$1,066
Aug 201837059.403.07$1,135
Jul 201838065.142.93$1,114
Jun 201836560.183.08$1,123
May 201836665.382.90$1,062
Apr 201836663.842.90$1,062
Mar 201839261.222.79$1,092
Feb 201831961.782.77$882
Jan 201836362.874.01$1,455
Dec 201736057.272.92$1,052
Nov 201735455.423.12$1,104
Oct 201736149.292.98$1,077
Sep 201734447.523.09$1,062
Aug 201736345.373.00$1,091
Jul 201738243.873.09$1,179
Jun 201736542.493.09$1,127
May 201738345.373.26$1,250
Apr 201738747.933.21$1,243
Mar 201777846.772.98$2,321
Feb 201736250.452.95$1,069
Jan 201738449.413.42$1,313
Dec 201637648.763.72$1,400
Nov 201638742.492.64$1,023
Oct 201637946.193.09$1,171
Sep 201635741.553.10$1,107
Aug 201639941.442.92$1,167
Jul 201636541.622.92$1,067
Jun 201639445.352.69$1,058
May 201640142.521.99$798
Apr 201637436.561.99$745
Mar 201642333.011.79$759
Feb 201639826.472.06$821
Jan 201642527.352.36$1,005
Dec 201547132.362.00$943
Nov 201542338.792.17$917
Oct 201546243.552.43$1,121
Sep 201545442.992.76$1,252
Aug 201546940.162.87$1,347
Jul 201546648.152.95$1,372
Jun 201551956.152.88$1,496
May 201537655.212.96$1,111
Apr 201546449.822.71$1,256
Mar 201548042.892.93$1,409
Feb 201544344.662.98$1,318
Jan 201549143.433.10$1,522
Dec 201449154.693.59$1,763
Nov 201449670.464.25$2,109
Oct 201450278.303.90$1,958
Sep 201448786.164.05$1,970
Aug 201450689.394.04$2,042
Jul 201451096.564.18$2,132
Jun 201449698.164.74$2,349
May 201451594.734.73$2,434
Apr 201450195.944.81$2,409
Mar 201452195.895.06$2,635
Feb 201447197.406.19$2,916
Jan 201451990.404.86$2,523
Dec 201354891.824.35$2,386
Nov 201350688.853.74$1,892
Oct 201353197.423.78$2,007
Sep 2013493104.113.72$1,833
Aug 2013525104.253.52$1,849
Jul 2013871102.523.72$3,238
Jun 201337194.403.93$1,459
May 201337394.834.15$1,548
Apr 201349993.964.28$2,137
Mar 201345093.623.91$1,761
Feb 201349291.233.42$1,683
Jan 201355291.603.42$1,888
Dec 201254486.773.42$1,861
Nov 201256386.953.62$2,041
Oct 201256189.383.40$1,907
Sep 201254294.672.92$1,582
Aug 201255292.662.91$1,605
Jul 201261785.133.02$1,864
Jun 201255179.822.52$1,388
May 201258091.612.49$1,443
Apr 2012570101.652.00$1,138
Mar 2012583105.052.22$1,295
Feb 2012536101.102.57$1,378
Jan 201257798.092.73$1,578
Dec 201158596.873.24$1,895
Nov 201157895.723.31$1,914
Oct 201159084.983.65$2,153
Sep 201157283.623.99$2,280
Aug 201158683.404.15$2,432
Jul 201156894.144.52$2,566
Jun 201159592.904.64$2,761
May 201176698.134.40$3,374
Apr 2011418105.964.33$1,811
Mar 201163296.364.06$2,564
Feb 201157085.644.18$2,383
Jan 201162686.504.59$2,873
Dec 201062785.734.35$2,726
Nov 201061080.843.80$2,315
Oct 201063378.103.51$2,221
Sep 201061572.633.98$2,447
Aug 201061073.684.42$2,696
Jul 201062172.554.74$2,941
Jun 201062070.364.91$3,044
May 201065871.124.24$2,787
Apr 201066181.694.12$2,725
Mar 201068378.394.39$2,997
Feb 201064573.585.44$3,510
Jan 201075074.365.96$4,473
Dec 200919371.445.48$1,058
Nov 200965074.593.75$2,438
Oct 200968772.544.11$2,824
Sep 200966965.543.06$2,050
Aug 200969567.423.22$2,237
Jul 200969961.133.46$2,422
Jun 200968166.163.90$2,653
May 200977354.743.93$3,035
Apr 200969746.773.59$2,500
Mar 200973842.144.06$2,996
Feb 200966032.814.63$3,058
Jan 200972335.865.37$3,883
Dec 200873137.105.98$4,369
Nov 200873455.496.86$5,036
Oct 200874775.246.92$5,171
Sep 2008694101.767.88$5,467
Aug 2008750114.228.48$6,362
Jul 2008996131.0811.39$11,344
Jun 2008660131.3313.03$8,602
May 2008794123.1711.57$9,190
Apr 2008818110.3110.45$8,552
Mar 2008893101.909.66$8,630
Feb 200869692.538.77$6,104
Jan 200871990.388.21$5,900
Dec 200762688.337.30$4,571
Nov 200770491.677.29$5,133
Oct 200770182.856.92$4,852
Sep 200769775.846.24$4,352
Aug 200772869.066.39$4,650
Jul 200777370.906.39$4,938
Jun 200777562.007.55$5,850
May 200773858.747.85$5,791
Apr 200771459.617.81$5,573
Mar 200771456.927.30$5,214
Feb 200757555.108.22$4,724
Jan 200764650.306.73$4,346
Dec 200667856.656.92$4,691
Nov 200687754.207.62$6,681
Oct 200695654.906.01$5,749
Sep 20061,00860.085.04$5,078
Aug 200682868.717.34$6,077
Jul 200682269.376.34$5,214
Jun 200689266.286.38$5,694
May 200692066.016.42$5,911
Apr 200689964.397.36$6,617
Mar 200699656.707.08$7,055
Feb 200697357.597.75$7,542
Jan 20061,12660.598.93$10,059
Dec 20051,03354.9413.42$13,858
Nov 20051,00754.6910.59$10,663
Oct 20051,21558.3413.80$16,762
Sep 20051,02661.4512.08$12,393
Aug 200594061.519.80$9,209
Jul 20051,10955.697.84$8,699
Jun 20051,11952.337.38$8,259
May 20051,15545.226.65$7,682
Apr 20051,10449.207.36$8,126
Mar 20051,13350.377.15$8,106
Feb 20051,10045.226.31$6,943
Jan 20051,19843.166.32$7,574
Dec 20041,26739.866.75$8,554
Nov 20041,16545.286.33$7,375
Oct 20041,29149.706.52$8,411
Sep 20041,18543.245.28$6,261
Aug 20041,33642.375.55$7,416
Jul 20041,46038.286.08$8,883
Jun 20041,47136.106.43$9,463
May 20041,50237.486.49$9,755
Apr 20041,38434.475.86$8,108
Mar 20041,52134.365.53$8,411
Feb 20041,48032.455.51$8,154
Jan 20041,62032.036.30$10,205
Dec 20031,72530.266.30$10,870
Nov 20031,27128.804.60$5,840
Oct 20031,35528.174.76$6,449
Sep 20031,58926.314.75$7,547
Aug 20031,81429.765.13$9,305
Jul 20031,78829.415.17$9,245
Jun 2003028.565.98$0
May 2003026.595.97$0
Apr 20031,74826.675.41$9,452
Mar 20032,18431.146.10$13,314
Feb 20031,13933.487.93$9,028
Jan 20032,00030.315.58$11,164
Dec 20022,16526.914.85$10,508
Nov 20022,61824.664.14$10,831
Oct 20023,14826.464.23$13,313
Sep 20023,24527.443.64$11,796
Aug 20024,46025.963.16$14,112
Jul 20023,75624.583.06$11,500
Jun 2002023.733.34$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                  466 Mcf  × $  3.05 =     $1,419

────────────────────────────────────────────────────
Month total                                   $1,419

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/191137 is the state's own key, not one this site invented.