MONTGOMERY, W. C. GAS UNIT B

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 192618District 7CField 679952002 tax incentive programmesGasSaveExport
Value, all time
$1.3 M
Oct 2002 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
284
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-05-16150541
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction251,017 Mcf$1,323,653
Total$1,323,653

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5549, -101.2843. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.55487, -101.28431 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,860 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,860 ft.

Completions filed
Oct 2002
1 of 1 wells

1 well

42-10538890386,860 ftOct 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (284)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

284 months

May 2026343106.413.05$1,045
Apr 202630298.932.87$867
Mar 202630489.753.15$957
Feb 202626863.503.75$1,005
Jan 202630059.138.00$2,399
Dec 202530956.664.41$1,364
Nov 202531858.593.93$1,249
Oct 202529259.383.30$965
Sep 202531962.743.08$982
Aug 202534163.933.01$1,028
Jul 202534366.743.32$1,137
Jun 202539766.483.13$1,242
May 20259260.553.23$297
Apr 202523662.363.54$836
Mar 202529167.704.27$1,242
Feb 202526270.884.34$1,137
Jan 202528374.324.28$1,211
Dec 202430468.993.12$949
Nov 202430769.052.20$675
Oct 202435671.372.28$812
Sep 202426669.612.36$629
Aug 202432575.632.06$671
Jul 202431679.932.15$678
Jun 202433578.082.63$882
May 202430878.812.20$677
Apr 202428884.451.66$478
Mar 202432480.301.55$501
Feb 202430076.091.78$535
Jan 202431673.023.30$1,042
Dec 202332971.262.61$859
Nov 202332577.892.81$912
Oct 202331385.443.09$966
Sep 202332589.042.74$889
Aug 202333780.522.67$901
Jul 202336674.852.64$967
Jun 202331268.962.26$705
May 202331470.622.23$699
Apr 202331378.122.24$700
Mar 202331472.852.39$751
Feb 202326675.112.47$656
Jan 202327676.533.39$935
Dec 202229676.415.73$1,696
Nov 202232585.005.65$1,835
Oct 202240987.185.86$2,398
Sep 202231384.888.16$2,555
Aug 202237694.529.13$3,432
Jul 2022433101.587.54$3,266
Jun 2022324115.097.98$2,585
May 2022436109.378.43$3,677
Apr 2022379104.226.84$2,591
Mar 2022353108.885.08$1,792
Feb 202230791.054.86$1,492
Jan 202232681.844.54$1,479
Dec 202126071.323.90$1,014
Nov 202131377.435.24$1,639
Oct 202129979.795.71$1,708
Sep 202138569.865.35$2,060
Aug 202139766.024.22$1,676
Jul 202144070.783.98$1,752
Jun 202145669.493.38$1,542
May 202136463.483.02$1,098
Apr 202138560.362.76$1,062
Mar 202148361.302.72$1,312
Feb 202128057.805.55$1,553
Jan 202139050.412.81$1,096
Dec 202031144.642.68$832
Nov 202023438.772.71$633
Oct 202037436.972.48$927
Sep 202037037.091.99$737
Aug 202040339.982.39$961
Jul 202039338.371.83$717
Jun 202034434.901.69$581
May 202047916.921.81$869
Apr 202039114.751.80$706
Mar 202040230.341.86$746
Feb 202040849.881.98$808
Jan 202037657.252.09$788
Dec 201948159.012.30$1,108
Nov 201939255.302.75$1,078
Oct 201946953.472.42$1,134
Sep 201948855.052.66$1,297
Aug 201951353.112.30$1,182
Jul 201949156.272.46$1,208
Jun 201956252.782.49$1,400
May 201942358.482.74$1,159
Apr 201941962.632.75$1,153
Mar 201944756.803.06$1,369
Feb 201942250.852.79$1,178
Jan 201943146.033.23$1,391
Dec 201837746.594.19$1,578
Nov 201839152.934.24$1,657
Oct 201839861.443.40$1,352
Sep 201843359.543.11$1,346
Aug 201842859.403.07$1,312
Jul 201839465.142.93$1,155
Jun 201840760.183.08$1,252
May 201841065.382.90$1,189
Apr 201832663.842.90$946
Mar 201844461.222.79$1,237
Feb 201839361.782.77$1,087
Jan 201846262.874.01$1,852
Dec 201743957.272.92$1,283
Nov 201722455.423.12$699
Oct 201742149.292.98$1,256
Sep 201744247.523.09$1,365
Aug 201746245.373.00$1,388
Jul 201746343.873.09$1,429
Jun 201744242.493.09$1,365
May 201746045.373.26$1,501
Apr 201751247.933.21$1,644
Mar 20171,06046.772.98$3,163
Feb 201745050.452.95$1,329
Jan 201749849.413.42$1,703
Dec 201648848.763.72$1,817
Nov 201650342.492.64$1,330
Oct 201649246.193.09$1,520
Sep 201648541.553.10$1,504
Aug 201653241.442.92$1,556
Jul 201648841.622.92$1,427
Jun 201650345.352.69$1,351
May 201651942.521.99$1,033
Apr 201650936.561.99$1,013
Mar 201653433.011.79$958
Feb 201649926.472.06$1,030
Jan 201653427.352.36$1,263
Dec 201553932.362.00$1,079
Nov 201553638.792.17$1,162
Oct 201555443.552.43$1,344
Sep 201557842.992.76$1,594
Aug 201560340.162.87$1,732
Jul 201560148.152.95$1,770
Jun 201565656.152.88$1,891
May 201547255.212.96$1,395
Apr 201553549.822.71$1,448
Mar 201558842.892.93$1,726
Feb 201553644.662.98$1,595
Jan 201558343.433.10$1,808
Dec 201469354.693.59$2,489
Nov 201455670.464.25$2,364
Oct 201462078.303.90$2,419
Sep 201462986.164.05$2,545
Aug 201463289.394.04$2,550
Jul 201462596.564.18$2,612
Jun 201463998.164.74$3,027
May 201460794.734.73$2,869
Apr 201462595.944.81$3,006
Mar 201467995.895.06$3,434
Feb 201456397.406.19$3,486
Jan 201463590.404.86$3,087
Dec 201363691.824.35$2,769
Nov 201355188.853.74$2,060
Oct 201376797.423.78$2,899
Sep 2013501104.113.72$1,863
Aug 2013652104.253.52$2,297
Jul 2013727102.523.72$2,703
Jun 201372394.403.93$2,844
May 201381094.834.15$3,361
Apr 201357593.964.28$2,462
Mar 201373093.623.91$2,856
Feb 201364691.233.42$2,209
Jan 201371991.603.42$2,459
Dec 201274686.773.42$2,551
Nov 201266686.953.62$2,414
Oct 201273889.383.40$2,509
Sep 201288394.672.92$2,577
Aug 201268492.662.91$1,989
Jul 201267385.133.02$2,033
Jun 201268779.822.52$1,731
May 201274591.612.49$1,854
Apr 2012773101.652.00$1,544
Mar 2012745105.052.22$1,655
Feb 2012710101.102.57$1,825
Jan 201265998.092.73$1,802
Dec 201182496.873.24$2,670
Nov 201177095.723.31$2,550
Oct 201185084.983.65$3,101
Sep 201180283.623.99$3,197
Aug 201187083.404.15$3,610
Jul 201182694.144.52$3,731
Jun 201184792.904.64$3,930
May 20111,09398.134.40$4,814
Apr 2011656105.964.33$2,843
Mar 201174696.364.06$3,027
Feb 201182685.644.18$3,453
Jan 20111,01086.504.59$4,635
Dec 201072885.734.35$3,165
Nov 201070980.843.80$2,691
Oct 201072978.103.51$2,558
Sep 201070872.633.98$2,817
Aug 201074173.684.42$3,275
Jul 201076172.554.74$3,604
Jun 201076870.364.91$3,771
May 201079471.124.24$3,363
Apr 201083581.694.12$3,442
Mar 20101,23778.394.39$5,429
Feb 20101,10173.585.44$5,992
Jan 20101,07074.365.96$6,382
Dec 20091,46871.445.48$8,050
Nov 20091,12874.593.75$4,232
Oct 20091,26972.544.11$5,216
Sep 20091,27165.543.06$3,895
Aug 20091,26967.423.22$4,084
Jul 20091,33861.133.46$4,636
Jun 20091,33966.163.90$5,215
May 20091,42654.743.93$5,598
Apr 20091,10846.773.59$3,975
Mar 20091,66742.144.06$6,766
Feb 20091,47032.814.63$6,811
Jan 20091,57535.865.37$8,459
Dec 20081,53037.105.98$9,145
Nov 20081,29755.496.86$8,898
Oct 20081,11275.246.92$7,697
Sep 2008690101.767.88$5,435
Aug 20081,359114.228.48$11,528
Jul 2008899131.0811.39$10,239
Jun 2008736131.3313.03$9,592
May 20081,606123.1711.57$18,588
Apr 20081,457110.3110.45$15,233
Mar 20081,939101.909.66$18,739
Feb 20081,43892.538.77$12,612
Jan 20081,53890.388.21$12,620
Dec 20072,07788.337.30$15,166
Nov 20071,06691.677.29$7,773
Oct 20071,25482.856.92$8,680
Sep 20071,44875.846.24$9,042
Aug 20071,33969.066.39$8,553
Jul 20071,51270.906.39$9,659
Jun 200764862.007.55$4,891
May 200778158.747.85$6,128
Apr 200759559.617.81$4,644
Mar 200777556.927.30$5,659
Feb 200770255.108.22$5,768
Jan 200778650.306.73$5,287
Dec 200658856.656.92$4,068
Nov 20061,01154.207.62$7,701
Oct 20061,35754.906.01$8,161
Sep 20061,43560.085.04$7,228
Aug 200647468.717.34$3,479
Jul 200657269.376.34$3,628
Jun 200689066.286.38$5,682
May 200669566.016.42$4,465
Apr 200691164.397.36$6,705
Mar 20061,09456.707.08$7,749
Feb 20061,20957.597.75$9,371
Jan 20061,94560.598.93$17,375
Dec 20051,68754.9413.42$22,632
Nov 200553354.6910.59$5,644
Oct 20051,34558.3413.80$18,555
Sep 20051,00461.4512.08$12,127
Aug 20051,63361.519.80$15,998
Jul 20051,81055.697.84$14,197
Jun 20051,97052.337.38$14,541
May 20052,06745.226.65$13,748
Apr 20051,52049.207.36$11,188
Mar 20052,10350.377.15$15,047
Feb 20052,11545.226.31$13,350
Jan 20051,84043.166.32$11,633
Dec 20042,17539.866.75$14,684
Nov 20041,35445.286.33$8,571
Oct 20042,67849.706.52$17,447
Sep 20041,73943.245.28$9,189
Aug 20042,38042.375.55$13,211
Jul 20042,46638.286.08$15,004
Jun 20042,90436.106.43$18,681
May 20042,68937.486.49$17,464
Apr 20042,68934.475.86$15,753
Mar 20043,20634.365.53$17,730
Feb 2004032.455.51$0
Jan 2004032.036.30$0
Dec 2003030.266.30$0
Nov 2003028.804.60$0
Oct 20033,40128.174.76$16,188
Sep 2003026.314.75$0
Aug 20034,76929.765.13$24,464
Jul 2003029.415.17$0
Jun 2003028.565.98$0
May 20034,41826.595.97$26,387
Apr 20033,25926.675.41$17,622
Mar 20033,64831.146.10$22,238
Feb 20035,11533.487.93$40,541
Jan 20036,63630.315.58$37,042
Dec 20027,10826.914.85$34,501
Nov 20029,60324.664.14$39,727
Oct 20022,62026.464.23$11,080

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                  343 Mcf  × $  3.05 =     $1,045

────────────────────────────────────────────────────
Month total                                   $1,045

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/192618 is the state's own key, not one this site invented.